Accept proposal and authorize staff to engage with HKGI to provide Project
Management Services for the Lake Rebecca Park Redevelopment Project.
Background Information:
The City of Hastings received $1M in grant funding from the LCCMR/ENRTF
to complete a redevelopment project at Lake Rebecca Park. The project will
include development of a master plan which focuses on habitat restoration,
enhancement and expansion as well as redevelopment of the Lake Rebecca
parking lots, boat launch and trails.
Project management services were solicited for this project due to limited
staff capacity, and the complexity of this project and it’s funding and
reporting requirements.
Staff solicited proposals from seven consulting firms, three were returned.
Proposals received were from SRF at a cost of $125,000.00, SEH at a cost
of $89,919.06, and HKGI at a cost of $89,500.00.
HKGI’s proposal meets the needs of the City and was the lowest cost at
$89,500.00.
Financial Impact:
This project and the cost for project management is 100% grant funded.
Advisory Commission Discussion:
N/A
Council Committee Discussion:
N/A
Attachments:
▪ HKGI proposal
X-B-01
PROPOSAL AND QUALIFICATIONS FORLAKE REBECCA PROJECT MANAGEMENT SERVICES HASTINGS, MINNESOTA
Prepared by HKGi
May 18, 2023
Trail
connectivity
Water
Quality
Habitat
Enhancement
& Restoration
Efforts
MISSISSIPPI RIVER
LAKE
REBECCA
Boat launch
Parking
Vehicle access
Dock
X-B-01
2 Proposal - Lake Rebecca Project Management Services - City of Hastings
Thursday, May 18, 2023
Chris Jenkins, Parks & Recreation Director
City of Hastings
920 10th St West
Hastings, MN 55033
RE: Project Management Services for the Lake Rebecca Master Planning and Habitat Enhancement and
Restoration Projects
Dear Chris,
HKGi is pleased to provide the City of Hastings with this proposal to provide project management
services for the Lake Rebecca Master Planning and Habitat Enhancement and Restoration Projects. For
over 40 years, HKGi has worked with our community clients to manage and plan complex projects, and
our knowledge, experience, and approach will provide the city with an effective and efficient process
that will consider all options and objectives, facilitate and incorporate input of necessary agencies and
stakeholders, and lead to a successful outcome.
As landscape architects and planners, we look at project sites comprehensively and holistically. For
a successful project, we must consider the context of a site, which includes the physical conditions,
environment and sustainability, natural resources and wildlife, stomwater management and water quality,
infrastructure, site access and recreation, cultural and historical background, economic and budget
considerations, long-term operations and maintenance, and existing and potential future uses. A long-
term ecological management plan is a key element for the Lake Rebecca project to have to increase the
long-term success and durability of the restoration of the site. We know when to incorporate specialty
analysis and design professionals and have relationships with multiple local and regional civil and
structural engineers, water resource engineers, architects, and product vendors.
X-B-01
3 Understanding & Approach
We understand that the project is funded through grants from LCCMR/ENRTF and must be completed by
June 30, 2025. The total grant amount is $1,000,000, which includes fees for project management (estimated
at $100,000) and master planning and design services (estimated at $150,000). Several steps are needed
in order for the project to meet the grant funding requirements and report status updates to the city and
grant administrator. Habitat enhancement and water quality are key elements for the project to consider and
address. Due to the wide variability in water levels on the site, significant care and consideration must be given
to planning facilities that are able to tolerate the seasonal conditions and bounce in river elevation. Creativity
and functionality will be important during the master planning process.
We also understand that the firm selected for project management services may submit a proposal for the
master planning task. If selected for both tasks, we would provide a greater efficiency to the completion of this
project, including reduced fees on both the project management and master planning efforts.
HKGi staff are familiar with the City of Hastings through our past work on numerous projects in the city,
most recently the City of Hastings People Movement Plan, which included in-depth mapping and analysis
of the city’s pedestrian and bicycle system, part of which moves through the Lake Rebecca area. Our work
with Dakota County has included master planning and design work for the County Parks Department, and
park planning, greenway planning, and grant writing for the County Office of Planning. In 2018, we worked
with Dakota County and the City of Hastings to complete the Vermillion River Greenway Master Plan for the
Hastings segment.
HKGi’s experience working on many river-based park sites with complex and challenging master planning and
development projects, including recent park design projects on the Mississippi and St. Croix Rivers, provides
us with the knowledge needed for the Lake Rebecca project management.
»City of Stillwater Lumberjack Landing Park: Working with the City of Stillwater, HKGI led multi-disciplinary
teams to master plan, facilitate stakeholder and agency discussions, and develop construction documents
for the Lumberjack Landing Park improvements, including a new ADA accessible boat launch, driveway and
parking, ADA accessible trails and pathways, vegetation and restoration efforts, and ADA accessible fishing
pier and overlook. Agency involvement has included MN DNR Parks and Trails, Fisheries, and Hydrology;
Army Corps of Engineers; MN SHPO; National Park Service; Washington County
»We worked with the City of Otsego and multiple local stakeholder and agency representatives on planning
and a grant funding application for the Carrick’s Landing river access on the Mississippi River.
X-B-01
4 Proposal - Lake Rebecca Project Management Services - City of Hastings
Project Approach
We plan to lead an efficient and comprehensive project management effort supported by our previous
experience, local and regional knowledge, and familiarity with the City of Hastings. HKGi staff will serve as
a representative of the City of Hastings and be responsive and flexible as needed by the Director of Parks
and Recreation. A general outline of project tasks and a framework to the project management approach is
outlined below.
Task 1: Project Kick off & Ongoing Communication
Our first task will be to kick off the project with staff to understand the overall project schedule and key
milestones. Following the initial kick off meeting, we plan to provide weekly status updates to city staff to
keep everyone up to date with necessary information and ongoing work. Items reviewed will include: project
schedule, upcoming tasks, and questions/coordination items. HKGi will work with city staff to schedule
meetings for project status updates as well as master planning kick off and coordination, agency and
stakeholder review, and construction meetings. We will keep a detailed project schedule and update it weekly
throughout the project. During the project, we will provide updates to staff, City Commissions, and City
Council as needed to provide information and seek input and approvals.
Task 2: Review LCCMR/ENRTF & Meet Reporting Requirements
At the onset of the project, we will become familiar with all necessary requirements for the Legislative-Citizen
Commission on Minnesota Resources (LCCMR)/Environment and Natural Resources Trust Fund (ENRTF) for
the grant funding. We will outline a process and timeline to complete reporting, to follow requirements for
consultant solicitation, and invoicing properly to ensure payments and reimbursements are made.
Task 3: Develop Master Planning RFP and Facilitate Selection of Consultant
HKGi has worked with many agencies to write RFPs for a variety of planning and design project types.
Our experience in RFP development for clients will be a starting point to develop a comprehensive and
straightforward scope of work with clear instructions for submittals. We will work to develop a draft RFP
for staff to review soon after kicking off the project. The RFP will be distributed to qualified consultants—
submittals will be collected, reviewed, and evaluated with a recommendation to hire a qualified consultant
within weeks of beginning the project.
Task 4: Master Planning & Design Process
We will work with the selected master planning team to ensure necessary scope and planning work is
completed comprehensively and following the timeline. The master plan is anticipated to include the
following elements: redesign of one parking lot, removal of a second parking lot, design and coordination
of a new boat ramp, natural resources restoration and habitat enhancement, and trail and vehicle access
throughout the site. We will ensure that all necessary agency reviews and permits are planned for early in
the project, to potentially include, but not limited to, USACE, MN DNR, and SHPO. Other groups will also
be engaged, such as Friends of the Mississippi River to gain additional insight into project sequencing.
Understanding the timeframe for jurisdictional review and approval along with the corresponding timeframe
for construction for key elements of the work (utilities & infrastructure, habitat restoration etc.) with seasonal
characteristics of the river will be critical to successful implementation.
Meetings and updates with city staff, the Parks & Recreation Commission, Council Committees, and City
Council will be scheduled and planned in order to meet packet and agenda deadlines. HKGi will represent
the city’s needs and desires and keep all parties informed during the process. Beginning the master planning
process as early as possible will allow site analysis work to take place in the summer and fall months, with
technical design and final design occurring in the winter months.
X-B-01
5 Understanding & Approach
Task JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
20
2
4
-
J
A
N
FE
B
MA
R
AP
R
MA
Y
JU
N
JU
L
AU
G
SE
P
OC
T
NO
V
DE
C
20
2
5
-
J
A
N
FE
B
MA
R
AP
R
MA
Y
JU
N
Project Kick off & Ongoing Communication
LCCMR/ ENRTF Reporting
Develop RFP for Master Planning work
Master Planning & Design Process
Final Design & Bidding
Construction Administration
Final Walk Through
Task 5: Final Design & Bidding
Following completion and approval the master plan and implementation schedule, we will work with the
design team to develop the final design and construction documents, including front end general conditions
and technical specifications in a bidding package to solicit contractor bids at the end of 2023, early part
of 2024. This work includes publishing the ad for bid, posting the bid documents, responding to bidders’
questions, holding a pre-bid meeting, issuing addendum if required, reviewing bids, and recommending and
selecting a qualified bidder. Construction is planned to begin in the spring of 2024, with spring water levels
impacting the start of construction.
Task 6: Construction & Implementation
In coordination with city staff and the design team, we will facilitate a pre-construction meeting with the
selected contractor and provide construction administration and observation during the construction
process. Core tasks will include coordinating agreements and notice to proceed with the contractor, providing
construction observation, confirming staking, reviewing submittals, coordinating required site testing,
reviewing pay requests and recommending/coordinating payments, developing preliminary and final punch
lists, and facilitating the development of project closeout documents.
Task 7: Project Closeout and Final Walk Through
At the completion of project construction, we will ensure that the project has met the requirements of the city
and the LCCMR/ENRTF funding. A final meeting will be held on the site to view the project implementation,
discuss ongoing operations and maintenance needs, and hand off the project to the city.
Proposed Project Schedule
Our proposed schedule identifies broad timelines for the general tasks outlined above. We will develop a more
detailed schedule with target dates, milestones, meetings, and other seasonal deadlines at the onset of the
project.
X-B-01
6 Proposal - Lake Rebecca Project Management Services - City of Hastings
Gabrielle Grinde, PLA (MN)
Vice President
612.252.7141 gabrielle@hkgi.com
Proposed Staff
We propose to manage this project with two key staff, both are licensed Landscape Architects in the State of
Minnesota. HKGi staff will work closely to keep each other informed of project status.
Gabrielle Grinde, PLA (MN) will serve as the Principal in Charge and Primary Project Manager for the project
and will oversee the overall progress and success of the project. She will be the daily point of contact and
contribute to the project management process, applying her expertise in complex natural resource-based
parks and trails. She will also serve as the lead on any agency and stakeholder meetings and communication
tasks.
Tim Solomonson, PLA (MN) will serve as a secondary Project Manager for the project and will be the
technical lead. He will be responsible for the organization of key tasks throughout the master planning and
construction process. Tim has a great deal of experience working with contractors on complex park design
and implementation projects, as well as translating conceptual ideas into clear and effective construction
documents.
Proposed Fees
It is estimated that project management efforts will require between two and eight hours of work per week.
This range will fluctuate during the process and between the two staff identified to work on this project. We
estimate the project management fees per task as identified below.
TASK FEES
Project Kick off & Ongoing Communication $35,000
LCCMR/ ENRTF Reporting $11,000
Develop RFP for Master Planning work $3,500
Master Planning & Design process $13,500
Final Design & Bidding $11,000
Construction Administration $12,000
Final Walk Through $2,000
Project Expenses (mileage and printing)$1,500
Total Fees $89,500
We look forward to the opportunity to lead such an important project for the City of Hastings and the
Mississippi River!
Sincerely,
X-B-01
7 Proposed Fees
REFERENCES
Ross Demant
Wright County Parks and Recreation Director
763-684-8446
Ross.Demant@co.wright.mn.us
Nick Jacobs
City of Otsego Parks and Recreation Director
763-334-3170
NJacobs@ci.otsego.mn.us
Shawn Sanders
Director of Public Works
City of Stillwater
651-430-8835
ssanders@ci.stillwater.mn.us
Ben Anderson
Parks Director
Stearns County Parks
320-654-4725
Benjamin.Anderson@stearnscountymn.gov
X-B-01
8 Proposal - Lake Rebecca Project Management Services - City of Hastings
HKGi
HKGi was established in 1982 to provide community-
based planning and landscape architecture services
to clients throughout the Upper Midwest.
Park planning was one of HKGi’s original core
services, and we have stayed true to our roots by
building a staff full of people who are passionate
about the outdoors and are equally passionate
about helping communities build outstanding
places for living, working, and playing. Our
planners and landscape architects bring a wealth of
experience and knowledge about the programming,
sustainability, community engagement, and
operations issues that park and recreation planning
projects must address. They also provide skilled
project leadership, ensuring that projects stay on
budget and on schedule.
FI
R
M
P
R
O
F
I
L
E
612.338.0800
www.hkgi.com
800 Washington Ave. N., Suite 103
Minneapolis, Minnesota 55401
CREATING PLACES THAT ENRICH PEOPLE’S LIVES
PRINCIPALS
Paul Paige, President
Brad Scheib, Vice President
Bryan Harjes, Vice President
Gabrielle Grinde, Vice President
ASSOCIATES
Rita Trapp
Jeff Miller
Lance Bernard
STAFF
4 Certified Planners
8 Licensed Landscape Architects
7 Planners/Urban Designers
2 Marketing Communications
COLLABORATE | LISTEN | EXPLORE | CREATE
X-B-01
9 Proposed Fees
<Align image to this guide
Park, trail, recreation, and open space planning have been
important components of Gabrielle’s work throughout her
career. She has been a key contributor to the development
of Dakota County’s greenway network. She has conducted
master planning for most of the system’s greenways,
contributed to the development of design guidelines,
been involved in grant writing, and provided design
services for a segment of the River to River Greenway.
Gabrielle’s portfolio also includes providing design services
on a variety of park, trail, and open space improvement
projects. She is currently providing leadership for the
design of a new riverfront park in Stillwater, Lumberjack
Landing. This challenging project involves engagement
with several agencies at the federal, state, and county level
and coordinating design review with these organizations.
She has also provided leadership for a new Mississippi
River access point in Otsego, Carrick’s Landing, that also
involves multiple agencies and compliance with several
layers of design requirements.
Relevant Project Experience
»Lumberjack Landing Park Master Plan and
Improvements | Stillwater, MN
»Carrick’s Landing Concept Plan and Improvements |
Otsego, MN
»People Movement Plan | Hastings, MN
»Lake Ann Park Improvements | Chanhassen, MN
»Countryside Park Site Design | Edina, MN
»Greenway Guidebook and Greenway Master Plans |
Dakota County, MN
»Minnehaha Park Refectory Site Design | Minneapolis, MN
Gabrielle Grinde
ASLA, PLA (MN)
Vice President
612.252.7141
gabrielle@hkgi.com
Years of Experience: 15
EducationMaster of Landscape Architecture, University of Minnesota
Bachelor of Arts-Political Science, University
of Wisconsin-Madison
RegistrationLandscape Architect, Minnesota License No. 50416
Awards
2020 MRPA Award of Excellence -
Hutchinson Parks, Recreation and
Community Education System Plan
2015 MN APA Planning in Context Award - Moorhead River Corridor Plan
2015 MN APA Innovation in Planning Award
- Lanesboro Arts Campus Vision Plan
2015 MNDOT Stewardship Award in Transportation and the Natural Environment - River to River Greenway, Dakota County, MN
2015 ASLA-MN Merit Award for Analysis and
Planning - Parks and Recreation Master Plan,
Duluth, MN
2015 ACEC-MN Engineering Excellence Honor Award - Downtown Commons Enhancements, Buffalo, MN
X-B-01
10 Proposal - Lake Rebecca Project Management Services - City of Hastings
<Align image to this guide
Tim is skilled at providing landscape architecture services
on site, streetscape, public space, and trail and park design
projects. These services include conceptual design,
design development, construction documentation, cost
estimation, and construction administration.
Tim has built a growing portfolio of park and site design
and construction projects. He brings an attention-to-
detail and an understanding of how to translate design
intent, as expressed in concept and design drawings, into
construction documentation and, ultimately, built work.
Tim is a veteran who has worked and interacted with a
diverse range of peoples and cultures, not only during
his service, but also while participating in collegiate
study abroad programs. His experience and skills enable
him to provide support for many of HKGi’s community
engagement initiatives.
Relevant Project Experience
»Andrews Park Site Design | Champlin, MN
»Veterans Park Site Design | Chaska, MN
»Gleason Fields Improvements | Maple Grove, MN
»Fernbrook Fields Athletic Complex | Maple Grove, MN
»Downtown Hwy 41/61 Streetscape Design | Chaska, MN
»People Movement Plan | Hastings, MN
»South Valley Park Improvements | Inver Grove Heights,
MN
»Keewaydin Park Improvements | Minneapolis, MN
»Bassett’s Creek Park Improvements | Minneapolis, MN
»Robert Piram Regional Trail Design | Saint Paul and
Dakota County, MN
Tim Solomonson
PLA (MN)
Landscape Architect
612.252.7137
tim@hkgi.com
Years of Experience: 11
Education
Master of Urban and Regional Planning,
Master of Landscape Architecture, and
Bachelor of Environmental Design,
University of Minnesota
Registration
Landscape Architect, Minnesota, License No.
53837
Awards
2018 ASLA-MN Merit Award for Planning
and Urban Design - St. Louis River Estuary
National Water Trail Master Plan
2017 MN APA Success Stories in
Implementation Award - Downtown Master
Plan and Streetscape Reconstruction,
Chaska, MN
2015 MN APA Planning in Context Award -
Red River Corridor Master Plan, Moorhead,
MN
X-B-01
11 Relevant Experience
< For full cutsheet, align sidebar to this guide
Lumberjack Landing Park Master Plan and
Improvements
Stillwater, Minnesota - HKGi worked with a multi-disciplinary team
to develop a master plan for a new park fronting the St. Croix River on
15-acres immediately north of downtown Stillwater and the Lift Bridge.
The new park is on what was formerly private land and includes an
existing house that will be renovated and converted into a park building.
The park will provide much-needed access to the St. Croix River for non-
motorized watercraft, such as canoes and kayaks. Such access does not
currently exist in the area. The park will also feature fishing piers, internal
trails and connections to the adjacent Brown’s Creek State Trail, and site
restoration and vegetation management plan.
HKGi is currently leading the development of design documents to
implement some of the master plan’s key short-term initiatives. These
improvements include an ADA accessible canoe/kayak launch and
trail connection. Both the planning and design phases have required
significant engagement and coordination with federal, state, and county
agencies to ensure compliance with Wild and Scenic River requirements,
state trail connection standards, and county site requirements.
X-B-01
12 Proposal - Lake Rebecca Project Management Services - City of Hastings
< For full cutsheet, align sidebar to this guide
Carrick’s Landing Improvements
Otsego, Minnesota - HKGi provided the City of Otsego with concept
planning services for the development of a paddle launch on the
Mississippi River at Carrick’s Landing Park. Initial planning included the
creation of a development concept to identify the best location for the
launch and explore potential configurations. HKGi continued its work on
the next implementation phases, including schematic design assistance
with grant writing to help fund the improvement project.
Improvements under development include stairway and an accessible
ramp to provide access to the riverfront; a new shelter; wayfinding
signage; benches; a new connection from the parking lot to the landing;
and a floating dock.
X-B-01
13 Relevant Experience
< For full cutsheet, align sidebar to this guide
People Movement Plan
Hastings, Minnesota - HKGi led a planning process to assist the City
of Hastings in identifying strategies, investments, and implementation
priorities to enhance its multi-modal transportation system. The
plan includes initiatives related to off- and on-street trails, sidewalks,
connections with the county’s greenway system, crossing safety
improvements, and wayfinding.
HKGi analyzed Hastings’ existing pedestrian and bicycle facilities and then
identified community destinations, which included all park and open
space amenities within the city, entertainment districts, commercial and
employment areas, schools, and civic services such as libraries and service
centers. Using the results of those analyses, HKGi’s planners identified
gaps in the system and then created a framework plan to identify
different elements within the system, such as Hubs, Primary routes,
Secondary routes, and key Crossings.
The Implementation section of the Plan provides detailed strategies and
action items categorized into areas such as Education, Enforcement, and
Programming; Institute City-wide Development Policies; Infrastructure
Improvements; Operations and Maintenance; and Funding.
X-B-01
14 Proposal - Lake Rebecca Project Management Services - City of Hastings
< For full cutsheet, align sidebar to this guide
Eckert Blufflands Park Master Plan
St. Croix County, Wisconsin - HKGi led a planning process for a new park
on what was formerly private land on the Wisconsin side of the St. Croix
River. The planning team conducted an inventory of existing conditions
for the 167-acre project area and then conducted initial engagement with
the community. This analysis and input was used to identify potential
issues and opportunities for development of the park and then provided
a foundation for the creation of three park concepts. HKGi worked with
county staff and community stakeholders to explore development
potential in each of the concepts and create a preferred concept to guide
future development of the park.
While each concept included similar program elements such as
campgrounds, trails, scenic overlooks, landscape preservation and
restoration, and fishing access, each concept featured a different
emphasis and level of impact to the site. The final master plan document
identifies and prioritizes implementation initiatives and also includes
strategies to help the county secure funding and phases for park
development and construction.
HIGHLIGHTS
Extensive online engagement
processes using Social Pinpoint and
ESRI StoryMaps.
Several stakeholder meetings with
landowners, local government
representatives, and utilities.
In-depth conceptual planning and
design process for multiple facilities.
X-B-01
15 Relevant Experience
< For full cutsheet, align sidebar to this guide
Big Elk Lake Park Master Plan
Sherburne County, Minnesota - HKGi worked with Sherburne County
to create a master plan for a potential new county park on a 400-acre
privately-owned site. The former owner wanted the land to become a
park to preserve the site’s natural areas and provide public lake access
and a recreational amenity. The County conducted initial archeological
and architectural studies to identify Native American burial grounds
and artifacts and assess the quality of existing structures on site. HKGi
was hired to conduct further site analysis, evaluate natural resources,
facilitate public engagement, and develop a master plan to meet Greater
Minnesota Regional Parks and Trails Commission (GMRPTC) requirements.
Key engagement for this project involved meetings and site tours with
tribal representatives and GMRPTC staff to modify the initial concept
plans, placing greater emphasis on Indigenous history and natural
resource preservation, as the site’s owners had come to desire during
the discovery process. The final master plan prioritizes natural resource
restoration projects; cultural preservation, education, and interpretation;
reducing the number of recreational amenities; and preserving access to
the lake and the site’s other outstanding landscape features.
HIGHLIGHTS
Plan emphasizes cultural heritage and
natural resource conservation and
interpretation
Engagement included an outdoor
winter event held on the lake, giving
stakeholders an opportunity to see
the park property in person
Plan contains creative ideas for
cultural and natural resource-focused
programming
X-B-01
CREATINGPLACESTHAT ENRICHPEOPLE’S LIVES
X-B-01