Loading...
HomeMy WebLinkAbout20230221 - CC Workshop MinutesHastings, Minnesota City Council Workshop February 21, 2023 The City Council of the City of Hastings, Minnesota met in a workshop on Tuesday, February 21, 2023 at 5:30 p.m. in the Volunteer Room at the Hastings City Hall, 101 East 4th Street, Hastings, Minnesota. Members Present: Mayor Fasbender, Councilmembers Folch, Fox, Haus, Lund, Pemble Members Absent: Leifeld Staff Present: City Administrator Dan Wietecha Interim Public Works Director Ryan Stempski Assistant City Administrator Kelly Murtaugh Community Development Director John Hinzman Mayor Fasbender called the workshop to order at 5:03 p.m., welcoming Council members and Public Works Director Ryan Stempski to discuss PFAS. Stempski introduced the topic of PFAS (per- and poly-fluoroalkyl substances). He shared the current measurement standards that the six City wells must adhere to and our current index. He provided graphics that demonstrate how the moving contaminant may interact with the area geology and then impact the City wells. How this all impacts the City’s water is the purpose of further detailed study. 1. Drinking Water Standards – Update on EPA and MDH a. There are 6 elements that are tested for when wells are tested. The most prevalent for health impact are the PFOS and PFOA. When the levels are adjusted, this will affect the index for City wells. The levels of these elements have remained relatively constant during the decade of this type of testing. b. The EPA is expected to release proposed reduced the levels of PFOA and PFOS in March 2023. Public comment will follow the release. c. The MDH (Mn Dept of Health) will also release updated standards later this spring. This could trigger a drinking water advisory for the City and a requirement for mitigation. 2. Limited Phase One Environmental Review a. Done by the MPCA i. Identified potential source locations ii. Identified data gaps, including along the Mississippi River iii. Considering additional modeling efforts to fill current data gaps iv. Conduct additional groundwater investigation to delineate PFAS plume with Pine Street dump v. Regular meetings with MPCA 3. Preliminary Project Scope and Cost Estimate a. Three preliminary sites have been identified for future filtration plants. Need to also run raw water lines from wells to these sites for treatment.