Loading...
HomeMy WebLinkAboutVIII-20 Approve Budget Amendment for Pool Repairs City Council Memorandum To: Mayor Fasbender & City Councilmembers From: Chris Jenkins, Parks & Recreation Director Date: October 17, 2022 Item: Budget Adjustment Council Action Requested: Approve budget adjustment to spend Fund 201 funds to complete needed repairs at the Hastings Family Aquatic Center. Background Information: Part of the construction of the pool shell includes construction joints, where concrete slabs adjoin one another. These joints have tile on both sides and are caulked with a flexible product that needs to be replaced regularly. What we have encountered at HFAC over the past 5- 6 years is significant failure of the joints and tile lines. Despite repeated repairs by pool industry contractors, these failures continue, are hazardous to simmers’ feet, and if left unattended will lead to additional joint failure and a need for more significant repairs. Staff asked two contractors to provide a solution to this issue, as well as complete some plaster repairs, concrete and caulk repairs on the concrete deck surrounding the pool. One contractor provided a solution that will eliminate the tile lines, which eliminates the potential failure of those tiles in the future. This contractor, Global Specialty Contractors, also happens to be the contractor who built the pool 20+ years ago, and is very familiar with all aspects of the pool construction. Global recently completed a similar repair job at Cascade Bay in Eagan, and staff with Eagan have reported positive outcomes from that work. Staff at Global have indicated they will be able to complete much of the work this fall once approval is provided. Financial Impact: Fund 201 has sufficient funds to be allocated to this project, and staff propose use of these funds. Total project cost: $58,622.00 Advisory Commission Discussion: None Council Committee Discussion: None Attachments: Global Specialty Contractors quote VIII-20 To: Contact:City of Hastings Chris Jenkins HFAC RepairsProject Name:Bid Number: Fax:Hastings, MN 50125 Address:Park and Recreation, 920 West 10th Street Phone:(913) 438-4338 Project Location:901 Maple Street, Hastings, MN Bid Date:9/29/2022 UnitItem Description Line #Estimated Quantity 1.00 LSGeneral Conditions 600.00 LFConstruction Joint Repair 1,060.00 LFRepair Perimeter Caulk Joint 4.00 EACHFix Lane Anchors $58,622.00Total Bid Price: Notes: •Prices quoted are good for 30 Days from bid date.•All Taxes are included. •Permits and fees by others. •approx 25SF of plaster repair outside the construction joints included. ACCEPTED: The above prices, specifications and conditions are satisfactory and hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: Global Specialty Contractors, Inc. Authorized Signature: Estimator:Zach Brazier (651) 406-8232 zbrazier@globalspecialty.net Page 1 of 110/4/2022 3:31:28 PM VIII-20