Loading...
HomeMy WebLinkAbout3 - Interim Use Permit - UHL To: Planning Commissioners From: Justin Fortney, City Planner Date: August 8, 2022 Item: Public Hearing: Interim Use Permit - Temporary Parking and Hockey Rink 2800 Ravenna Trail – 2022-47   Planning Commission Action Requested:  The Planning Commission is asked to review  the proposed Interim Use Permit and make a recommendation to the City Council.    Background Information:  The Interim Use Permit allows for temporary improvements  that do not meet all of the city development standards for a period of time in areas  outside the MUSA (Metropolitan Urban Service Area).  This would allow for temporary  operations or allow to begin an operation with minimal upfront investment.     An approved permit is probational for the first six months and then may be reauthorized  for a year by the City Council. After this 18‐month period, the improvements must be  removed or brought up to full development standards following an approved site plan.     The applicant made a similar request in spring of 2020 to construct a confidence course  (AKA obstacle course) at the property. The proposal included a temporary gravel drive  and parking lot, dumpster, and chemical toilets (AKA Porta‐Potty).  They proposed to  construct the necessary pavement and landscaping at the end of the original Interim  Use Permit. The proposal was approved, but the improvements were never made. The  applicant cites unexpected financial hardship. The applicant’s current proposal overlaps  the proposed improvement area of the original proposed area and includes both uses in  the plan for temporary and permanent improvements.     The applicant’s rational for Interim Use Permit approval is as follows:  UHL Response: At this point the project is too large to absorb financially in one year. Our plan is  to absolutely pave the following year in preparation for the additional traffic and potential  hosting of Hockey Day. Paving, curb & gutter, lighting, and landscaping would be completed in  summer of 2023. See Phase 2 site plan for proposed 2023 construction.  Like a lot of businesses, Covid19 was a huge factor for us in being able to bring the paved lot to  fruition during the existing IUP. Those days are behind us and we are having a record year for  revenues, in addition to bringing high end development assets on board via Hille & Assoc., Ryan  Co., & Rani.  We are also pursuing Hockey Day MN 2025 which will be a tremendous event not only for UHL,  Planning Commission Memorandum but for the entire community. Not only from a tourism perspective, but also from a revenue  perspective for the city. Council Member Vaughan can speak at length to the event I believe if  you are not familiar with it. The Minnesota Wild and Bally Sports North will require our lot be  paved with appropriate lighting for that event, so we will have that additional pressure to follow  through on this next summer.  It’s just the right thing to do anyhow with our monument being open now and the progression  of our long range development plans. ‐ 2022 Rink  ‐ 2023 Parking / Lighting  ‐ 2024 Football, Soccer, Baseball Fields  ‐ 2026 Facility     Interim Use Review  The temporary improvements should not negatively affect the area. There are few  neighbors near the site and it was previously used as a sand and gravel mine. The site is  open to appointment only.  Notification  Property owners within 350’ were notified of the IUP. No comments have been  received.   SITE PLAN REVIEW  Comprehensive Plan Classification  The 2040 Comprehensive Plan designates this area as Agricultural.    Zoning Classification  The  subject  property  is  zoned  A  ‐Agriculture.    Which  allows  the  proposed  use  of  recreation.  Adjacent Zoning and Land Use  Direction Existing Use Zoning Comp Plan North Vacant - future wastewater plant Agriculture Institutional East Large lot residential/ vacant Agriculture Agriculture South Large lot residential/ vacant Agriculture Agriculture West Extreme Sandbox/ bus. homes Agriculture Agriculture   Existing Condition  The 14‐acre parcel is currently vacant land and conjoining additional land owned by the  applicant including some in Ravenna Township.      Building Setbacks  There are no buildings currently proposed. The site, rink, and parking are appropriately  setback from the property lines.       Parking   The gravel parking lot would contain about 336 parking spaces.  The applicant’s team has  stated the following project information regarding the project and parking:   UHL Response: We have additional development that we hope to accomplish over time. In an  effort to reduce unnecessary spend, we are trying to construct elements of the development  once. Along with the ice rink, confidence course, memorial wall, and fields, our 5 year plan  anticipates an 80k sf athletic facility. We are constructing this for the future so as to not have to  rebuild any of the parking lot in the future. Our parking count in the current state is higher than  we need, but the count will support the proposed larger operation in the future.    The city zoning code does not have categories for all the proposed uses on site.  Recreation participant/ spectator requires one space per four seats or 8‐feet of bench  length. Presumably, most of these uses will not occur at the same times and seasons.  We will have more details on parking needs when the coming phases are designed. The  proposed gravel lot is sufficient for the interim uses proposed. There is ample area for  any needed parking expansion.     Dakota County and the applicant have discussed a requirement to construct a right turn  lane into the site when it’s paved next year.     Architectural Standards  No buildings are proposed    Landscaping  Landscaping is not required for an Interim Use Permit. Landscaping will be required during  the site plan process.    Lighting  Permanent lighting is proposed for the second phase of the development.     Recommendation  Staff recommends approval of the proposed Interim Use Permit subject to the following  conditions:  1. Conformance with the Planning Commission Staff Report and plans dated August  8, 2022.  2. Approval is subject to an 18‐month duration including a 6‐month probationary  period to start when operations begin.   3. After the expiration of approval, the site must either comply with all  development regulations or cease operations entirely and the site must be  completely reverted to pre April 13, 2020 interim use condition.  4. Hours of operation and noise must conform to the regulations in City Chapter 95:  Health and Safety; Nuisances.  5. Accessibility based on Mn Building (Chapter 29) and Mn accessibility codes.   6. Trash service and temporary restrooms are required during times of operation.  7. A sign permit is required for any signage.  8. The entrance must be gated.   9. Only site uses including the confidence course, ice rink and parking lot of the  master plan have been reviewed and approved for an Interim Use Permit at this  time. Other site amenities shown on the plan have not been reviewed for  compliance or construction and are not allowed under the Interim Use Permit.   10. Portable restrooms are allowable only until one year after city sewer availability  (availability proposed for 2027).   11. Coordination of the driveway location with Dakota County and the Metropolitan  Council’s wastewater treatment plant driveway location.   12. Construct the required driveway improvements required by Dakota County  which may include an eastbound right turn lane with the 2023 drive and parking  pavement.   13. Coordinate drainage plans with Dakota County as they impact drainage to the  County right‐of‐way.  14. Execution of a stormwater access and maintenance agreement between the City  and property owner.    Attachments:   Aerial Photograph   Photographs   Current Master Plan ‐ Full Build Out   Site Plan ‐ Interim Use Permit                                                                                                           Existing Confidence Course                            Current Master Plan ‐ Full Build‐Out                                                    Site Plan ‐ Interim Use Permit