Loading...
HomeMy WebLinkAbout4 - Final Plat - Heritage Ridge 4th Add To: Planning Commissioners From: John Hinzman, Community Development Director Date: June 13, 2022 Item: Heritage Ridge 4th Addition - Final Plat #2022-33 - TC Land Planning Commission Action Requested Recommend action on the request of TC Land for the Final Plat of Heritage Ridge 4th Addition containing 36 traditional single family and villa home lots along with one Outlot. The +/-12.12 acre property is currently owned by WRB LLC and located north of Heritage Ridge 3rd Addition near General Sieben Drive and Northridge Drive. BACKGROUND INFORMATION Preliminary Plat Approval Preliminary Plat approval for the greater 40 acre parcel into 116 lots was reviewed by the Planning Commission on August 24, 2020 and approved by the City Council on October 5, 2020. The Final Plat conforms with the Preliminary Plat. The 4th Addition would complete final plating of all 116 lots. Comprehensive Plan The property is guided Low Residential within the 2040 Comprehensive Plan. The designation includes single family and two family housing with allowable densities of 2.5-6.0 housing units per net acre and lots sizes of at least 6,000 s.f. The proposed development plan is consistent with the Comprehensive Plan. Zoning The parcel is R-2 - Medium Density Residence. The R-2 District allows both single and two family structures. Existing Condition The site is gently rolling, treeless, and used for agriculture. Planning Commission Memorandum Adjacent Zoning and Land Use The following land uses abut the property: Direction Use Comp Plan District Zoning District North Agriculture SEAS Church - Nininger Twp Low Density Residential Nininger Twp East General Sieben Drive Single Family Residential Low Density Residential R-1 - Low Density Residence South Heritage Ridge 3rd Add Single Family Residential Low Density Residential R-2 Medium Density Residence West Nininger Township Agriculture Low Density Residential Nininger Twp FINAL PLAT REVIEW Request Final Plat approval of Heritage Ridge 4th Addition containing 36 home sites comprising of traditional and villa home lots. Difference Between Preliminary Plat and Final Plat Preliminary Plat approval includes the plan for future subdivision of the entire development including a review of lots, streets, grading, stormwater, utilities, public land dedication, and landscaping. Final Plat approval is the formal subdivision of all or a portion of a Preliminary Plat into lots of record for home construction. The Preliminary Plat establishes the plan for development, while the Final Plat formally puts the plan into effect. Lot Layout Proposed lots meet the following minimum requirements of the R-2 Zoning District: Minimum Requirement Proposal Lot Area 7,000 s.f. 7,164 - 16,873 s.f. Front Yard Setback 20’ 20’ Interior Side Yard Setback 7’ 7’ Corner Side Yard Setback 10’ 10’ Rear Yard Setback 20’ 20 - 70’ Outlots Outlots are parcels of land that are restricted from immediate development. Development restrictions may be permanent (such as stormwater basins), or temporary (such as future phases of a development). The outlots included in the final plat are designated as follows: • Stormwater Ponding - Outlot A Street Layout Development includes the connection of Northbrook Drive from Westpointe Drive to General Sieben Drive. Northridge Circle would extend north of Northridge Drive. Pedestrian Access Pedestrian access is adequate. A sidewalk is planned for the north side of Northridge Drive with a trail on the south side of the roadway. Sidewalks would connect to existing facilities along Ridgepointe and Westpointe Drives. Trail connections would be made to Northridge Drive and General Sieben Drive to connect to the Hastings trail system. Aggregate Operations Solberg Aggregate is actively mining areas along the western 1/3rd of the greater Heritage Ridge Subdivision (adjacent to the 1st and 2nd Additions). The mining operations are located within Nininger Township and outside of the jurisdiction of the City of Hastings. Mining activities can produce noise. Blasting of aggregate has historically occurred ranging from once a week to once every three weeks. Future mining operations could be expanded further east brining operations in closer proximity to home sites. Future home owners should be made aware of the existence of the mining operations and the potential for disturbance. Landscape Plan The landscape plan identifies boulevard tree plantings every 50 lineal feet along all new right-of- ways. Additional trees are shown within the read yards. Front yard trees will be required for every unit as part of the building permit. Civil Plan Review - Grading, Drainage, Erosion Control, and Municipal Utilities The Engineering Department is conducting an in depth analysis of stormwater drainage to ensure conformance with requirements. Approval is conditioned on approval by the Public Works Director. Sanitary Sewer and Water Trunk Oversizing Trunk sanitary sewer and water will be extended into and through the site for future development. Oversize charges may be paid by the City. Development Agreement The City and developer shall enter into a Development Agreement to memorialize conditions of approval and to establish applicable escrow amounts to ensure completion of public improvements. Stormwater Maintenance Agreement The developer must execute a stormwater maintenance agreement over all private stormwater utility systems to ensure private maintenance and to allow for emergency public access prior to recording of the final plat. Association Maintenance Agreement A homeowner’s association or similar mechanism will be required to ensure maintenance of private common infrastructure including cul-de-sac islands, and private stormwater infrastructure prior to recording of the final plat. Park Land Dedication On January 21, 2020 the City Council accepted cash in lieu of land to satisfy park dedication within Heritage Ridge consistent with the January 14th recommendation of the Parks and Recreation Commission. Payment of cash in lieu of land in the amount of $79,200 ($2,200 x 36 units) will be due prior to release of the final plat mylars for recording. Interceptor Sewer Fee Payment of sewer interceptor fees in the amount of $17,460 ($485 x 36 units) is required prior to release of the final plat mylars for recording. RECOMMENDATION - FINAL PLAT Approval of the Final Plat of the Heritage Ridge 4th Addition is recommended subject to the following conditions: 1) Conformance with the plans submitted with the Planning Commission Staff Report dated June 13, 2022. 2) Final approval of all Civil Plans including Grading, Drainage and Erosion Control Plan, and Utility Plan by the Public Works Director. 3) All disturbed areas on the property shall be stabilized with rooting vegetative cover to eliminate erosion control problems. 4) Establishment of sureties and payment of escrow prior to commencement of site grading and utilities. 5) No Occupancy of dwelling units shall occur until Developer furnishes the City with a copy of written notice, acknowledged by the initial owners and occupants of the dwelling, demonstrating that the Developer notified initial owners and occupants, and by recording a written notice to any subsequent owners, of the existence of active mining operations including blasting on the adjacent property and the potential for disturbance to foundations and improvements. 6) Execution of a Development Agreement to memorialize conditions of approval and to establish applicable escrow amounts to ensure completion of public improvements. 7) Execution of a stormwater access and maintenance agreement between the City and property owner prior to recording of the final plat. 8) A declaration of covenants, conditions and restrictions or the equivalent document shall be submitted for review and approval by the City before release of the final plat mylars to ensure maintenance of any open space, median plantings, cul-de-sac plantings, common drives, stormwater infrastructure, and common utilities. The declaration shall include, but is not limited to, the following: a. A statement requiring the deeds, leases or documents of conveyance affecting buildings, units, parcels, tracts, townhouses, or apartments be subject to the terms of the declaration. b. A provision for the formation of a property owners association or corporation and that all owners must be members of said association or corporation which may maintain all properties and common areas in good repair and which may assess individual property owners proportionate shares of joint or common costs. The association or corporation must remain in effect and may not be terminated or disbanded. c. Membership in the association shall be mandatory for each owner and any successive buyer. d. Any open space restrictions must be permanent and may not be changed or modified without city approval. e. The association is responsible for liability insurance, local taxes and the maintenance of the open space facilities deeded to it. f. Property owners are responsible for their pro-rata share of the cost of the association by means of an assessment to be levied by the association which meet the requirements for becoming a lien on the property in accordance with Minnesota Statutes. g. The association may adjust the assessment to meet changing needs. 9) Submission of certification of taxes paid in full for the property prior to release of the final plat mylars for recording. 10) Payment of $79,200 ($2,200 x 36 units) to satisfy park dedication requirements prior to release of the final plat mylars for recording. 11) Payment of $17,460 ($485 x 36 units) in sewer interceptor fees prior to release of the final plat mylars for recording. 12) Developer presentation of trunk sewer extension costs to the Public Works Director to determine any City contribution towards upsizing. 13) Individual mailboxes for each home are not permitted. Mailboxes must be grouped into clusters. 14) Developer shall plant "boulevard" trees of at least 1.5 caliper inches according to the submitted tree plan. An escrow is required for any unplanted trees before a certificate of occupancy is issued. 15) One front yard tree of at least 1.5 caliper inches must be planted by the builder or developer on every platted lot. An escrow is required for any unplanted trees before a certificate of occupancy is issued. 16) Blanket drainage and utility easements shall be recorded against all outlots, unless they are further delineated to the satisfaction of the Public Works Director. 17) Any uncompleted site work (including landscaping) must be escrowed for prior to issuance of a certificate of occupancy. 18) Approval is subject to a one year Sunset Clause; the plat must be recorded with Dakota County within one year of City Council approval or approval is null and void. ATTACHMENTS • Site Location Map • Preliminary Plat • Final Plat • Civil Plans • Application LOCATION MAP 8 0 60 66 1321.66 N 01°29'59"W N o r t h e a s t c o r n e r o f t h e n o r t h e a s t 1 / 4 o f S e c . 3 1 , T . 1 1 5 , R . 1 7 D a k o t a C o u n t y A l u m i n u m M o n u m e n t 1 1 1 0 9 8 7 4 1 3 2 1 . 1 1 N 8 9 ° 4 6 ' 5 0 " E 2 9 5 . 1 9 S 8 8 ° 0 2 ' 2 9 " W 197.20 N01°29'59"W 8 0 2 8 1 . 3 3 S 8 8 ° 3 0 ' 0 1 " W R = 5 0 0 . 0 0 Δ = 3 ° 3 0 ' 2 6 " 3 0 . 6 1 6 8 . 2 4 N 1 9 ° 4 0 ' 4 4 " W 3 4 . 0 4 3 4 . 2 0 3 2 2 . 6 1 3 9 . 9 6 5 4 . 0 0 5 4 . 0 0 5 4 . 0 0 7 9 . 3 6 Δ = 2 ° 2 6 ' 4 0 " 1 9 . 9 2 33 33 1 4 2 . 0 7 N 3 ° 5 6 ' 4 0 " W N1°29'59"W 141.93 N1°29'59"W 141.50 N1°29'59"W 141.07 N1°29'59"W 140.64 5 3 . 8 2 5 4 . 0 0 5 4 . 0 0 5 4 . 0 0 7 9 . 3 6 140.00 33.00 24.20 N O R T H R I D G E D R I V E M A T C H L I N E S e e s h e e t 2 o f 2 s h e e t s 10 10 10 10 10 H E R I T A G E R I D G E 4 T H A D D I T I O N S H E E T 1 O F 2 S H E E T S N O R T H 0 4 0 8 0 1 I N C H = 4 0 F E E T S C A L E I N F E E T S e c . 3 1 , T . 1 1 5 , R . 1 7 1 6 0 t h S t . E . V i c i n i t y M a p N o S c a l e N W 1 / 4 S W 1 / 4 S E 1 / 4 N E 1 / 4 N S I T E General Sieben Drive 1 5 0 t h S t . E . Jacob Ave. W . 1 5 t h S t . D e n o t e s 1 / 2 i n c h i r o n p i p e m o n u m e n t f o u n d a n d m a r k e d b y L i c e n s e N o . 2 4 3 3 2 . D e n o t e s 1 / 2 i n c h b y 1 4 i n c h i r o n p i p e m o n u m e n t s e t a n d m a r k e d b y L i c e n s e N o . 2 4 3 3 2 . B e a r i n g s s h o w n a r e b a s e d u p o n t h e n o r t h l i n e o f O u t l o t E , H E R I T A G E R I D G E w h i c h h a s a n a s s u m e d b e a r i n g o f N 8 9 ° 4 6 ' 5 0 " W . A R E S H O W N T H U S : D R A I N A G E A N D U T I L I T Y E A S E M E N T S B e i n g 5 f e e t i n w i d t h a n d a d j o i n i n g l o t l i n e s , u n l e s s o t h e r w i s e s h o w n a n d 1 0 f e e t i n w i d t h a n d a d j o i n i n g r i g h t o f w a y l i n e s a s s h o w n o n t h e p l a t . 1 0 ( N o t t o s c a l e ) 1 0 5 5 114 . 7 4 N 2 9 ° 4 3 ' 4 8 " E 3 2 . 2 3 S 4 1 ° 2 3 ' 3 5 " E 2 7 . 4 3 S 8 6 ° 1 5 ' 5 8 " E FDIP 18425 De t a i l No t t o S c a l e S3 5 ° 0 0 ' 0 0 " W 42 . 0 1 N o t T a n g e n t S3 5 ° 0 0 ' 0 0 " W 46 . 9 0 R = 4 1 7 . 0 0 Δ = 1 ° 2 7 ' 2 2 " 1 0 . 6 0 5 6.16 Δ = 7°4 2'5 9" R = 417.0 0 C B R G = N 4 0°18'51"E 57.52 Δ =5°14'35" R =628.55 C B R G = N 35°08'03"E N O R T H R I D G E D R I V E NORTHRIDGE C I R C L E N O R T H R I D G E D R I V E 4 6 5 4 3 2 1 2 1 3 1 2 3 4 5 6 7 18910 1 1 1 2 1 3 1 4 1 5 1 2 3 4 56 7 8 2 O U T L O T A 1 4 2 . 0 7 N 3 ° 5 6 ' 4 0 " W 6 8 . 2 4 S 1 9 ° 4 0 ' 4 4 " E 3 4 . 0 4 3 4 . 2 0 R = 5 0 0 . 0 0 Δ = 4 9 ° 5 9 ' 3 5 " 4 3 6 . 2 7 Δ = 4 2 ° 1 2 ' 4 4 " 3 9 2 . 6 8 Δ = 0 6°5 1'14" 6 3.7 6 Δ = 9 ° 0 1 ' 3 1 " 7 3 . 5 6 Δ = 9 ° 0 1 ' 3 7 " 7 3 . 5 8 Δ = 9 ° 4 6 ' 3 2 " 7 9 . 6 8 Δ = 1 1 ° 0 2 ' 0 2 " 8 9 . 9 3 331.99 S61°27'05"E 498.08 N01°33'51"W 1 3 2 1 . 1 1 N 8 9 ° 4 6 ' 5 0 " E 18 5 . 0 0 N 3 5 ° 0 0 ' 0 0 " E 1 1 9 . 5 3 S 5 5 ° 0 0 ' 0 0 " E 6 6 . 0 0 S 5 5 ° 0 7 ' 4 6 " E 1 2 0 . 6 1 N 4 1 ° 3 0 ' 0 6 " E 6 0 . 3 8 N 4 8 ° 1 1 ' 0 2 " E 1 2 5 . 9 3 N 4 1 ° 5 8 ' 5 1 " E 1 1 7 . 1 6 S 5 4 ° 2 9 ' 2 7 " W 1 0 2 . 4 9 S 7 8 ° 4 4 ' 2 9 " W S 4 2 ° 5 6 ' 0 9 " E 9 . 6 7 R = 4 1 7.0 0 Δ = 7° 4 2'5 9" 5 6.16 R =6 28.55 Δ = 5°14'35" 5 7.52 30 . 0 0 30 . 0 0 12 5 . 0 0 3 3 . 0 0 3 3 . 0 0 6 6 . 0 8 5 3 . 4 5 3 0 . 2 0 3 0 . 1 8 6 1 . 3 4 5 5 . 8 1 5 1 . 4 9 5 0 . 9 9 S3 5 ° 0 0 ' 0 0 " W 46 . 9 0 R= 4 1 7 . 0 0 Δ=1° 2 7 ' 2 2 " 1 0 . 6 0 M A T C H L I N E S e e s h e e t 2 o f 2 s h e e t s 80.32 107.75 110.91 33.01 92.31 73.31 65.00 106.65 160.82 10.57 160.23111.47 8 3 . 3 1 6 2 . 8 6 5 7 0 . 0 6 2 4 . 4 1 8 5 . 0 0 8 1 . 8 7 8 . 7 9 2 0 0 . 0 7 N 5 5 ° 0 0 ' 0 0 " W 8 6 . 2 9 N 4 8 ° 0 8 ' 4 6 " W N 5 5 ° 0 0 ' 0 0 " W 5 3 . 8 5 5 3 . 8 5 5 3 . 8 5 R=250.00Δ=28 ° 3 3 ' 5 8 " 1 2 4 . 6 4 R=90.00Δ=82°00'07"128.81 130.92 N1°33'51"W R=90.00Δ=95°46'36"150.45 R = 5 6 0 . 0 0 Δ = 3 0 ° 4 7 ' 1 5 " 3 0 0 . 9 1 1 6 4 . 7 2 S 5 5 ° 0 0 ' 0 0 " E Δ=17 ° 4 6 ' 2 3 " 6 8 . 2 4 Δ=10°47'36"41.44Δ=20°31'01"42.97 Δ=27°39'55"57.94 Δ=28°11'26"59.04 Δ=05°37'45"11.79 Δ = 0 4 ° 4 4 ' 3 0 " 2 3 . 1 7 Δ = 1 4 ° 3 0 ' 3 2 " 7 0 . 9 0 Δ=09°18'56"45.53 Δ=82°00'07"85.87 52.21 65.00 13.7167.8363.09 Δ=22°21'07"46.81 Δ=28°09'29"58.97 Δ=27°37'03"57.84 Δ=17°38'58"36.96Δ=95°46'36"100.30Δ=03°23'11"31.32 Δ=01°59'26"20.50Δ=0 6 ° 2 7 ' 5 1 " 6 6 . 5 6 Δ = 0 6 ° 2 7 ' 5 1 " 6 6 . 5 6 Δ = 0 6 ° 2 7 ' 5 1 " 6 6 . 5 6 Δ = 0 6 ° 2 7 ' 5 1 " 6 6 . 5 6 Δ = 0 2 ° 5 6 ' 2 5 " 3 0 . 2 8 Δ = 0 8 ° 0 9 ' 0 2 " 7 5 . 4 0 Δ = 0 8 ° 0 9 ' 0 2 " 7 5 . 4 0 Δ = 0 8 ° 3 5 ' 4 9 " 7 9 . 5 2 Δ=02°30 ' 1 1 " 23.15 5 3 . 8 5 5 3 . 8 5 S3 5 ° 0 0 ' 0 0 " W 12 4 . 4 9 S3 5 ° 0 0 ' 0 0 " W 2 3 7 . 4 8 15 4 . 9 3 82 . 5 6 Δ =12°11'3 8" 9 9.3 9 52 . 5 6 52 . 5 6 14 6 . 2 3 S 2 9 ° 2 0 ' 3 3 " W 5 . 8 0 Δ = 0 0 ° 4 2 ' 4 4 " N3 2 ° 0 3 ' 3 5 " E 12 7 . 4 0 N25 ° 3 5 ' 4 5 " E 136 . 2 2 N19° 0 7 ' 5 4 " E 154.8 4 N12°40' 0 3 " E 145.36 N6°12'12"E131.37N17°00'33"W 137.28N43°36'39"W 216.68N70°12'45"W129.93S88°26'09"W 112.00S88°26'09"W 112.00S83°42'10"W 112.96 N23 ° 5 4 ' 0 0 " E 128. 6 3 N15°4 4 ' 5 8 " E 125.07 N7°35'56"E125.05N15°44'58"E 124.93 S3 5 ° 0 0 ' 0 0 " W 12 5 . 9 6 S88°26'09"W77.18 S78°18'21" E 57.56 7 7 . 0 0 N 5 5 ° 0 0 ' 0 0 " W 1 1 2 . 6 7 S 6 6 ° 3 7 ' 3 7 " E 5 7 . 4 1 5 5 . 2 6 4 4 . 8 7 4 4 . 8 7 N 3 6 ° 5 1 ' 1 6 " E 12 4 . 5 1 N 3 8 ° 1 8 ' 0 3 " E 13 3 . 4 9 12 5 . 0 0 12 4 . 8 5 N17°13'37"E117.51 S30°29'59"W94.59 S57°06'05"W121.47 N 1 2 ° 5 8 ' 1 1 " W 1 4 4 . 5 7 N 2 1 ° 5 9 ' 4 8 " W 1 3 8 . 9 7 N 3 1 ° 4 6 ' 1 9 " W 1 4 7 . 3 7 8 6 . 8 5 7 7 . 8 7 R = 8 1 0 . 0 0 Δ = 0 6 ° 4 5 ' 0 1 " 9 5 . 4 3 Δ = 0 3 ° 4 0 ' 4 8 " 5 3 . 9 5 Δ = 0 4 ° 3 8 ' 5 0 " 6 3 . 2 7 Δ = 0 3 ° 1 8 ' 0 3 " 4 8 . 3 9 Δ = 0 1 ° 5 1 ' 1 6 " 2 5 . 2 4 1 4 5 . 4 9 N 4 2 ° 5 6 ' 0 9 " W 9 2 . 4 3 6 2 . 7 3 1 0 1 0 1 0 1 0 1 0 1 0 1 0 2 3 . 7 6 3 0 3 0 30 30 D r a i n a g e a n d Ut i l i t y E a s e m e n t 1 0 1 0 1 0 1 0 1 0 10 61.18 N2°14'35"E 50.83 N28°48'12"E 109.13 N66°58'14"E 99.67 N86°23'27"E 7 8 . 9 8 S 8 4 ° 0 9 ' 2 9 " E 8 0 . 1 1 S 8 0 ° 2 8 ' 3 7 " E 8 2 . 5 1 S 7 8 ° 3 7 ' 2 1 " E 10 Drainage and Utility E a s e m e n t 101010 6 0 60 6 6 6 6 51.12 S22°47'35"E 51.73 S2°46'04"EDrainage and Utility Easement22.78 28.51 51.45 100.20 31.8724.77 33.81 34.37 30 30 30 30303030303030 30 30 1 0 . 0 0 N 6 8 ° 4 8 ' 5 2 " W 1 0 . 0 0 N 3 3 ° 5 5 ' 2 9 " W 3 4 . 0 4 2 3 . 4 5 24 . 2 4 10 10 10 10 10 10 10 10 10 10 10 1010 10 10 2 3 . 6 9 Drainage a n d Utility Easem e n t D r a i n a g e a n d U t i l i t y E a s e m e n t D r a i n a g e a n d U t i l i t y E a s e m e n t o v e r a l l o f O u t l o t A H E R I T A G E R I D G E 4 T H A D D I T I O N S H E E T 2 O F 2 S H E E T S N O R T H 0 4 0 8 0 1 I N C H = 4 0 F E E T S C A L E I N F E E T D e n o t e s 1 / 2 i n c h i r o n p i p e m o n u m e n t f o u n d a n d m a r k e d b y L i c e n s e N o . 2 4 3 3 2 . D e n o t e s 1 / 2 i n c h b y 1 4 i n c h i r o n p i p e m o n u m e n t s e t a n d m a r k e d b y l i c e n s e n o . 2 4 3 3 2 . B e a r i n g s s h o w n a r e b a s e d u p o n t h e n o r t h l i n e o f O u t l o t E , H E R I T A G E R I D G E w h i c h h a s a n a s s u m e d b e a r i n g o f N 8 9 ° 4 6 ' 5 0 " W . A R E S H O W N T H U S : D R A I N A G E A N D U T I L I T Y E A S E M E N T S B e i n g 5 f e e t i n w i d t h a n d a d j o i n i n g l o t l i n e s , u n l e s s o t h e r w i s e s h o w n a n d 1 0 f e e t i n w i d t h a n d a d j o i n i n g r i g h t o f w a y l i n e s a s s h o w n o n t h e p l a t . 1 0 ( N o t t o s c a l e ) 1 0 5 5 H E R I T A G E R I D G E NORTHNO SCALE AREA LOCATION MAPABBREVIATIONS M O D U L A R R E T A I N I N G W A L L F I E L D S T O N E R E T A I N I N G W A L L N E W C A T V U N D E R G R O U N D C A B L E / T V EXISTING D E S C R I P T I O N D E S C R I P T I O N S T O R M S E W E R W A T E R M A I N F O R C E M A I N S A N I T A R Y S E W E R - W A S T E R O O F D R A I N S Y S T E M G A S L I N E - U N D E R G R O U N D F I R E L I N E ( I F S E P A R A T E ) F I R E D E P T . C O N N E C T I O N S O I L S U B D R A I N T E L E P H O N E - U N D E R G R O U N D E L E C T R I C - U N D E R G R O U N D L A W N S P R I N K L E R S L E E V E > > > > R I P R A P > > F M S T S R D G A T E V A L V E W T R S A N B L D G . F I R E G A S H Y D T E L E E L E C X " S S D L S S C . O . M A J O R C O N T O U R B U I L D I N G S P O T E L E V A T I O N 1 2 0 C O N C R E T E S L O P E D I R E C T I O N C O N C R E T E C U R B G U A R D R A I L F E N C I N G C O N C R E T E R E T A I N I N G W A L L H E I G H T , T Y P E P O W E R P O L E L I G H T S T A N D A R D E X I T L O C A T I O N U N D E R G R O U N D S T R U C T U R E E D G E O F P A V E M E N T B O L L A R D C A N O P Y / O V E R H A N G B I T . E D G E F E S C A T C H B A S I N M A N H O L E S Y M B O L S L A N D S C A P I N G G R A V E L F L A G P O L E >>> P O W E R P O L E G U A R D P O S T G A S M E T E R T R E E S T R A F F I C S I G N W A T E R M A I N S A N I T A R Y S E W E R L I N E S T O R M S E W E R L I N E O V E R H E A D E L E C T R I C M A J O R C O N T O U R S P O T E L E V A T I O N C O N C R E T E B U I L D I N G C A N O P Y / O V E R H A N G 120GM12"STS8"SANLT F E N C I N G C O N C R E T E C U R B R E T A I N I N G W A L L OE M A N H O L E W A T E R V A L V E F I R E H Y D R A N T F L A R E D E N D S E C T I O N C A T C H B A S I N 6"WTRXXHEIGHT, TYPE1 N O T E N U M B E R G U Y W I R E I R O N M O N U M E N T F O U N D W A T E R S H U T - O F F V A L V E ll M E A S U R E D D I S T A N C E D I S T A N C E P E R R E C O R D E D P L A T U N D E R G R O U N D T E L E P H O N E UT U N D E R G R O U N D E L E C T R I C UE G A S L I N E G P A V I N G B L O C K P A V I N G B L O C K S E T 1 / 2 " X 1 4 " I R O N P I P E T R A N S F O R M E R T R E E L I N E MB M A I L B O X S U R V E Y D I S K ( B E N C H M A R K ) WSO B I T U M I N O U S S O I L B O R I N G B-X 1 2 3 . 4 5 % 1 . 0 0 234.5 L I G H T P O L E M I N O R C O N T O U R 1 2 3 M I N O R C O N T O U R 123 S I L T F E N C E S Y M B O L D E S C R I P T I O N R E V I S E D A R E A ( T H I S I S S U E ) R E V I S I O N - A D D E N D U M , B U L L E T I N , E T C . N O T E R E F E R E N C E L A R G E S H E E T D E T A I L C O O R D I N A T E P O I N T P A R K I N G S T A L L C O U N T D E S C R I P T I O N S Y M B O L E R O S I O N C O N T R O L S Y M B O L S D R A W I N G S Y M B O L S n n n L E G A L D E S C R I P T I O N B E N C H M A R K I N L E T P R O T E C T I O N C 2 1 C 7 . 3 1 1 2 2 O u t l o t E , H E R I T A G E R I D G E , a c c o r d i n g t o t h e r e c o r d e d p l a t t h e r e o f , D a k o t a C o u n t y , M i n n e s o t a . A N D O u t l o t B , H E R I T A G E R I D G E 3 R D A D D I T I O N , a c c o r d i n g t o t h e r e c o r d e d p l a t t h e r e o f , D a k o t a C o u n t y , M i n n e s o t a . 3 T C L A N D I N V E S T M E N T S , L L C 1 3 9 2 5 F e n w a y B l v d . N . H u g o , M N 5 5 0 3 8 C O N T A C T : M a r k G u e n t h e r D E S C R I P T I O N S H E E T N O . C I V I L & L A N D S C A P E T I T L E S H E E T E X I S T I N G C O N D I T I O N S & D E M O L I T I O N G R A D I N G , D R A I N A G E & E R O S I O N C O N T R O L S O U T H P A D H O L D D O W N D E T A I L S M N S W P P P N O T E S S A N I T A R Y S E W E R & W A T E R M A I N S A N I T A R Y S E W E R & W A T E R M A I N S A N I T A R Y S E W E R & W A T E R M A I N S T O R M S E W E R S T O R M S E W E R S T R E E T P R O F I L E S S T R E E T P R O F I L E S P E D R A M P D E T A I L S C I V I L C O N S T R U C T I O N D E T A I L S C I V I L C O N S T R U C T I O N D E T A I L S C I V I L C O N S T R U C T I O N D E T A I L S C I V I L C O N S T R U C T I O N D E T A I L S C I V I L C O N S T R U C T I O N D E T A I L S C I V I L / L A N D S C A P E S H E E T I N D E X & R E V I S I O N M A T R I X O W N E R C 0 . 1 C 1 . 1 C 3 . 1 C 3 . 2 C 3 . 3 C 4 . 1 C 4 . 2 C 4 . 3 C 5 . 1 C 5 . 2 C 6 . 1 C 6 . 2 C 6 . 3 C 7 . 1 C 7 . 2 C 7 . 3 C 7 . 4 C 7 . 5 L A N D F O R M 1 0 5 S O U T H F I F T H A V E N U E , S U I T E 5 1 3 M I N N E A P O L I S , M N 5 5 4 0 1 T E L 6 1 2 - 2 5 2 - 9 0 7 0 C O N T A C T : R a n d a l l H e d l u n d P R O J E C T C O N T A C T S C I V I L E N G I N E E R L A N D F O R M 1 0 5 S O U T H F I F T H A V E N U E , S U I T E 5 1 3 M I N N E A P O L I S , M N 5 5 4 0 1 T E L 6 1 2 - 2 5 2 - 9 0 7 0 C O N T A C T : L a r r y H u h n S U R V E Y O R L A N D F O R M 1 0 5 S O U T H F I F T H A V E N U E , S U I T E 5 1 3 M I N N E A P O L I S , M N 5 5 4 0 1 T E L 6 1 2 - 2 5 2 - 9 0 7 0 C O N T A C T : J o s h P o p e h n L A N D S C A P E A R C H I T E C T X X X X X 04.XX.22 S H E E T S I S S U E D B Y D A T E C O M P O S T / B I O L O G ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) DAngle&And@At100 YR.100 Year Flood ElevationA.B.Anchor BoltA.D.Area DrainA/CAir Conditioning UnitADD.AddendumADDL.AdditionalADJ.Adjacent / AdjustAHUAir Handling UnitALT.AlternateALUM.AluminumANOD.AnodizedAPPROX.ApproximateARCHArchitect / ArchitecturalAUTO.AutomaticAVG.AverageB.C.Back of CurbB/WBottom of WallBFEBasement Floor ElevationBITBituminous (Asphaltic)BLDGBuildingBMBenchmarkBSMT.BasementC.F.Cubic FeetC.F.S.Cubic Feet Per SecondC.G.Corner GuardC.J.Control JointC.L.CenterlineC.M.U.Concrete Masonry UnitC.O.CleanoutC.O.E.U.S. Army Corps Of EngineersC.Y.Cubic YardsCBCatch BasinCBMHCatch Basin ManholeCEM.CementCIPCast Iron PipeCMPCorrugated Metal PipeCONC.Concrete (Portland)CONN.ConnectionCONST.ConstructionCONT.ContinuousCONTR.ContractorCOP.CopperCU.CubicD.S.Down SpoutDEG.DegreeDEMO.Demolition / DemolishDEPT.DepartmentDET.DetailDIA.DiameterDIAG.DiagonalDIM.DimensionDIPDuctile Iron PipeDNDownDWG.DrawingE.EastE.J.Expansion JointE.O.Emergency OverflowE.O.S.Emergency Overflow SwaleE.W.Each WayEA.Each EL.ElevationELEC.ElectricalELEV.ElevationEMER.EmergencyENGR.EngineerENTR.EntranceEQ.EqualEQUIP.EquipmentEQUIV.EquivalentEXIST.ExistingEXP.ExpansionF & IFurnish and InstallF.B.O.Furnished by OthersF.C.Face of CurbF.D.Floor DrainF.D.C.Fire Department ConnectionF.V.Field VerifyFBFull BasementFBWOFull Basement Walk OutFBLOFull Basement Look OutFDN.FoundationFESFlared End SectionFFEFinished Floor ElevationFLR.FloorFT. OR (')FootFUT.FutureG.B.Grade BreakG.C.General ContractorGAL.GallonGALV.GalvanizedGFEGarage Floor ElevationGL.GlassGR.GradeH.HeightH.P.High PointHDPEPHigh Density Polyethylene PipeHGT.HeightHORIZ.HorizontalHVACHeating, Ventilation, Air ConditioningHYDHydrantI.D.Inside Dimension OR IdentificationI.E. or IEInvert ElevationIN. OR (")InchesINFO.InformationINL.Inlet ElevationINSUL.InsulationINV.Invert ElevationJT.JointL.F.Linear FeetL.P.Low Point / Liquid Petroleum LB.PoundLGULocal Government UnitLB.PoundLB.LongitudinalLT.Light / LightingMAINT.MaintenanceMAS.MasonryMATL.MaterialMAX.MaximumMECHMechanicalMED.MediumMFR.ManufacturerMHManholeMIN.Minimum / MinuteMISC.MiscellaneousMNDOTMinnesota Department Of TransportationMOD.Module / ModularMUL.MullionN.NorthN.I.C.Not In ContractNO. OR #NumberNOMNominalNTSNot to ScaleNWENormal Water ElevationNWLNormal Water LevelO.F.On CenterO.G.Outside DimensionO.H.Overhead ElectricOH.OverheadOHWLOrdinary High Water LevelOPNG.OpeningORIG.OriginalP.C.Point of CurvatureP.I.Point of IntersectionPIVPost Indicator ValveP.L. OR P/LProperty LineP.O.B.Point of BeginningP.S.F.Pounds Per Square FootP.S.I.Pounds Per Square InchP.T.Point of TangencyP.V.C.Point of Vertical CurvatureP.V.I.Point of Vertical IntersectionP.V.T.Point of Vertical TangencyPEPolyethylenePED.Pedestal / PedestrianPERF.PerforatedPREP.PreparationPROJ.ProjectPROP.ProposedPVCPoly-Vinyl-Chloride (Piping)PVMT.PavementQTR.QuarterQTY.QuantityRRadiusRAD.RadiusRERim Elevation (Casting)R.D.Roof DrainR.E.Remove ExistingR.O.Rough OpeningR.P.Radius PointRCReinforced Concrete PipeR.S.Rough SlabRSDRoof Storm DrainRE.RegardingREINF.ReinforcedREQ'DRequiredREV.Revision / RevisedRGURegulatory Government UnitROW OR R/WRight of WayS.SouthS.F.Square FeetSAN.Sanitary SewerSECT.SectionSESplit Entry /Side ExitSEWOSplit Entry Walk Out /Side Exit Walk OutSHT.SheetSIM.SimilarSLNT.SealantSPEC.SpecificationSQ.SquareSSDSubsurface drainSTMHStorm Sewer ManholeSTD.StandardSTRUCT.StructuralSYM.SymmetricalTThicknessT/RTop of RimT/WTop of WallTEMP.TemporaryTHK.Thick / ThicknessT.J.Tooled JointTNHTop Nut HydrantTYP.TypicalU.N.O.Unless Noted OtherwiseV.B.Vapor BarrierV.C.Vertical CurveV.I.F.Verify In FieldVER.VerifyVER.VerticalVEST.VestibuleWWidthW.PT.Working PointW.W.F.Welded Wire FabricW/WithW/OWithoutWOWalk OutVER.WetlandWPWaterproofWETL.WeightYD.YardYR.Year U N D E R G R O U N D F I B E R O P T I C FO E R O S I O N C O N T R O L B L A N K E T HASTINGS, MINNESOTAMISSISSIPPIRIVERVERMILLIONRIVER160THST.E.150THST.15TH 145THST.W. 8TH ST.46 55JACOBSITE AVE.GENERAL SIEBEN DR.PLEASANT DR.PINE ST.VERMILLION ST.61E. 18TH ST.E.E.W.ST.47 291 SMEAD BLVD.E. 10TH ST.54 G S I D S t a t i o n # 1 9 1 0 T L a t . : 4 4 4 4 1 7 . 4 0 L o n . : 9 2 5 3 5 1 . 3 6 1 1 5 S t a m p i n g : 1 9 1 0 T 2 0 1 5 M o n u m e n t T y p e : A l u m i n u m a l l o y r o d ( n o s l e e v e ) ( d e p t h 1 9 f t ) D i s k T y p e : M e t a l r o d ( w i t h r e m o v a b l e i d d i s k ) D e s c r i p t i o n : ( 2 0 1 5 ) 2 . 0 m i l e s w e s t o f H a s t i n g s , 2 . 3 m i l e s w e s t a l o n g T r u n k H i g h w a y 5 5 f r o m t h e j u n c t i o n o f T r u n k H i g h w a y 5 5 a n d T r u n k H i g h w a y 6 1 i n H a s t i n g s , a t T r u n k H i g h w a y 5 5 m i l e p o i n t 2 1 8 . 1 5 , 3 5 . 9 f e e t s o u t h o f T r u n k H i g h w a y 5 5 f o g l i n e , 0 . 4 m i l e w e s t o f G e n e r a l S i e b e n R o a d , 1 3 5 . 0 f e e t w e s t o f H a s t i n g s p o p u l a t i o n s i g n , 1 . 5 f e e t n o r t h o f a w i t n e s s p o s t . L e v e l i n g - D e r i v e d O r t h o m e t r i c H e i g h t s ( F e e t ) N A V D 8 8 - 9 1 8 . 3 3 8 F O U R T H A D D I T I O N H A S T I N G S , M I N N E S O T A X I h e r e b y c e r t i f y t h a t t h i s p l a n m e e t s a l l C i t y o f H a s t i n g s a n d V e r m i l l i o n R i v e r W a t e r s h e d R u l e s a n d R e g u l a t i o n s f o r S t o r m w a t e r v o l u m e c o n t r o l , s t o r m w a t e r r a t e c o n t r o l , a n d w a t e r q u a l i t y t r e a t m e n t r e q u i r e m e n t s . C E R T I F I C A T I O N R a n d a l l C . H e d l u n d L i c e n s e N o : D a t e : G E N E R A L N O T E S N o c o n s t r u c t i o n m a y b e g i n u n t i l a p r e c o n s t r u c t i o n m e e t i n g i s h e l d w i t h t h e C i t y . N o c o n s t r u c t i o n m a y b e g i n o n s i t e u n t i l t h e e r o s i o n & s e d i m e n t c o n t r o l h a s b e e n i n s t a l l e d a n d a p p r o v e d b y t h e C i t y . N o c h a n g e s s h a l l b e m a d e t o t h e a p p r o v e d p l a n s w i t h o u t w r i t t e n c o n s e n t o f t h e C i t y . O n l y C i t y e m p l o y e e s a r e p e r m i t t e d t o o p e r a t e v a l v e s a n d h y d r a n t s . I r r i g a t i o n s y s t e m s r e q u i r e s e p e r a t e l y m e t e r e d s u p p l y l i n e c o n n e c t e d t o t h e p u b l i c m a i n l i n e a n d p e r m i t t i n g t h r o u g h t h e C i t y B u i l d i n g D e p a r t m e n t . I f a n y c o n f l i c t s a r i s e d u r i n g c o n s t r u c t i o n , t h e C i t y o f H a s t i n g s s p e c i f i c a t i o n s p r e v a i l , w h i c h c a n b e r e f e r e n c e d o n t h e C i t y o f H a s t i n g s w e b s i t e , f o l l o w e d b y M N M U T C D , M N D O T S p e c i f i c a t i o n s , a n d C E A M S p e c i f i c a t i o n s . 1 . 2 . 3 . 4 . 5 . 6 . C I T Y O F H A S T I N G S 1 0 1 4 T H . S T R E E T E A S T H A S T I N G S , M N 5 5 0 3 3 T E L 6 5 1 - 4 8 0 - 2 3 6 8 C O N T A C T : R y a n S t e m p s k i , P . E . , C i t y E n g i n e e r P U B L I C W O R K S 1 9 5 7 6 0 4 / 2 1 / 2 2 X X X X X X C O N S T R U C T I O N D O C U M E N T S R C H 2 1 A P R I L 2 0 2 2 P R O J E C T N O . F I L E N A M E LANDFORMc I F T H E S I G N A T U R E , S E A L O R F O U R L I N E S D I R E C T L Y A B O V E A R E N O T V I S I B L E , T H I S S H E E T H A S B E E N R E P R O D U C E D B E Y O N D I N T E N D E D R E A D A B I L I T Y A N D I S N O L O N G E R A V A L I D D O C U M E N T . P L E A S E C O N T A C T T H E E N G I N E E R T O R E Q U E S T A D D I T I O N A L D O C U M E N T S . P R O J E C T C E R T I F I C A T I O N 1 0 5 S o u t h F i f t h A v e n u e S u i t e 5 1 3 M i n n e a p o l i s , M N 5 5 4 0 1 T e l : 6 1 2 - 2 5 2 - 9 0 7 0 F a x : 6 1 2 - 2 5 2 - 9 0 7 7 W e b : l a n d f o r m . n e t L a n d f o r m ® a n d S i t e t o F i n i s h ® a r e r e g i s t e r e d s e r v i c e m a r k s o f L a n d f o r m P r o f e s s i o n a l S e r v i c e s , L L C . D A T E I S S U E / R E V I S I O N R E V I E W C O N T A C T E N G I N E E R F O R A N Y P R I O R H I S T O R Y I S S U E / R E V I S I O N H I S T O R Y D E V E L O P E R M U N I C I P A L I T Y H E R I T A G E R I D G E 4 T H A D D I T I O N H A S T I N G S , M I N N E S O T A C O N S T R U C T I O N D O C U M E N T S A p r i l 2 1 , 2 0 2 2 Z Z Z 1 9 4 5 0 . F L C 2022 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N T C L A N D I N V E S T M E N T S , L L C 1 3 9 2 5 F e n w a y B l v d . N o . H u g o M N 5 5 0 3 8 I h e r e b y c e r t i f y t h a t t h i s p l a n w a s p r e p a r e d b y m e , o r u n d e r m y d i r e c t s u p e r v i s i o n , a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e s t a t e o f M I N N E S O T A . S i g n a t u r e s h o w n i s a d i g i t a l r e p r o d u c t i o n o f o r i g i n a l . W e t s i g n e d c o p y o f t h i s p l a n o n f i l e a t L a n d f o r m P r o f e s s i o n a l S e r v i c e s , L L C o f f i c e a n d i s a v a i l a b l e u p o n r e q u e s t . R a n d a l l C . H e d l u n d L i c e n s e N o : 1 9 5 7 6 D a t e : 4 / 2 1 / 2 0 2 2 C 0 0 1 Z Z Z 4 5 0 - P H 0 4 . d w g C I V I L & L A N D S C A P E T I T L E S H E E T C 0 . 1 X X X X X X X X 10 S A N > S A N > SAN>SAN>SAN>SAN>SAN SAN> S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N > S A N SAN>STS>> S T S > > S T S > > S T S > > S T S > > S T S > > S T S > > STS >>STS >> S T S >> S T S >> S T S >> S T S >> S T S > > S T S > > STS>> STS >>STS >>STS >> WS S W S W S W S W SW S W S W S W S W S W S W S W SW S W S W S W S W SW SW S W S W S W S W S W S W S W S W S W S W S W S W S W S W S W S W S W S W W S S W S W S W S W W S S T S > > S T S > > S T S > > S T S > > S W SW S W SAN>SAN> S A N > S A N > S A N > S A N > S T S >> STS>>STS>>STS>> S T S > > S T S > > FDIP 18425 C B R E = 8 8 8 . 8 I E = 8 8 5 . 2 C B R E = 8 8 9 . 0 I E = 8 8 4 . 8 S T M H R E = 8 8 8 . 0 I E = 8 8 2 . 5 ( E ) I E = 8 8 3 . 4 ( S ) I E = 8 8 2 . 6 ( W ) C B B H T O P C L R E = 8 8 8 . 8 I E = 8 8 4 . 4 C B R E = 8 8 2 . 8 I E = 8 7 7 . 8 C B R E = 8 8 2 . 8 I E = 8 7 9 . 4 I N V ? 4 8 R C P I E = 8 7 5 . 9 F E S 4 8 R C P I E = 8 7 6 . 4 S T M H R E = 8 8 3 . 4 C B R E = 8 8 3 . 6 I E = 8 7 9 . 2 C B R E = 8 8 7 . 1 I E = 8 8 3 . 4 C B R E = 8 8 6 . 9 I E = 8 8 2 . 0 S S M H R E = 8 8 9 . 0 I E = 8 7 1 . 8 C B R E = 8 9 0 . 1 I E = 8 8 6 . 9 C B R E = 8 9 0 . 0 I E = 8 8 4 . 3 S B 1 0 3 S B 1 0 2 S B 1 0 4 S B 1 0 6 S B 1 0 5 SB 100SB 101SB 111 S B 1 0 7 T P 3 & 3 A T P 4 T P 2 & 2 A T P 6 T P 5 T P 1 T P 1 0 T P 9 T P 8 T P 7 T P 1 1 T P 1 2 T P 1 3 T P 2 0 SANDSTOCKPI L E B L A C K D I R T S T O C K P I L E R O C K S T O C K P I L E N01°33'51"W 498.08N61°27'05"W 331.99Δ=7°42'59"R=417.00L=56.16 Δ=5°14'35"R=628.55L=57.52 S35°00'00"W 125.00 N 5 5 ° 0 0 ' 0 0 " W 1 1 9 . 5 3 N 5 5 ° 0 7 ' 4 6 " W 6 6 . 0 0 N 4 8 ° 1 1 ' 0 2 " E 6 0 . 3 8 S 5 4 ° 2 9 ' 2 7 " W 1 1 7 . 1 6 S 4 1 ° 3 0 ' 0 6 " W 1 2 0 . 6 1 S 4 1 ° 5 8 ' 5 1 " W 1 2 5 . 9 3 S 8 8 ° 0 2 ' 2 9 " W 2 9 5 . 1 9 1 0 2 . 4 9 S 7 8 ° 4 4 ' 2 9 " W N 8 9 ° 4 6 ' 5 0 " E 1 3 2 1 . 1 1 S01°29'59"E 197.20 S 4 2 ° 5 6 ' 0 9 " E 9 . 6 7 101010 10 1 0 1 0 1 0 1 0 1 0 1 0 X X X X X X X X X X X X X X X X X X X 1 0 1 0 XXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X X X X C 7 . 5 4 B I T U M I N O U S S A W & S E A L S t . E l i z a b e t h A n n S e t o n C a t h o l i c C h u r c h - F a r m l a n d - - Farmland - 9 9 9 L E G A L D E S C R I P T I O N N O R T H 0 6 0 1 2 0 B a c k g r o u n d i n f o r m a t i o n s h o w n i s f r o m s u r v e y b y L a n d f o r m , M i n n e a p o l i s , M N , i n D e c e m b e r o f 2 0 1 9 a n d J a n u a r y o f 2 0 2 0 , e x p r e s s l y f o r t h i s p r o j e c t ; C i t y o f H a s t i n g s , M N r e c o r d d r a w i n g s ; a n d u t i l i t y s e r v i c e p r o v i d e r s . L a n d f o r m o f f e r s n o w a r r a n t y , e x p r e s s e d o r w r i t t e n , f o r i n f o r m a t i o n p r o v i d e d b y o t h e r s . E x i s t i n g p r o j e c t c o n d i t i o n s s h a l l b e v e r i f i e d p r i o r t o b e g i n n i n g c o n s t r u c t i o n . E r r o r s , i n c o n s i s t e n c i e s , o r o m i s s i o n s d i s c o v e r e d s h a l l b e r e p o r t e d t o t h e E n g i n e e r I M M E D I A T E L Y . G e o t e c h n i c a l b o r i n g l o c a t i o n s a r e a p p r o x i m a t e a n d a r e b a s e d o n i n f o r m a t i o n p r o v i d e d i n t h e G e o t e c h n i c a l R e p o r t p r e p a r e d b y H a u g o G e o T e c h n i c a l S e r v i c e s , L L C , M i n n e a p o l i s , M N , o n O c t o b e r 2 , 2 0 2 0 . 1 . 2 . E X I S T I N G C O N D I T I O N S O b t a i n p e r m i t s f o r d e m o l i t i o n , c l e a r i n g , a n d d i s p o s a l p r i o r t o b e g i n n i n g . C o n t a c t u t i l i t y s e r v i c e p r o v i d e r s f o r f i e l d l o c a t i o n o f s e r v i c e s 7 2 h o u r s p r i o r t o b e g i n n i n g d e m o l i t i o n a n d c l e a r i n g . S e e S h e e t C 3 . 1 f o r e r o s i o n p r e v e n t i o n a n d s e d i m e n t c o n t r o l m e a s u r e s t h a t m u s t b e i n p l a c e p r i o r t o d i s t u r b a n c e s t o s i t e . R e s e r v e d D i m e n s i o n s s h o w n f o r r e m o v a l a r e a p p r o x i m a t e . C o o r d i n a t e w i t h n e w c o n s t r u c t i o n t o e n s u r e a p p r o p r i a t e r e m o v a l o f e x i s t i n g f a c i l i t i e s . R e f e r t o d e t a i l s f o r p a v e m e n t s a w c u t . R e m o v e c o n c r e t e w a l k s a n d c u r b i n g t o t h e n e a r e s t e x i s t i n g j o i n t b e y o n d c o n s t r u c t i o n l i m i t s . C o m p l e t e d e m o l i t i o n w i t h m i n i m a l d i s r u p t i o n o f t r a f f i c . C o o r d i n a t e l a n e c l o s u r e s w i t h t h e r e g u l a t o r y a u t h o r i t y a n d p r o v i d e a d v a n c e n o t i f i c a t i o n t o a f f e c t e d e m e r g e n c y r e s p o n s e p r o v i d e r s . P r o v i d e b a r r i c a d e s , l i g h t s , s i g n s , t r a f f i c c o n t r o l , a n d o t h e r m e a s u r e s n e c e s s a r y f o r p r o t e c t i o n a n d s a f e t y o f t h e p u b l i c a n d m a i n t a i n t h r o u g h o u t c o n s t r u c t i o n . P r o t e c t s t r u c t u r e s , u t i l i t i e s , t r e e s , p l a n t m a t e r i a l , s o d , a n d a d j a c e n t p r o p e r t y f r o m d a m a g e d u r i n g c o n s t r u c t i o n u n l e s s n o t e d f o r r e m o v a l . D a m a g e s h a l l b e r e p a i r e d t o e q u a l o r b e t t e r c o n d i t i o n a t n o a d d i t i o n a l c o s t . R e s e r v e d . R e s e r v e d . R e m o v e e x i s t i n g s i t e f e a t u r e s i n c l u d i n g , b u t n o t l i m i t e d t o , u n d e r g r o u n d u t i l i t i e s , p a v i n g , c u r b i n g , w a l k w a y s , f e n c i n g , w i t h i n t h e c o n s t r u c t i o n l i m i t s u n l e s s n o t e d o t h e r w i s e . C o o r d i n a t e r e m o v a l , r e l o c a t i o n , t e r m i n a t i o n , a n d r e - u s e o f e x i s t i n g p r i v a t e u t i l i t y s e r v i c e s a n d a p p u r t e n a n c e s w i t h t h e u t i l i t y c o m p a n i e s . R e s t o r e e l e c t r i c h a n d h o l e s , p u l l b o x e s , p o w e r p o l e s , g u y l i n e s , a n d s t r u c t u r e s d i s t u r b e d b y c o n s t r u c t i o n i n a c c o r d a n c e w i t h u t i l i t y o w n e r r e q u i r e m e n t s . R e s e r v e d . H a u l d e m o l i t i o n d e b r i s o f f - s i t e t o a f a c i l i t y a p p r o v e d b y r e g u l a t o r y a u t h o r i t i e s f o r t h e h a n d l i n g o f d e m o l i t i o n d e b r i s , u n l e s s n o t e d o t h e r w i s e . 2 . 3 . 4 . 5 . 6 . 7 . 8 . 9 . 1 0 . 1 1 . 1 2 . 1 3 . 1 4 . 1 5 . 1 6 . G E N E R A L N O T E S L E G E N D D E M O L I T I O N A N D C L E A R I N G N O T E S F o r c o n s t r u c t i o n s t a k i n g a n d s u r v e y i n g s e r v i c e s c o n t a c t L a n d f o r m a t 6 1 2 . 2 5 2 . 9 0 7 0 . 1 . : C u r b / S i d e w a l k R e m o v a l : S t r u c t u r e a n d / o r P a v e m e n t R e m o v a l : S o i l B o r i n g B - X : U t i l i t y L i n e R e m o v a l X X X X X X X X X X X X X X X X X X X 1 0 C O N S T R U C T I O N D O C U M E N T S R C H 2 1 A P R I L 2 0 2 2 P R O J E C T N O . F I L E N A M E LANDFORMc I F T H E S I G N A T U R E , S E A L O R F O U R L I N E S D I R E C T L Y A B O V E A R E N O T V I S I B L E , T H I S S H E E T H A S B E E N R E P R O D U C E D B E Y O N D I N T E N D E D R E A D A B I L I T Y A N D I S N O L O N G E R A V A L I D D O C U M E N T . P L E A S E C O N T A C T T H E E N G I N E E R T O R E Q U E S T A D D I T I O N A L D O C U M E N T S . P R O J E C T C E R T I F I C A T I O N 1 0 5 S o u t h F i f t h A v e n u e S u i t e 5 1 3 M i n n e a p o l i s , M N 5 5 4 0 1 T e l : 6 1 2 - 2 5 2 - 9 0 7 0 F a x : 6 1 2 - 2 5 2 - 9 0 7 7 W e b : l a n d f o r m . n e t L a n d f o r m ® a n d S i t e t o F i n i s h ® a r e r e g i s t e r e d s e r v i c e m a r k s o f L a n d f o r m P r o f e s s i o n a l S e r v i c e s , L L C . D A T E I S S U E / R E V I S I O N R E V I E W C O N T A C T E N G I N E E R F O R A N Y P R I O R H I S T O R Y I S S U E / R E V I S I O N H I S T O R Y D E V E L O P E R M U N I C I P A L I T Y H E R I T A G E R I D G E 4 T H A D D I T I O N H A S T I N G S , M I N N E S O T A C O N S T R U C T I O N D O C U M E N T S A p r i l 2 1 , 2 0 2 2 Z Z Z 1 9 4 5 0 . F L C 2022 P R E L I M I N A R Y N O T F O R C O N S T R U C T I O N T C L A N D I N V E S T M E N T S , L L C 1 3 9 2 5 F e n w a y B l v d . N o . H u g o M N 5 5 0 3 8 I h e r e b y c e r t i f y t h a t t h i s p l a n w a s p r e p a r e d b y m e , o r u n d e r m y d i r e c t s u p e r v i s i o n , a n d t h a t I a m a d u l y L i c e n s e d P r o f e s s i o n a l E n g i n e e r u n d e r t h e l a w s o f t h e s t a t e o f M I N N E S O T A . S i g n a t u r e s h o w n i s a d i g i t a l r e p r o d u c t i o n o f o r i g i n a l . W e t s i g n e d c o p y o f t h i s p l a n o n f i l e a t L a n d f o r m P r o f e s s i o n a l S e r v i c e s , L L C o f f i c e a n d i s a v a i l a b l e u p o n r e q u e s t . R a n d a l l C . H e d l u n d L i c e n s e N o : 1 9 5 7 6 D a t e : 4 / 2 1 / 2 0 2 2 C 1 0 1 Z Z Z 4 5 0 - P H 0 4 . d w g E X I S T I N G C O N D I T I O N S & D E M O L I T I O N C 1 . 1 : S a w c u t O u t l o t E , H E R I T A G E R I D G E , a c c o r d i n g t o t h e r e c o r d e d p l a t t h e r e o f , D a k o t a C o u n t y , M i n n e s o t a . A N D O u t l o t B , H E R I T A G E R I D G E 3 R D A D D I T I O N , a c c o r d i n g t o t h e r e c o r d e d p l a t t h e r e o f , D a k o t a C o u n t y , M i n n e s o t a . P r o p e r t y A r e a = 1 2 . 1 2 A c . 9 S T S STS >> STS >> STS >> STS >>STS >> >> STS >> >> S T S >> S T S >> S T S >> STS > > S T S >> ST S > > S T S > > S T S >> S T S > > ST S >> ST S >> ST S >> ST S >> W S T S > > STS >> STS >> STS >> STS >> S T S > > S T S >> STS > > STS > > STS > > STS > > STS > > ST S >> STS >> S T S > > STS >> STS >> STS >> STS >> STS >> STS >> STS >> STS >> S T S > > S T S > > S T S > > S T S > > S T S > > S T S > > S T S > > S T S > > S T S > > STS >>STS >>STS >>STS >>STS >> ST S >> STS >> STS >> STS >>STS >>STS >>STS >>STS >>STS >> CB RE=888.8 IE=885.2 CBBH TOP CL RE=888.8 IE=884.4 CB RE=882.8 IE=879.4 CB RE=887.1 IE=883.4 CB RE=890.1 IE=886.9 SB 103 SB 102 SB 104 SB 106 SB 105 SB 100 SB 101 SB 111 TP 3 &3A TP 4 TP 2 & 2A TP 6 TP 5 TP 1 TP 10 TP 9 TP 8 TP 7 TP 11 TP 12 TP 13 TP 20 SAND STOCKPILE BLACK DIRT STOCKPILE ROCK STOCKPILE BL O C K 1 BLOC K 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 2 3 45 6 7 8 NO R T H R I D G E CIRC L E 2 1 DRIVE 11109876 5 4 2 BLOCK 4 BL O C K 3 NOR T H R I D G E NO R T H R I D G E CIRC L E 1 3 OUTLOT A PHA S E 4 PHA S E 3 P H A S E 3 P H A S E 2 PHA S E 4 PHA S E 3 PHA S E 3 PHA S E 2 PH A S E 4 PH A S E 3 G F = 9 1 6 . 5 L F = 9 0 8 . 0 F B 9 1 6 . 3 88 8 . 5FB L O ( 4 . 8 ' ) LF = 8 8 4 . 8 GF = 8 9 2 . 6 DR P 1C 888. 8 FBL O LF= 8 8 6 . 3 GF= 8 9 4 . 1 DRP 1C 887.8 FBW O LF=8 8 8 . 3 GF=8 9 6 . 8 891.4 FBWO LF=891. 9 GF=900. 4 895.8 FBWO LF=896.3 GF=904.8 899.7 FBWO LF=900.2 GF=908.7903.0 FBWO LF=90 3 . 5 GF=91 2 . 0 908 . 5 FBL O LF= 9 0 6 . 0 GF= 9 1 4 . 5 91 7 . 0 FB LF = 9 0 8 . 7 GF = 9 1 6 . 5 DR P 1C 91 8 . 1 FB LF = 9 0 9 . 8 GF = 9 1 7 . 6 DR P 1C 91 7 . 7 FB LF = 9 0 9 . 4 GF = 9 1 7 . 9 DR P 1C G F = 9 1 5 . 0 LF = 9 0 6 . 5 F B L O 90 9 . 0 GF=91 2 . 2 LF=903 . 7 FBWO 903.2 GF= 9 0 5 . 5 LF= 8 9 7 . 0 FBL O 899. 5 GF = 8 9 3 . 1 LF = 8 8 6 . 0 FB 894 . 3 DR P 2C GF= 8 9 4 . 5 LF= 8 8 6 . 0 FB 894. 3 GF=89 8 . 5 LF=89 0 . 0 FBLO ( 3 ' ) 895.5 GF=904.0 LF=895.5 FBLO(5') 899.0 GF=909.0 LF=900.5 FBLO 903.0 898 . 8 FB L O LF = 8 9 6 . 3 GF = 9 0 4 . 8 898.0 FBW O LF=8 9 8 . 5 GF=9 0 7 . 0 901.6 FBWO LF=902.1 GF=910. 6 GF = 8 9 2 . 9 LF = 8 8 5 . 8 FB 89 4 . 1 GF = 8 9 4 . 0 LF = 8 8 5 . 5 FB 89 3 . 8 88 6 . 2 FB L O LF = 8 8 3 . 7 GF = 8 9 2 . 2 88 6 . 8 FB L O LF = 8 8 4 . 3 G F = 8 9 2 . 8 GF=8 8 9 . 7 LF=8 8 1 . 2 FBLO 883.7 GF=89 1 . 0 LF=88 2 . 5 FBLO 885.0 GF=892.5 LF=884.0 FBWO 883.5 GF=893.5 LF=885.0 FBWO 884.5 GF=894.0 LF=885.5 FBWO 885.0 GF=893.0 LF=884.5 FBWO 884.0 GF=894.0 LF=885.5 FBWO 885.0 GF=893.0 LF=884.5 FBWO 884.0 GF=892.6 LF=884.1 FBWO 883.6 RI D G E P O I N T D R I V E 1 4 + 0 0 1 4 + 6 3 . 1 9 0+001+002+003+00 4+00 5+00 6+00 7+0 0 8+0 0 9+0 0 10+ 0 0 11+ 0 0 12+ 0 0 13+ 0 0 14+00 15+00 16+00 16+89.69 PI: 0 + 0 0 . 0 0 PC : 3 + 2 1 . 3 3 PT: 7 + 8 8 . 2 0 PC: 1 2 + 5 7 . 6 6 EP : 1 6 + 8 9 . 6 9 0+0 0 1+0 0 2+00 3+00 4+00 5+0 0 6+ 0 0 7 + 0 0 8+00 9+00 10+ 0 0 10+ 0 9 . 4 4 PC: 0 + 8 6 . 8 5 PC C : 3 + 8 7 . 7 7 PT: 5+38.21 PC: 6+69.13 PR C : 7 + 9 7 . 9 4 PT: 9 + 2 2 . 5 8 -0+30 0+00 1+00 2+00 2+33.94 ? ? ? ? ? ? ? ? ? POND 30 NWL=876.40 100-YR=880.50 100-YR B-B=882.33 POND 90 100-YR=885.74 BTM=881.80 FOREBAY 10 NWL=878.00 100-YR=881.62 FOREBAY 40 NWL=890.00 100-YR=893.24 EX.POND 50 884.2 EOF % 2 . 0 % 2 . 0 01.8 8 8 . 0 % 8.1 % 8.3 % 8.8 % 8.3 % 7.8 % 6. 9 % 8 . 3 % 8.0 %8.1 %8.3 %9.1 %7.4 % 8.0 % 7.6 % 5.2 % 4.9 % 5.2 % 4.0 % 6.1 % 9.2 % 9.2 % 8.5 % 9.6 % 8.9 %8.2 %4.9 % 7.9 % 4. 6 % 4 . 4 % 4 . 8 % 4 . 2 % 4 . 4 % 4 . 9 % 4 . 4 % 7 . 1 % 8 . 8 % 2.1 %2.1 %2.9 % 2 . 4 % 2 . 0 % 2. 3 %2.0 % 2.3 % 2. 3 93.6 92.4 90 4 900 898 896 892 890 902 902 908 906 916 912 91 2 91 6 912 910 910 908 9 0 8 90 4 90 0 89 6 890 892 896 886 88 8 890 886 88 4 88 2 88 0 87 8 87 6 874 886 882 880 888 886886 882 8 9 4 89 2 888 892 894 896 898 892 894 89 6 89 8 9 0 0 900 9 0 6 91 4 91 2 90 8 90 4 9 0 8 91 4 912 908 91 0 904 9 0 4 898 902 906 90 8 904 910 9 1 4 912 91 6 916 91 6 91 8 92 0 916 9 1 8 914 892 89 4 890 88 8 886 88 6 890 8 9 2 892 88 8 884 882 884 892 8 8 6 882 884 89 0 892 892 892 888 890 888 92.5 890 89 0 892 890 888 886 892892 884 884 884 (9 2 . 1 ) 97.9 01.9 01.9 (99 . 6 ) 02.1 02. 0 (85. 5 ) (86.0 ) ( 8 7 . 1 ) ( 8 6 . 6 ) (8 1 . 5 ) (8 2 . 5 ) 06 . 0 6 11. 7 0 14.50 05.0 0 16.05 15.09 15.99 16.81 17.60 16.94 13.95 11 . 5 0 0 8 . 2 0 04 . 3 3 99 . 9 0 96. 3 0 93. 6 0 92.1 0 92.90 93.0 0 94. 0 0 98 . 0 0 03 . 5 0 08. 5 0 12.20 06 . 5 0 04. 3 0 92.4 0 91.7 0 89 . 2 0 8 9 . 2 0 9 0 . 5 0 9 2 . 0 0 9 3 . 0 0 93 . 5 0 92 . 5 0 92 . 5 0 92 . 1 0 (81.0 ) (81.6 ) (81.0 ) (81.5 )(81.0 )(81.0 )(81.0 )(81.0 ) (84.2 ) (91 . 0 ) (91 . 9 ) (93. 2 ) (9 7 . 9 ) (97.1 ) (04.2 ) (09. 5 ) (12.8 ) (16.4 ) (12.7 ) (20.0 ) (20.1 ) (10.1 )(08.4 ) (98.0 ) (91.2 )(84.5 ) (83.1 ) 89.7 90.791.792.492.3 91.2 89.9 88.5 87.7 89.2 86.20 87.8 81.9 82.8 85.2 90.6 90.9 92.5 95.3 99.2 03.807.3 10. 4 12.9 14.6 15.3 14.8 13.2 10.9 05.5 03.9 05.0 15.3 99.2 95.8 91. 6 02.9 97.2 93.1 91.1 91.4 91.0 84 . 5 02. 5 7 (02 . 3 ) (97. 7 ) 89.7 3 L.P. 90.1 4 % 1.7 % 7.4 %7.4 14 . 9 8 H. P . % 7. 4 % 6. 8 % 1.5 1 %6.4 %2.0 87.3 2 L.P. % 1.65 92.12 H.P.%1.65 %2.05 88.13 L.P.88.92%1.7 (87.3 ) (8 6 . 0 ) (86.8 ) (89.1 ) (90.5 )(91.1 )(90.6 ) 91.76 % 2.1 5 89. 1 8 L.P . % 2.0 86.50 86.50 87.00 86.50 87.68 (93.2 )(93.2 ) 87.7 E O F 87.0 87.1 86.5 C7.5 4 BITUMINOUS SAW & SEAL C7.1 2 ROCK CONSTRUCTION ENTRANCE C7.1 2 ROCK CONSTRUCTION ENTRANCE C7.1 1 SILT FENCE (TYP.) C7.1 1 SILT FENCE (TYP.) C7.1 2 INLET PROTECTION (TYP.) 22 TEMPORARY POND 10 C7.1 1 SILT FENCE (TYP.) EXISTING SILT FENCE CONSTRUCTION DOCUMENTS RCH21 APRIL 2022 PROJECT NO. FILE NAME LA N D F O R M c IF THE SIGNATURE, SEAL OR FOUR LINES DIRECTLY ABOVE ARE NOT VISIBLE, THIS SHEET HAS BEEN REPRODUCED BEYOND INTENDED READABILITY AND IS NO LONGER A VALID DOCUMENT. PLEASE CONTACT THE ENGINEER TO REQUEST ADDITIONAL DOCUMENTS. PROJECT CERTIFICATION 105 South Fifth Avenue Suite 513 Minneapolis, MN 55401 Tel: 612-252-9070 Fax: 612-252-9077 Web: landform.net Landform®and Site to Finish®are registered service marks of Landform Professional Services, LLC. DATE ISSUE / REVISION REVIEW CONTACT ENGINEER FOR ANY PRIOR HISTORY ISSUE / REVISION HISTORY DEVELOPER MUNICIPALITY HERITAGE RIDGE 4TH ADDITION HASTINGS, MINNESOTA CONSTRUCTION DOCUMENTS April 21, 2022 ZZZ19450.FLC 20 2 2 PREL I M I N A R Y NOT F O R CONS T R U C T I O N TC LAND INVESTMENTS, LLC 13925 Fenway Blvd. No. Hugo MN 55038 I hereby certify that this plan was prepared by me, or under my direct supervision, and that I am a duly Licensed Professional Engineer under the laws of the state of MINNESOTA. Signature shown is a digital reproduction of original. Wet signed copy of this plan on file at Landform Professional Services, LLC office and is available upon request. Randall C. Hedlund License No:19576 Date:4/21/2022 C301ZZZ450-PH04.DWG GRADING, DRAINAGE & EROSION CONTROL C3.1 NORTH 0 50 100 BUILDING TYPE FBWO = FULL BASEMENT WALK OUT FBLO = FULL BASEMENT LOOK OUT FB = FULL BASEMENT NO WALK OUT NO LOOKOUT XXX.X FBWO/FB XXX.XX/XXX.X GF=XXX.X : FRONT GARAGE FLOOR ELEVATION : UNIT TYPE : MIN. BSMT ELEV./LOWEST OPENING ELEV. : REAR ELEVATION NOTES: 1. GARAGE LOCATION INDICATED BY DRIVEWAY. 2. THERE MUST BE AT LEAST 6" DROP IN GROUND ELEVATION WITHIN 10 FT. OF THE STRUCTURE. NO SCALE PAD DETAIL Contact utility service providers for field location of services 72 hours prior to beginning grading. Geotechnical boring locations are approximate and are based on information provided in the Geotechnical Report prepared by Haugo GeoTechnical Services, LLC, Minneapolis, MN, on October 2, 2020.. Remove topsoil from grading areas and stockpile sufficient quantity for reuse. Remove surface and ground water from excavations. Provide initial lifts of stable foundation material if exposed soils are wet and unstable. An Independent Testing Firm shall verify the removal of organic and unsuitable soils, soil correction, and compaction and provide periodic reports to the Owner. Place and compact fill using lift thicknesses matched to soil type and compaction equipment to obtain specified compaction throughout the lift. Compact cohesive soils in paved areas to 95% of maximum dry density, Standard Proctor (ASTM D698) except the top 3 feet which shall be compacted to 100%. Compact to 98% density where fill depth exceeds 10 feet. The soils shall be within 3% of optimum moisture content. In granular soils all portions of the embankment shall be compacted to not less than 95% of Modified Proctor Density (ASTM D1557). Avoid excavating bottom 18 inches of infiltration basins until the rest of the site has been stabilized. Any equipment used in Infiltration Areas should be small scaled and tracked. Install protective fencing as shown after grading of basins. 14. 15. 16. 17. 18. 19. 20. 21. GRADING NOTES GENERAL NOTES For construction staking and surveying services contact Landform at 612.252.9070. No construction may begin on site until the erosion & sediment control has been installed and approved by the city. All concrete trucks on site must have self contained water supply for washout. Drainage and utility easement over all of Outlot A. 1. 2. 3. 4. Install perimeter sediment controls prior to beginning work and maintain for duration of construction. Remove controls after areas contributing runoff are permanently stabilized and dispose of off site. Limit soil disturbance to the grading limits shown. Schedule operations to minimize length of exposure of disturbed areas. Management practices shown are the minimum requirement. Install and maintain additional controls as work proceeds to prevent erosion and control sediment carried by wind or water. Refer to SWPPP Notes on Sheet C3.3 for additional requirements. All exposed soil areas must be stabilized within 14 days of completion of work in each area. Seed, Sod, Mulch and Fertilizer shall meet the following Specifications, as modified. Item Specification Number Estimated Quantities Sod MNDOT 3878 x s.f. Seed MNDOT 3876 MN Type 21-111 @ 100 lb./ac. - Temporary Erosion Control, x lbs. May 1 - Jul 31 MN Type 21-112 @ 100 lb./ac. - Temporary Erosion Control - Aug 1 - Oct 31 x lbs. MN Type 25-151 @ 120 lb./ac. - Permanent Turf x lbs. Mulch MNDOT 3882 MNDOT Type 1 @ 2 ton/ac., Disc Anchored Fertilizer MNDOT 3881 General Placement MNDOT 2575 Reserved. Scrape adjacent streets clean daily and sweep clean weekly. No construction may begin onsite until the erosion and control has been installed and approved by the City of Hastings. 5. 6 . 7. 8. 9. 10. 11. 12. 13. EROSION PREVENTION AND SEDIMENT CONTROL NOTES EROSION BLANKET EMERGENCY OVERFLOW No Scale 88 7 . 1 88 7 . 1 7' 3' 886.6 4:1 3 4:1 10' EASEMENT 3' TYPICAL 5:15:1 FINISHED GRADE NO SCALE STANDARD RESIDENTIAL SWALE : ADDITIONAL COMPACTED AREA FOR DECK OR PORCH FOOTINGS (TYP.) 2 1 TEMPORARY SEDIMENT BASIN NOTES POND 10 is a temporary sedimentationbasin. tributary area tp Pond 10 is 7.19 ac. Peak elevation for the 2-year, 24-hour storm is 879.28 which equates to c.f. Required live volume = 7.19 X 1,800 = 12,942 c.f., therefor the pond meets the requirements. 22. LEGEND :Inlet Protection :Pavement Sawcut :Vehicle Tracking Pad ESTIMATED QUANTITY 24 ea. 2 ea. SYMBOL DESCRIPTION :Silt Fence 3,454 ft. 18"