Loading...
HomeMy WebLinkAboutVIII-17 Fire Station Alerting System - Memorandum of Understanding City Council Memorandum To: Mayor Fasbender & City Councilmembers From: John Townsend, Fire Chief Date: April 18th, 2022 Item: Approve Memorandum of Understanding Council Action Requested: Approve Memorandum of understanding with City of Burnsville for station alerting. Background Information: Burnsville received a FEMA grant to install the US Digital Design (USDD) fire station alerting system that can be used regionally. The backbone of the system is installed at the Dakota Communications Center (DCC). This system was placed online in 2015. The system has the ability and capacity to serve stations outside the City of Burnsville, and the City of Burnsville’s End User agreement with USDD authorizes the City of Burnsville to make the system available for use by others on the same dispatch platform. The City of Hastings Fire department has installed, and is utilizing the system. This system was approved and installed as part of the 2021 Budget. Financial Impact: Budgeted item Advisory Commission Discussion: N/A Council Committee Discussion: N/A Council Workshop: Discussed department needs and operations at Council workshops. Attachments: MOU VIII-17 211059v1 Memorandum of Understanding Between City of Burnsville (Burnsville) And City of Hastings (Hastings) This Memorandum of Understanding (MOU) sets forth the terms and understanding between the Cities of Burnsville and Eagan regarding use by the City of Eagan Fire Department of the City of Burnsville’s fire station alerting system. Background Burnsville received a FEMA grant to install the US Digital Design (USDD) fire station alerting system that can be used regionally. The backbone of the system is installed at the Dakota Communications Center (DCC). This system was placed online in 2015. The system has the ability and capacity to serve stations outside the City of Burnsville, and the City of Burnsville’s End User agreement with USDD authorizes the City of Burnsville to make the system available for use by others on the same dispatch platform. Purpose This MOU allows the City of Hastings to use the US Digital Design Fire Station Alerting System. The annual, ongoing, replacement and upgrade cost of the backbone of the system located at the DCC will be shared amongst those departments that are using the system based on the number of fire stations each city has on the system. Each city is solely responsible for all of the costs and maintenance of the station alerting equipment outside of the DCC. The City of Burnsville does not warranty or guarantee the reliability of the USDD fire station alerting system and each city is responsible for having a back-up alerting system that meets their operational needs. Duration This MOU is for “as is” access and may be modified by mutual consent of authorized officials from the cities. This MOU shall become effective upon signature by the authorized officials from each city and will remain in effect until modified or terminated. A one year (365 day) notice shall be provided prior to terminating this MOU. Contact Information City of Hastings Representative: Mary Fasbender Mayor 101 East 4th Street Hastings, MN 55033 City of Burnsville Representative: B.J. Jungmann, Fire Chief 100 Civic Center Parkway Burnsville, MN 55337 ________________________________ _________________________________ City of Hastings Signature: Representative Signature: Mary Fasbender, Mayor B.J. Jungmann, Burnsville Fire Chief _______________ _______________ Date Date VIII-17