HomeMy WebLinkAboutHPC Packet 02-15-2022HASTINGS HERITAGE PRESERVATION COMMISSION
Agenda for the February 15, 2022
Regular business at 7:00 p.m. at City Hall in the Volunteer Room
Due to the Declaration of Local Public Health Emergency, members of the Commission may participate
via Zoom video meeting. The public may also monitor and provide comment during the meeting via
Zoom as directed on the City Website www.hastingsmn.gov.
I. Call to Order and Quorum
II. Swearing in of HPC Commissioners
A. Emily Chouman
III. Minutes:
A. January 18, 2022
IV. Certificate of Approval Review
A. 218 2nd Street East – New Storm Windows
V. OHDS (Original Hastings Design Standards) Project Review
A. 502 6th St E - House Addition and Detached Garage
VI. Business and Information
VII. Adjourn
The next regularly scheduled meeting will be held on March 15, 2022 at Hastings City Hall
HASTINGS HERITAGE PRESERVATION COMMISSION
Minutes of the Meeting of January 18, 2022
Held at 7:00 p.m. at City Hall
I. Quorum: Toppin, Smith, Youngren, Borchardt, Peterson, and Blasing
Absent: Simacek, Chouman, and Sovik Siemens
Staff Present: Justin Fortney, City Planner
Chair Toppin called the meeting to order at 7:00 pm.
II. Swearing in of HPC Commissioners
A. Krista Peterson
B. Connie Blasing
III. Elections
A. Elect HPC Chair and Vice Chair.
Motion by Commissioner Smith to reelect Commissioner Toppin as Chair of the HPC,
seconded by Borchardt - motion approved 6-0
Motion by Commissioner Blasing to reelect Commissioner Smith as Vice Chair of the HPC,
seconded by Commissioner Borchardt. Motion approved 6-0
IV. Minutes: September 21, 2021
Chair Toppin approved the minutes without any comment from the commission.
V. Certificate of Approval Review
A. 103 2nd Street East – New Sign and Awning- Committee Approved (11-16-
2021)
Fortney updated the Commission on the Committee approval.
IV. Business
A. Discuss Year End Report
Fortney explained the background of the yearly HPC report to SHPO, which is due at the end of
their fiscal year. It covers HPC membership, historic resource listings, HPC activities, and
property review cases.
B. Newspaper Digitization Project
Fortney updated the commission on the project history and explained that the City Council has
funded the project. He explained that staff tried to obtain grants, but were denied due to this type
of project being prohibited from state grants. He added that the state already uses some pre-grant
funding for digitization projects. Fortney said he is having a bid redrawn to assure that MNHS
News Paper Hub can archive and host the digital output.
C. Discuss Recent Public Outreach and 2022 Communication Goals
Toppin discussed recent events and new opportunities. She said she would like to meet with the
city Communications Coordinator and HPC staff in February to discuss further.
V. Adjourn
Motion by Blasing to adjourn the meeting at 8:21 pm, seconded by Youngren; motion
approved 6-0.
Respectfully Submitted - Justin Fortney
CERTIFICATE APPLICATION
2-2022
218 2nd Street E. Rebuild three second floor principal elevation double hung
windows with new storm windows- Steve and Jenny Green
Ca. 1880, East Second Street Historic District – Contributing
Request: The applicant is having the upper three front windows refurbished with wood
framing, rails and trim being repaired or replaced as necessary.
New wood combination storm windows will be custom made and installed protect them
the windows and add efficiency. The storm windows will be aluminum track with wood
cladding on the exterior. The window rebuilding and custom storm windows will be done
by SP Custom Carpentry & Windows.
Design Guidelines (Page 21) Windows
1. Maintain and conserve - Wherever feasible, historic windows and sash should be repaired
rather than replaced, especially on principal elevations.
4. Trim - Retain all decorative trim around the windows, including lintels, sills,
pediments, and hoods. If trim replacement is necessary the original profile should be
replicated.
5. Storm Windows - Repair or replicate historic wood storms wherever possible. Storm
windows should not have vertical or horizontal divisions that conflict with the divisions
of the historic sash and should be flush with existing trim. If combination metal storms
must be installed, they should have a baked enamel factory finish.
Staff findings:
The current windows are in poor shape and may not have always been utilizing storm
winnows. The proposed reconstruction is most appropriate for the windows. The custom
storms will protect the historic windows the protection and efficiency required.
Project bid sheet
To: Heritage Preservation Commission
From: Justin Fortney, City Planner
Date: February 15, 2022
Item: OHDS Review for House Addition and Detached Garage – 502 6th St E – Matt and
Sandra Heiman
HPC ACTION REQUESTED:
Review the proposed plans and provide a recommendation to the City Council.
BACKGROUND
Existing Condition
OHDS Intent
The purpose of the OHDS area is to preserve and enhance
traditional neighborhood design by reflecting the general
characteristics of buildings dating from 1845 to 1940,
which is the predominate era for building construction
within the OHDS District. OHDS regulations ensure
traditional neighborhood design by incorporating design
features such as alleys, carriage houses, front porches,
period sensitive housing design, sidewalks, and traditional street lighting. Design standards
create and enhance the character of older neighborhoods by establishing regulations to
guide property development and rehabilitation consistent with the unique historic
character of the neighborhood. The intent is to preserve that streetscape’s character rather
than the actual historical fabric that historical designation is intended to protect.
The full set of guidelines may be found in the zoning code: R-2 Original Hastings design
Standards
Site Layout
The applicants propose to remove a small detached garage and replace it with an attached
kitchen addition and modest garage. The addition and garage are proposed on the back of
the house with a west facing garage door. It will access the same driveway that accesses 6th
Street E.
HPC Memorandum
The applicants are also proposing a new 700 Sf detached garage in the rear of the property
facing north to access the existing driveway. The garage is an oversized one car with a small
office.
The addition and detached garage will be no higher than the existing peak of the home. The
proposals will match the architecture and some of the existing roof angles of the home.
Setbacks
Minimum Proposed
North
(Front)
6th St E
20’ (or inline
with neighbors,
but no less than
10’
N/A
East 7’ N/A
West 10’ 10’
South
(Garage)
5’ 5’ 3” but
Easement
Encroachment
The proposed detached garage is partially within the vacated alley, which as a condition of
vacation, is now a drainage and utility easement. Accessory structures are not allowed
within an easement. Some positioning adjustment will be necessary.
Vehicular Access and Circulation
The OHDS regulations require new detached garages to access developed alleys. There is
not a developed alley and this portion of the platted alley was vacated. Developing an alley
in this area would be complicated due to the existing RR tracks.
Design Review
The current OHDS Guidelines include many requirements based on the immediate
neighborhood average. Designing a house by averaging the type and number of
neighboring features is near an impossible task and certainly would not guarantee a good
design. The proposal was designed well to match the existing house. Having a small
attached and a detached garage keep the building scale lower and is a more traditional
appearance of a detached structure/ carriage house.
Scale
The homes in the area are a mix of one- and two-story homes. There are a mix of very small
and large homes. The home to the west is a large two-story home with an enormous
detached garage/ the home to the south is a modern home with a large garage attached to
the front.
The scale of the existing home is similar to the neighborhood average. It is very old, but has
had many changes over the years.
Recommendation
Staff recommends approval with the following conditions, based on the design being of a
similar scale and layout of the subject and surrounding properties. The design and scale
would not cause a distraction from the appearance or character of the streetscape. Since
the phases of the plan are documented to 2023, the approval should condition an 18-month
approval rather than the typical 12-month to allow for permitting and completion without
the need for reauthorization.
1. Approval is subject to an 18-month Sunset Clause; building permit must be obtained
and work begun within 18-months of City Council approval or approval is null and
void.
2. Placement of the detached garage must not be within any easements.
Attachments
- Location Map
- Certified Survey
- Plans
- Area Photos
LOCATION MAP
Existing
Proposed
505 7th st E
Behind subject home
420 6th St E west of home
East of Home – 508 & 510 6th St E
North of Home – 509 6th St E