HomeMy WebLinkAbout10/12/87HASTINGS PLANNING COMMISSION
October 12, 1987
The regular meeting of the Hastings Planning Commission was called
to order at 7:30 p.m.
Members Present:
Members Absent:
Commissioners Anderson, Kaiser, Dredge,
Simacek, Folch, Conzemius, Voelker, Ditty
(Commissioner Ditty arrived at 8:10 p.m.)
Commissioner Stevens
Staff Present:
Planning Director Tom Harmening and
Assistant Planner Steve Bjork
A motion was made by Commissioner Kaiser,
seconded by Commissioner Anderson to approve
the September 28, 1987 Planning C~mmission minutes.
Upon vote taken, Ayes, 7; Nayes, None.
MINUTES
Chairman Simacek opened the public hearing
at 7:31 p.m. for the preliminary/final plat
of Riverwood 3rd Addition. There being no
comments from the audience, the public hearing
was than closed at 7:32 p.m. After discussion,
a motion was made by Commissioner Dredge, seconded
by Cc~unissioner Kaiser to approve the preliminary/
final plat of Riverwood 3rd Addition. Upon vote
taken, Ayes, 7; Nayes, None.
PUBLIC HEARING-
RIVERWOOD 3RD
ADDITION PLAT
ADVANCED HOMES
Chairman Simacek opeD~d discussion on the site SITE PLAN REVIEW
Plan Review of an 8 ~nit condominium in Riverwood 8 UNIT CONDO-
3rd Addition. After discussion, a motion was RIVERWOOD 3RD
made by Co~unissioner Anderson seconded by ADDITION
Commissioner Kaiser to approve the site plan for ADVANCED HOMES
the 8 unit condominium subject to the following conditions:
That a revised landscaping plan be submitted and
approved by city staff illustrating the following:
a. Size and species type
b. Improved screening/landscaping along the south
property line and also adjacent to the parking
lot abutting the street.
Provide information on outside lighting provisions.
Outside lighting should not be obtrusive to
adjacent residential areas.
Provide revised site plan for staff approval which
illustrates the size, location and elevation of water
and sewer services.
4. Building locations to be staked by a surveyor
for construction purposes.
That the applicant be aware that a 14" city
watermain is located in the 20 foot utility
and drainage easement located along the south
property line.
That the lowest floor elevation of the condo building
be constructed at an elevation such that it will
be protected from the projected high water level
in the adjacent drainage swale and also from the 100
year flood plain elevation of the Vermillion River.
That the structure and accessory items such as the
parking lot, landscaping, etc. be completed pursuant
to the approved site plan. Upon request for occupancy
of the building all uncompleted items contained within
the site plan shall be addressed pursuant to the
escrow requirement contained in the site plan review
provisions of the City Zoning Ordinace (Section 10.24).
That the NRRC review matters pertaining to the need for
the applicant to install previously required walkways
within the Riverwood 1st and 2nd Addition Plat.
The Planning Cc~mmission discussed the possibility HOME OCCUPATION
of implementing a waiver process to the Home WAIVER PROCESS
Occupation Standards. After discussion, a motion
was made by Commissioner Folch seconded by
Commissioner Kaiser to order a public hearing for
October 26, 1987. Upon vote taken, Ayes,7;Nayes, None.
The Planning Commission briefly discussed the
clarification of the corner lot setback ordinance
that was established in 1984. Mo action was taken.
SETBACK
ORDINANCE
A motion was made by Commissioner Anderson,
seconded by Cc~mmissioner Kaiser requesting the
City Council to consider reducing the number of
Planning Cc~amission members from 9 to 7. Upon
vote taken, Ayes, 4; Nayes, 3; Commissioner
Voelker abstained.
REDUCE THE
NUMBER OF
COMMISSION
MEMBERS
There being no further business, a motion was
made by Co~/~issioner Conzemius, seconded by
Commissioner Folch to adjourn the meeting at
8:15 p.m. Upon vote taken, Ayes, 8; Nayes, None.
ADJOURNMENT