HomeMy WebLinkAbout3 - Motorcoach Commerce Facility
To: Planning Commissioners
From: John Hinzman, Community Development Director
Date: May 10, 2021
Item: Hastings Commons LLC - Interim Use Permit and Site Plan #2021-17 - Motor Coach
Commerce Facility - 24xx Vermillion Street
Planning Commission Action Requested
Review the following actions for development of a 12 unit Motor Coach Commerce Facility as
proposed by Hastings Commons LLC. The 1.13 acre site is generally located east of 25th and
Vermillion Streets, between Vermillion and the Coratel Inn and Suites (former Super 8):
1) Interim Use Permit for the operation of a Motor Coach Commerce Facility
2) Site Plan for construction of a Motor Coach Commerce Facility
BACKGROUND INFORMATION
Comprehensive Plan
The property is guided C - Commercial within the 2040 Comprehensive Plan. The proposed use is
consistent with the Comprehensive Plan.
Zoning
The property is zoned C-2 - Highway Auto Sales and Service. Motor Coach Commerce Facilities
are allowed through issuance of an Interim Use Permit.
Existing Condition
The site contains two parcels and is relatively flat and treeless. Two parking lot drive ways
providing access to the adjacent hotel bisect the property.
Proposed Condition
Construction of a 12 pad Motor Coach Commerce Facility including a small (100 s.f.) detailing and
commerce center, dump station, and water fill. All utilities would be private.
Planning Commission Memorandum
Adjacent Zoning and Land Use
The following land uses abut the property:
Direction Use Comp Plan District Zoning District
North Hastings Car Wash Commercial C-2
East Coratel Inn Commercial C-2
South Hastings Terrace Mobile Home
Park
Commercial C-2
West Vermillion Street
Nichols Inn, Subway, Old Mill
Pawn
Commercial C-3
History
The applicant and City executed a Settlement Agreement pertaining to law suit filed by the
applicant for the proposed Motor Coach Commerce Facility use. The applicant agreed to certain
conditions for the use and operation of the facility and City agreed to amend the City Code to
allow consideration of the use through issuance of an Interim Use Permit.
Interim Use Permit
Interim Uses are non-permanent uses that are allowed for a limited period of time. Specific
Interim Uses are identified within certain Zoning Districts. Review and approval are conducted
before the Planning Commission and City Council, respectively. Certain conditions of operations
are established and the City and memorialized within a written agreement executed by both the
applicant and City.
Public Hearing Notification
Notice of the public hearing was mailed to all property owners within 350 feet of the property.
The following comments have been received:
• Champak Bhakta - Coratel Inn and Suites - Oppose issuance of the permit
• Dan Mattimiro - 114 25th Street W - Disapprove issuance of permit. Concern over traffic and
appearance.
Please see the attached Public Hearing Comments for further information.
INTERIM USE PERMIT REVIEW
Ordinance Requirements
City Code Chapter 155.29, Subd. D(1) allows Motor Coach Commerce Facilities
through issuance of an Interim Use Permit
Interim Use Permit (IUP) Review
City Code Chapter 30.02, Subd. E.3 – Board of Adjustment and Appeals - Interim Use Permits
outlines specific rules and review criteria for the issuance of SUPs, including:
• Zoning Conformance – IUP’s for Motor Coach Commerce facilities are allowed in the C-2
District. Additional zoning conformance will be included as part of Site Plan review.
• Temporary Use – The IUP would be issued for an initial period of 10 years. The applicant
may apply for an additional 10 at the conclusion of the original IUP.
• Additional Costs Upon Future Taking – Limited building construction would take place
upon the property. The City is not aware of any plans for future taking of the property.
• Applicant Agreement to Conditions – A written agreement would be executed between
the City and Applicant to memorialize conditions consistent with the Lawsuit Settlement
Agreement.
• Adherence to Interim and Special Use Permit Standards – Specific conformance to Special
Use and Interim Use provisions is further documented below.
• Ingress and Egress\Off-Street Parking and Loading – The site will utilize two existing
private driveways providing access to Vermillion Street and the Coratel Inn. Private drives
will provide access to specific pad rental sites. Each rental site will provide for off street
parking for those renting the site.
• Refuse and Service Areas – Refuse areas must provide for the screening of trash and
refuse.
• Utilities – Utility access and availability is satisfactory. All interior site connections will be
private.
• Screening and Buffering – Fencing and landscaping will be installed along Vermillion Street
to screen and buffer the site from the roadway.
• Signs and Exterior Lighting – Any signage will be approved via an administrative permit at
a later date. Lighting adheres to maximum illumination requirements.
• Required Yard and Open Space – Yard and open spaces areas are acceptable, there are
not prescribed setbacks in the C-2 Zoning District.
• General Compatibility with Adjacent Properties and the Surrounding Area – All adjacent
properties are zoned commercial.
Interim Use Permit Conditions
As part of the Settlement Agreement the City and Applicant agreed to certain terms of approval
for an IUP. The specific conditions are listed in Exhibit A and include the following:
• Type and Age - Type A Motor Homes and Travel Trailers only with an overall length of no
less than 20 feet and no more than 15 years old.
• Vermillion Street Sites - The four sites fronting Vermillion Street shall be occupied by
Motor Coaches only. Occupancy limited to more than 30 days in a 90 day period.
• Non-Vermillion Street Sites - Remaining eight sites may be used by Motor Coaches or
Travel Trailers. Occupancy limited to no more than 120 days in a 180 day period. Any
time period a Motor Coach occupies one or more of the four sites along Vermillion Street
shall be counted against the allowed time the Motor Coach can occupy the remaining
eight sites.
• Term of IUP - 10 years with the right to renew for an additional 10 years.
• Deadline for Construction - Construction of the Facility shall be completed by September
1, 2022.
• Commencement of IUP - November 1, 2022 or upon completion of construction,
whichever is earlier.
• Violations - Applicant given 30 days upon written notice to cure any alleged violations of
the IUP. City may revoke IUP if applicant fails to comply with the material terms and
conditions within 30 days of receipt of the written notice. Applicants may request a
hearing before City Council.
• Expiration or Revocation of IUP - Applicants must cease operation and remove all Motor
Coaches and Travel Trailers within seven days. Future uses must conform to current
zoning requirements.
• Non-Conforming Rights - Applicant shall not have any non-conforming use rights based on
prior use of the property.
• Rules of Operation - Operation of the Facility shall conform to the Rules of Operation
attached in Exhibit A. Rules shall be provided in writing to each customer.
• On-Site Manager - The Facility shall be managed by an on-site manager who shall enforce
rules and restrictions of the IUP.
• Site Plan - Applicant shall provide a Site Plan; operation and maintenance shall conform to
the Site Plan.
Rules of Operation
As part of the Settlement Agreement the City and Applicant agreed to certain rules of operation
including but not limited to noise, conduct, duration of stays, fires, pets, visitors, condition and
modifications of vehicles, camping, external structures, and storage of personal property. The
specific conditions are listed in Exhibit A and include the following
Recommendation
Approval of the Interim Use Permit to operation of a Motor Coach Commerce Facility is
recommended subject to the following conditions:
1. Conformance with the plans submitted with the Planning Commission Staff Report dated
May 10, 2021. Building height shall be no greater shown on the plans.
2. Execution of an agreement between the Applicant and City memorializing the terms and
conditions of Settlement Agreement between the City and Hastings Commons, LLC and
Summit Management, LLC as identified on Exhibit A including No. 4 Interim Use Permit
and Exhibit E of the Settlement Agreement - Rules of Operation - Motor Coach Commerce
Facility.
3. Site Plan approval of the Motor Coach Commerce Facility.
4. Approval is subject to a one-year Sunset Clause; if significant progress is not made towards
the proposal within one year of City Council approval, the approval is null and void.
SITE PLAN REVIEW
Proposal
Construction of a 12 pad Motor Coach Commerce Facility including a small (100 s.f.) detailing and
commerce center, dump station, and water fill. All utilities would be private.
Streets
No new public streets. All access drives would be privately owned and maintained. No new
access points to Vermillion Street. Private drives would be paved with surmountable curb and
gutter.
Vehicular Access and Circulation
Vehicles utilizing the waterfill and dump stations shall not block ingress and egress of the site.
Building Setbacks
Minimum building setbacks are not prescribed in the C-2 Zoning District. The location of the 100
s.f. Detailing and Commerce Center in excess of 10 feet from the western property line and 30
feet from the front property line is acceptable.
Pedestrian Access
A public sidewalk abuts the site along Vermillion Street. Internal private drives will be low volume
and proviede for pedetrian movement.
Parking
Each rental space would include room for the parking of one vehicle in addition to the space for
the Motor Coach or Travel Trailer.
Architectural Design
Design information for the proposed commerce center has been requested of the applicant and
not received at this time.
Fencing
A six foot durable composite white fence will be constructed along Vermillion Street to screen
activities of the facility.
Landscape Plan
A variety of trees and shrubs will be planted along the perimeter of the site. Along the Vermillion
Street fence, landscaping will be planted on the Vermillion Street side to enhance visual interest
from Vermillion Street. The applicant will also need to add four more trees to meet minimum
landscaping requirements as stipulated below:
Required Proposed
One tree per 4,000 s.f. of
paved surface – 15,400 s.f.
4 Trees 4 Trees
One tree per 50 feet of lot
perimeter – 926 feet
19 Trees 15 Trees
One shrub per 40 feet of lot
perimeter – 926 feet
23.2 shrubs 24 Shrubs
Lighting Plan
Proposed exterior lighting levels are acceptable. Lighting must be no greater than 0.5 footcandle
of illumination when abutting residential propeorty and 1.0 footcandles when facing commercial.
Grading, Drainage, Erosion Control and Utility Plan Review
The Public Works Department is reviewing the the Grading, Drainage, Erosion Control, and Utility
Plans. Site Plan approval shall be conditioned upon final approval of the Grading, Drainage,
Erosion Control and Utility Plan by the Public Works Director.
RECOMMENDATION
Approval of the Site Plan is recommended subject to the following conditions:
1. Conformance with the plans submitted with the Planning Commission Staff Report dated
May 10, 2021
2. Interim Use Permit Approval for a Motor Coach Commerce Facility.
3. Approval of architectural elevations for the commerce facility building by the Community
Development Director.
4. All drive aisles shall be paved with surmountable concrete curb and gutter on drive aisles
as indicated on the Low Profile Concrete Curb and Gutter Plan. The concrete curb shall be
12 inches wide, 3 inches dep, raising vertically 2 inches from the street to the lot (or
downward as required by site drainage)
5. A six-foot durable composite white fence must be constructed along Vermillion Street to
screen site activities. The City Planner shall approve the final plan and materials.
6. Four additional trees are needed to meet minimum quantity requirements in locations and
species approved by the City Planner.
7. A landscape surety must be provided in the amount of 125% of the value of proposed
landscaping and the applicant shall enter into an agreement drafted by the City with
respect to the surety and its use. The surety shall be effective for one growing season.
8. A stormwater plan has been submitted to the City Engineer. The Plan has been
preliminarily reviewed by the City Engineer and no on-site treatment of storm water is
required. It is the parties’ intentions that the site drain property and that the drainage
plan meet City requirements and the parties agree to work together in developing plans
that would accomplish this goal. The storm water improvements as approved by the City
Engineer with modifications, must be installed prior to site occupancy.
9. All disturbed areas on the property shall be stabilized with rooting vegetative cover to
eliminate erosion control problems.
10. Disturbed areas of the site shall be maintained to the requirements of the City’s property
maintenance ordinance.
11. Approval is subject to a one-year Sunset Clause; if significant progress is not made towards
the proposal within one year of City Council approval, the approval is null and void.
ATTACHMENTS
• Site Location Map
• Public Comments
• Site Plans
• Civil Engineering Plans
• Exhibit A - Settlement Agreement Terms
• Application
LOCATION MAP
PUBLIC COMMENTS
Champak Bhakta - Coratel Inn & Suites
Mr. Hizman,
As I talk to you on the phone today regarding the public hearing for interim use permit for motorcoach.
We,Coratel Inn & Suites are opposing for this permit use. It's not going to look good for our business. In
the past they used the lot for the RV / mobile homes. City denied the use of that space at that time. So for
better visibility of the motel (Coratel Inn & Suites), we are opposing this permit.
Dan Mattimiro - 114 25th Street W
Planning commission:
The drawing shared with stakeholders does not give additional warranties about upkeep of landscape,
proper drainage, environmental impact, length of stay permitted, required upkeep of renters must
maintain, penalties for failure to maintain, enforcement of codes, etc.
An explanation of what is meant by "interim" in the context used? Is it for the business or for the
proposed renters?
Please consider an alternative site, similar to where the new Villas at Pleasant are being located. How is it
that equity seems to be tossed out when it comes to this end of town?
On Sun, Apr 25, 2021, 6:49 PM MN Mattimiro <mnmattimiro@gmail.com> wrote:
Planning Commission:
I would like to express my disapproval of Hastings Commons, LLC for having an Interim Use Permit for the
purpose of operating luxury RV/Motor Coach/Travel Trailer rental lots.
1. Adds to congestion at an already precarious point along the Highway 61 corridor just north of the
Highway 316 turn.
2. Does not provide an alternate route to mitigate #1.
3. Adds to an existing lot/business that does not appear to function to its fullest extent [the current
business has changed names/hands/managers(?) repeatedly over the past 2+ decades without what
appears to be any increase in clientele] and gives the impression that this time, this new venture will make
something happen.
4. No additional planning for upgrading the current appearance (e.g. landscaping, signage) to enhance
and/or limit the current business to bring in more business has been attempted.
5. The city has not established any concrete long term plan for the Highway 61 corridor to bring real
change to traffic.
I would suggest that the city, at the very least, take out the option of a left turn from 61 onto 25th street
and from 25th street onto 61, before any further talk about changes to business in this area.
� c-:.:-�.:11V/tit:./-.:;::/.,·t::i /} ::..,,.". -.. .,..�li:r�4.�i�=.}�1:--�•;{.1w-.�..,.·-�-��--·fft.:
✓--.
I -�-·-· .-... �•
/� . -/'9'�' .
,IT
II ["': I
,�D-RAIN�f AND· .LlTI.LffY -s�SENd-ENI
DETAIUNG AND COMMERCE CENTER
DUMP STATION AND WATER ftLL <e
NORTH
�
56" i r . -•' � � '"'Ir'" I0'X2O' I
,. }Q�;,25� I
-�Ya'C t � jzo• ROAD _,_
1�-, .J
PARKING
m·xss· 1 ST.e.u.
LOT DETAIL
NTS
LANDSCAPE BUFFER
�· 60
SCA!.E: t. = .30•
Representative photos of Class A motor coaches
EXHIBIT A - INTERIM USE PERMIT - SETTLEMENT AGREEMENT