HomeMy WebLinkAbout3 - Report Site Plan and SUP
To: Planning Commission
From: Justin Fortney, City Planner
Date: February 22, 2021
Item: Special Use Permit and Site Plan – 2021-07 – Mini Storage – 2030 Spiral Blvd
Planning Commission Action Requested: The Planning Commission is asked to review the
proposed Special Use Permit with site plan and make a recommendation to the City Council.
Background Information:
The property is owned by the City of Hastings, which has owned the property since the
1970’s. In 2005, the City platted the area properties including those on Lightbourn Ct. In
addition, the City installed all the necessary infrastructure to attract industrial development
for job creation and to increase the tax base.
The applicant, Chad Smurawa, recently acquired two other city owned industrial park lots at
3001 Lightbourn Court and constructed mini-storage units.
SUP Review
The Zoning ordinance allows industrial uses in the I-1 district by right and retail services and
sales with a SUP (Special Use Permit). SUP review is to assure that a use is compatible with
the surrounding area. Conditions are allowed to be placed on a SUP approval to assure
compatibility with the area.
The proposed use of mini-storage would be considered a retail service rather than an
industrial use. Mini-storage does not produce much of the associated traffic, parking, and
visibility issues of other retail services. The site would not be staffed and most customers
would come infrequently. The proposal would not create any traffic, noise, or other
impacts beyond existing industrial park businesses.
Notification
Property owners within 350’ were notified of the SUP. No comments have been received.
Site Plan Review
Comprehensive Plan Classification
The 2030 Comprehensive Plan designates this area as Industrial.
Planning Commission Memorandum
Zoning Classification
The subject property is zoned I-1 (Industrial). Which allows the proposed use with a SUP.
Adjacent Zoning and Land U
Direction Existing Use Zoning Comp Plan
North Vacant I-I Industrial
East Vacant R-3 PRD Medium Density Res
South Vacant I-1 Industrial
West Vacant I-1 Industrial
Existing Condition
The 2.5 acre site is currently vacant land.
Building Setbacks
Setbacks in the City’s commercial and industrial districts are not prescribed by ordinance,
but are to be reviewed during the site plan review process. The proposed building setbacks
are between 20 and 37 feet from the property lines, staff finds these to be consistent with
area development.
Vehicular Access and Circulation
The site access is proposed with a driveway on the east side of the cull-de-sac for members
of the gated storage facility. The drive isles are proposed at 28 feet, except for the western
drive intended for business storage use and is 49 feet wide. These widths surpass our
minimum standards for typical parking lots and drive isles, as additional space is needed for
loading.
The Fire Marshal with the HFD has stated that they would not drive their fire trucks into
sites like this as it would be a hazard and of little benefit. They instead, would setup at the
entrance and enter on foot or around the perimeter. The applicant will provide the HFD
with gate access.
Parking
Parking is not required. There is space for vehicle unloading within the drive isles.
Architectural Standards
Architectural standards require 65% class 1&2 materials, with 25% being class 1 (brick,
stone, glass) for elevations visible from the street. The proposed building style includes
small wall areas and large amount of garage doors. The applicant’s mini-storage project on
Lightbourn Court last year was approved with 100% class 2 materials on the visible
elevations and no class 1. The normal 25% of class 1 on the front elevation was met.
The applicant proposes the same standards for this project with the addition of some
windows facing Spiral Blvd.
The class 2 materials used on the past and current projects are higher end metal siding with
hidden fasteners, rather than typical corrugated metal siding commonly found on pole
sheds. This material is not specifically listed in the zoning code architectural standards. The
architectural standards state the list of materials is not exhaustive and the Planning Director
has the discretion to allow substitutes of materials not listed.
Architectural standards material list
The applicant has included the following notes regarding the proposed finishes:
All color schemes and patterns will be the same/substantially the same as the last project.
All Doors - Mid-tone brown (same as last buildings)
Steel Above Doors - Mid-tone brown (same as last buildings)
Pillar Post Covers - Dark brown (same as last buildings)
Wainscot - Dark brown - 3' (or we may exceed minimum by possibly going to 4') along bottom of
building facings without doors - same as last buildings
Fastenerless Panels - Mid-tone brown (same as last buildings) will be either Edco panel -OR- FW 120
panel
Fastenered Panels - Mid-tone brown (same as last buildings)
Building fronts near Spiral Blvd (qty of 4) - 3' (or we exceed minimum by possibly going to 4') of
Nichiha Vintage brick panels with remainder finished with the Fastenerless Panels identified above -
also, we will plan to install a total of ( qty of 4) 2'8" wide x 8' high window facades across the fronts
facing Spiral Blvd.
Landscaping
Based on the site size and amount of pavement, the zoning ordinance requires the following
number of plantings:
Type Required Proposed Additional Required
Trees 37 35 2
Shrubs 34 26 8
Staff believes the landscaping meets the minimum ordinance requirements with the
additional units noted above. Additionally, the five Tina Crabapple trees are very dwarf
varieties with heights between 5-10 feet. They should be substituted unless the supplier can
verify their variety will be at least 10 feet in height.
Lighting
The proposed photometric plan shows light levels at the property lines to be below the limit
of one foot-candle adjacent to industrial and .5 foot-candle adjacent to residential to the
east. The lighting plan indicates downfacing LED wall lights operated by photocell switches.
Recommended Action:
Approval of the SUP and site plan, subject to the following conditions:
1) Conformance with the Planning Commission Staff Report and plans dated February 22,
2021.
2) All disturbed areas of the property shall be stabilized with rooting vegetative
cover to eliminate erosion problems.
3) Any uncompleted site work must be escrowed at 125 percent of the estimated
value prior to issuance of a certificate of occupancy.
4) The perimeter of the site must have erosion control, as approved by the City
Engineering Department.
5) The City Engineering Department must approve any required drainage plan.
6) Approval is subject to a one-year Sunset Clause; if significant progress is not
made towards construction of the proposal within one year of City Council
approval, the approvals are null and void.
7) As require by ordinance, if the approved use ceases for a period longer than one
year of City Council approval, the SUP approval is null and void.
8) Existing boulevard trees must be protected during construction.
9) In addition to the landscaping shown on the plan, two trees and eight shrubs
must be added to the site. The five proposed Tina Crabapple trees must be
substituted with larger varieties or provide reasonable assurances the proposed
varieties will reach at least 10 feet in height.
10) A right-of-way permit issued through the Hastings Public Works Department is
required for the street connection.
11) Future property owners are required to maintain the utility stubs that exist,
whether or not they are utilized.
Attachments:
• Aerial Photograph
• Photographs
• Elevation Drawings
• Site Plans
Spiral Blvd. Top soil stockpile recently removed
Applicants
recently
constructed
site
Spiral BLVD. Eastern property line about 25 feet from path
Proposed class two material by
MBCI