Loading...
HomeMy WebLinkAboutVIII-06 Authorize Preliminary Engineering Work – 2020 Infrastructure Improvements City Council Memorandum To: Mayor Fasbender & City Council Members From: Ryan Stempski – City Engineer Date: April 9, 2019 Item: Authorize Project Work – 2020 Neighborhood Infrastructure Improvements Council Action Requested: The Council is requested to authorize the Engineering Department to take up the required field data collection (surveying, pipe condition evaluation, and geotechnical investigation), design work, the preparation of a feasibility report, and an appraised benefits analysis for the 2020 Neighborhood Improvement Area. Background Information: The City’s Capital Street Improvement Plan calls for 15th Street from Tyler Street to Pine Street; 21st Street E and Commerce Drive; Cannon Street, 22nd Street W, 23rd Street W, 24th Street W and 25th Street W to be improved in 2020 as the City budget will allow. 15th Street and a portion of Cannon Street are on the State Aid System and subject to certain design standards to receive State Aid funding. The remainder of the streets are local and would receive a street improvement based on results of geotechnical evaluation and the need determined for the underground utility improvements. Funding through the Vermillion River Watershed has been secured in the amount of $184,600 to assist in water quality improvements along 21st Street E. A survey will need to be completed to begin design for these street segments. Water and sanitary sewer mains will need to be evaluated for their current pipe condition. A geotechnical investigation will have to be conducted to identify subsurface conditions in order to verify design assumptions and anticipate construction costs. An appraised benefits analysis will also need to be completed to prepare a preliminary assessment roll for the project. In order to initiate these improvements, the Council must direct the preparation of a feasibility report as required by the statutory process for public improvements that are specially assessed. Financial Impact: The costs for surveying, pipe condition assessment, appraised benefits analysis, and geotechnical investigation will be covered through reimbursement from bonded debt funds when bonds are issued for construction of the project in 2020. These services will need to be outsourced to consultants, therefore fee estimates will be obtained and managed within the overall project budget. Attachments: • 2020 Neighborhood Infrastructure Improvements Project Map • 2020-2024 Street CIP Map of Target Areas VIII-06 H i g h w a y 6 1 15th Street C a n n o n S t r e e t 21st Street E C o m m erc e D riv e Spiral Boulevard M i l l a r d A v e n u e 2 2 n d S t W 2 4 t h S t W P i n e S t r e e t T y l e r S t r e e t H ig h w a y 3 1 6 2020 Infrastructure ImprovementsProposed City Project 2020-1 VIII-06 Highway 55 15th Street P l e a s a n t D r i v e C a n n o n S t r e e t 21st Street E C o m m erc e D riv e R i v e r w o o d D r i v e H i g h w a y 6 1 5th Street W 13th Street W P a r k L a n e 4th Street W 1st Street W P r a i r i e S t r e e t S t a t e S t r e e t C o r y L a n e 37th Street Cari Park Ln Tierney Drive H i g h l a n d D r i v e Highway 316 Spiral Boulevard M a l c o l m A v e n u e Proposed 2020-2024 Street Improvement CIP 2024202020212023 2022 Exact dates and extents of construction subject to change Revised: April 10, 2019 2025 & Beyond VIII-06