HomeMy WebLinkAbout20180521 - VI-10 Change Order #1 - Riverfront Renaissance Phase 3.1 City Council Memorandum To: Mayor Hicks & City Council Members From: Nick Egger – Public Works Director Date: May 17, 2018 Item: Approve Change Order #1 for Riverfront Renaissance Phase 3.1 Improvements COUNCIL ACTION REQUESTED Council is requested to approve the attached change order to the contract for Phase 3.1 of the Riverfront Renaissance program. BACKGROUND INFORMATION The Change Order covers an adjustment to the size of an underground “trough” wherein mainline electrical feed lines have to reach between a transformer and the service connections. The size adjustment is necessary in light of updated information about the electrical feed necessary to serve the Meyer Company Building that was not known at the time of bidding the project. Also covered in this change order is the addition of an underground hand hole for wiring junctions, and a change to the door assembly on the eastern dumpster enclosure to provide four moderately sized doors instead of two, for more ease of operability by users of that enclosure. Sam Kessel of Bolton & Menk has provided elaboration on the various adjustments and added work items in the attached memo to help explain the background. FINANCIAL IMPACT The value of the items contemplated by Change Order #1 is a $7,736.46 increase to the total contract value, about a 1.52% increase. Below is a table summarizing to date the Change Orders to this contract. Riverfront Renaissance Phase 3 Change Order Summary Change Order Date Item Estimated Value 1 5/16/2018 Increased Size of Electrical Trough, Additional Hand Hole, & Dumpster Enclosure Door Reconfiguration. $7,736.46 Net Total Increase/(Decrease) to date $7,736.46 Original Contract Value $509,430 Change Orders as Percentage of Contract Value to date 1.52% STAFF RECOMMENDATION The change order will result in a small increase of the total contract value and construction costs, but the changes are necessary for proper functionality of the resulting infrastructure. Staff recommends that the Council approve Change Order #1. VI-10 H:\HAST\T18113249\7_Construction\A_Revisions\Change Order #1-2-3\CHANGE ORDER 1.docx CHANGE ORDER #1 Date: May 15, 2018 To: Nick Egger, City of Hastings From: Bolton & Menk, Sam Kessel Subject: Memorandum on Change Order #1 Items Riverfront Renaissance Improvements – Phase 3.1 City of Hastings, MN City Project Number: 2018-2 The following is a summary of the Change Order request and explanation of cause. Bolton & Menk has been coordinating with Bar Engineering and Global Specialty Contractors for the installation of the electrical service feeds on the Riverfront Renaissance Phase 3.1 Improvements. An additional electrical handhole and a precast electrical trough are requested to be added in response to the new service add for the Meyer Co. Building which is larger than the existing building loads originally designed for. With the increased service load request One aspect of this increased service load is an underground “trough” required by Xcel Energy. This increased load change and rerouting of service feeds, an additional handhole is required to be added to keep compliance with the NEC in terms of number of turns in the conduit. Design change requested by the City to modify the East dumpster enclosure doors from two large doors to four small doors in order to better accommodate business owner access from the alley side. This design change will come with an additional cost for the added doors and labor to install as noted in the below items. The following bid items are requested to be added to the construction contract due to items that were not foreseen at the time of bid. x 1-A – PRECAST ELECTRICAL TROUGH, Furnish and install complete x 1-B – PULL BOX 18x30, Furnish and install complete x 1-C – EAST DUMPSTER GATE ADDITION, Furnish and install complete VI-10 5/16/2018 VI-10