HomeMy WebLinkAboutHEDRA Agenda Notes 20120816HEDRA AGENDA NOTES FOR AUGUST 16, 2012 MINUTES Please see attached HEDRA Meeting minutes from the July 12, 2012 regular meeting for your review and approval. BILLS July Bills Stantec Consulting *$45,776.55 Hudson Manufacturing – Phase II Environmental     Liesch Associates $3,337.54 Hudson Manufacturing – Destructive Survey     Centerpoint Energy $71.22 Hudson Manufacturing – Heat     ADT Security $68.76 Hudson Manufacturing - Security     MN Pollution Control $62.50 Hudson Manufacturing – Volunteer Invest. Cleanup     Century Link $45.60 Hudson Manufacturing - Telephone      *Partial Reimbursable Expense Please see attached general ledger detail for further information. BUSINESS Public Hearing: Partial Demolition – Hudson Manufacturing – 200 West 2nd HEDRA is asked to hold a public hearing to consider partial demolition of the former H.D. Hudson Manufacturing Building located at 200 West 2nd Street. The non-historic 1974 addition, containing approximately 48,000 s.f. located along the northwest corner of the building is proposed for demolition. The remaining 100,000 s.f. building is not scheduled for demolition. Partial demolition of the facility is consistent with long term planning. The 2003 Heart of Hastings Plan, 2008 Hastings Comprehensive Plan, and 2011 Hudson Reuse Study all exclude the 1974 addition from future redevelopment\reuse plans for the site. The 1974 addition is constructed of concrete tip-up panels with no windows and limited exterior treatment. The large featureless walls of the addition are inconsistent with the historic downtown area. The location of the building only 50 feet from the Mississippi River restricts recreational use and serves as a trail constriction between neighboring Levee Park and Jaycees Park Notification of the meeting was published in the Hastings Star Gazette and mailed to all property owners within 350 feet of the site. The City has not received any comments regarding the demolition since notification of the public hearing. ACTION – Hold the public hearing and receive comment. Approve Plans and Specifications\Authorize Advertisement: Partial Demolition – Hudson Manufacturing – 200 West 2nd Street. HEDRA is asked to approve the attached plans and specifications and authorize advertisement for demolition of a portion of the Hudson Manufacturing Building located at 200 West 2nd Street. The 48,000 s.f. 1974 addition is proposed for removal. The remaining 100,000 s.f. building is not scheduled for demolition. In June, 2012 HEDRA awarded the contract to develop demolition plans and specifications to Short Elliot Hendrickson (SEH), Inc. The engineers estimate for demolition and site restoration is $316,265. HEDRA has received $250,000 in grant funds from the Dakota Community Development Agency for the project. HEDRA would be responsible for costs incurred above $250,000. In addition to grant funding, HEDRA allocated $250,000 from the Economic Development Fund Balance for demolition and environmental costs in the 2012 budget. The successful bidder would be responsible for completing demolition per the developed plans and specifications which include: Remove the 48,000 s.f. 1974 addition Remove adjacent parking lot south of addition Remove retaining walls and exterior features. Grade site to accommodate the 8-10 foot elevation drop between the parking lot and low floor elevation of the addition. Provide erosion control and turf restoration Provide asbestos and lead paint abatement, regulated waste removal and disposal. Upon approval by HEDRA, the project would proceed as follows: August 21st - 28th – Advertisement for bids September 11th – Bid Opening September 13th – Award contract at HEDRA meeting. October 1st – Start project November 15th – Complete project ACTION – Approve Plans and Specifications\Authorize Advertisement. Please see the attached Engineers Estimate and Site Plans further information. Review 2013 Budget and Levy A proposed outline of the 2013 budget has is attached for your review and comments. HEDRA is scheduled to take final action on the budget and levy at the September meeting. Please see the attached Budget Summary for more information. REPORTS Hudson Redevelopment Update Market Study Maxfield Research has begun work on the market study. The report will include a review of the suggested uses from the Hudson Reuse study completed last year. Maxfield will be contacting various business and community officials to gain further insight. Further information should be available at the September HEDRA meeting. The Market study is partially funded through a Dakota County CDA Grant. Environmental Review The Phase II Environmental Review has been completed by Stantec. Results are being incorporated into the Response Action Plan (RAP) for site cleanup. A preliminary draft of the RAP as well as estimated environmental cleanup costs should be available for the September HEDRA Meeting. The Phase II and RAP is partially funded through as Metropolitan Council Grant. Block 16 Parking Lot Bids for the Block 16 parking lot are due on August 13th. The City Council is tentatively scheduled to award the project on August 20th. Construction should take place later this year. ATTACHMENTS HEDRA Minutes – July 12, 2012 General Ledger Detail – July, 2012 Engineers Estimate – Hudson Demolition Site Plans – Hudson Demolition Proposed 2013 Budget and Levy