HomeMy WebLinkAbout20101220 - VI-02To: Honorable Mayor & City Council From: Nick Egger — City Engineer Date: December 14, 2010 Re: Change Order #4 — 2010 Infrastructure Improvements Council Action Requested: Attached for Council approval is Change Order 44 for the 2010 Infrastructure Improvements. This change order was assembled to account for several work items that required in -field changes with storm sewer system components and thus were either beyond the project scope or due to unforeseen circumstances. Also included is compensation to the contractor for providing additional finish grading associated with the replacement of failed base materials on parts of Westview Drive. Background Information: Please see the attached change order for further description of the work items. Financial Impact: Thus far, the estimated total impact of change orders on this project amount to a reduction of $3,967.10, or about 0.20% of the total contract value. 2010 Infrastructure Improvements Change Order Summary Change Order Date Items Estimated Value 1 6/11/2010 Substitution of Reclaimed Material for New Gravel - $39,120.00 2 7/26/2010 Mixture Design for Asphalt Emulsion $6,704.50 3 8/11/2010 Wiring & Conduit Size Changes $7,748.40 4 12/2/2010 In -Field Storm Sewer Modifications $20,700.00 Net Total Increase /Decrease - $3,967.10 Original Contract Value $1,915,445.39 Change Orders as Percentage of Contract Value -0.20% Attachments: Change Order #4 has been attached for reference. Crty of Hasty * S0i rourm street East 9 Hastinp. MN 55033-1955 • p.651 2354 + 1:651-4374082 0 1MMPMI.cLhawisnp, FIn.us 12/07/2010 10:30 6514366515 TOWER ASPHALT PAGE 02/03 CI'T'Y OF HASTINGS ENGINEERING DEPARTMENT CHANCE ORDER #4 Contractor; 1- 1ardrives, inc. City ProjectNo.: 2010 -1 Address: 14475 Q Ijram Drive S,A.P,'Nos. '130. 129 -016 & 130 -135 -003 Rogers, MN 55374 i Contract Name: 2010 infrastructure Improvements The City of Hastings and Hardrives. Inc. hereby agree to this change order to compensate for adjustments equired to install several storm sewer pipes and structures. Field Relocation of Storm Structure - The contractor was ordered to install a storm structure at a rev sed location on Westview Drive clue to a, conflict with an existing gas main. Field modification of the structure was also required to meet the grade requirements at the new location. The cost of the work is hereby agreed to be $8,67 4.60, and a new item in the account records will be created to compensate for this work. It will be described as: CH %NGE ORDER #4 — FIELD RELOCATION OF STORM STRUCTiJRE, Please see the table on the reverse -ide for further information, Field Modification of Storm Pipe Due to Utility Conflict — The contractor was required to remove a) existing stone; pipe that had a Comcast Utility cable bored through the pipe on Westview Drive. Payment s for the time, equipment and materials required to remove the pipe and to modify the location of the cable to allow for installation of the new storm pipe. The cost of the work is hereby agreed to be $4,136.00, and a new item in the account records will be created to compensate for this work, it will be described as: CHANGE ORDI1 t14 .. FIELD MODiF.ICATION Of STORM PIPE: DUE TO UTILITY CONFLICT. Please see the table on the reverse side for further information. I Field Modification of Storm Pipe and Structures Due to Sanitary Sewer Conflict, — The contractor was required to modify the grade of an installed pipe to avoid a conflict with an existing sanitary sewer main on estview Drive. Field modification of 2 structures was also .required to meet the revised pipe grade, The cost of the work is .hereby agreed to be 52,138,40, and a new item in the account records will be created to compensate for this work, It will be described as: CHANGE ORDER 44 — FIELD MODIFICATION OI" STORM PiPE AND STRUCI URFS DUE TO SANITARY SEWER CONFLICT. Please see the table on the reverse side for further information. 4, Repair of Existing Storm Sewer Pipe — 'I1le contractor was requested to repair an existing sLorn sewer pipe on Westview Drive that had become misaligned and bad subsequently caused a sink hole in the existin street adjacent to the project limits. Payment is for the time, equipment and materials required to make the necess try repairs. The cost of the work is hereby agreed to be $3,869.50,. and a new item in the account records w' 1 be created to compensate for this work. it will be described as: CHANGE ORDER #4 — REPAIR OF EXISTING STORM SEWER PIPE, Please see the table on the reverse side for further information. f Finish Grading of Westview Drive — The contractor was required to apply additional finish gra material on Westvicw Drive due to the corrective actions taken on portions of the emulsified rec Payment is for the time and equipment .required to perfornn the necessary fi.nish grading. The co hereby agreed to be $1,881.50, and a new item in the account records will be created to compensate will be described as: CHANGE ORDER 44 — ADDITIONAL FINIS" GRADING OF WFS .Please see the table on the ,reverse side for further information. ling to the base laimed material, t of the work is for this work. it V1EW DRIVE, 12/07/2010 10:30 6514366515 TOWER ASPHALT PAGE 03/03 The unit Prices for the new Items are as follows; ESTI VIATED ITIE M ESTIMATED TOTAL NO. DESCRIPTION UNIT QVANTIITY UNIT PRICE CH NGE CHANGE ORDER 44 — 112 FIELD RELOCATION OF I,,S 1 58.674.60 $8A74.60 STORM STRUCTURE CHANGE ORDER 94 .- F1ELD MODIFICATION OF 1 13 STORM PIPE DUE TO LS I $4,13(1.00 $4, 36.00 UTIL CONFLICT CHANGE ORDER 04 — FIELD MODIFICATION OF STORM PIPE AND 114 STRUCTURES DUE, TO LS 1 $2.138.40 $2. 38.40 SANITARY SEWER C CHANGE ORDER #4 — 1 15 REPAIR OF EXISTING l.,S 1 $3.869,50 $3.1 69,50 STORM SEWER PIPE, ADDITIONAL FINISH 116 GRAT)MG OF WESTVIEW LS 1 $1ssl,so $1.1 $1,50 DRIVE TOTAL: $20, 700.00