HomeMy WebLinkAbout4 2301 Oak St Site Plan Memo To: Planning Commissioners From: Kari Barker, Associate Planner Date: March 24, 2008 SubjectGarage – :Site Plan #2008-06 –2301 Oak St. REQUEST Scott Bennis, applicant, seeks Site Plan approval to construct a 22’ x 44’ (968 square feet) garage at 2301 Oak Street, a nine-unit apartment building. BACKGROUND INFORMATION Comprehensive Plan Classification The 2020 Comprehensive Plan designates the portion of the property the garage will be built on as R-3 Medium High Density Residential, R-3. Zoning Classification The subject property is zoned R-3, Medium High Density Residential. Garages are a permitted use in the R-3 district. Adjacent Zoning and Land Use Direction Existing Use Zoning Comp Plan North Residential R-2 – Residential U-I Urban Res (1-3 units/acre) East Residential R-2 – Residential U-I Urban Res (1-3 units/acre) South Auto repair A-Agriculture Floodway West Multi-family R-3 – Med. High Density U-I Urban Res (1-3 units/acre) Existing Condition The proposed garage site is located on land directly north of an existing parking lot and west of the existing apartment building. The garage will be located in front of four existing windows six feet from the building Proposed Condition The applicant is proposing construction of a 22’x 44’ (968 square feet) garage north of the parking lot and west of the apartment building. The garage will be double sided with two garages fronting Forest Street and two garages fronting the existing parking lot. SITE PLAN REVIEW Zoning Setbacks The garage must be set back twenty feet from the property line on Forest Street and ten feet from the property line on Oak Street. Per the International Building Code (IBC,) the distance between the apartment building and garage must be ten feet apart unless appropriate fire separation material is used. As the applicant is proposing the garage to be six feet from the building, appropriate fire separation material must be used. Parking A net of two parking spaces will result from the garage construction. Vehicular Access and Circulation Two garage stalls will be accessed via the existing parking lot. The other two garage stalls will be accessed via a new driveway off of Forest Street. The City Engineer has approved the new driveway due to Forest Street being a low volume street and the small amount of cars that will be utilizing the new driveway. Pedestrian Access and Circulation Pedestrian access will not be changed. Grading, Drainage, Erosion Control, and Utility Plan As a conditional of approval, the Public Works Director and City Engineer must provide final approval of the grading, drainage and utility plans. Landscaping Two large silver maple trees will be affected by the construction of the garage, though not removed. As a result, a tree preservation plan approved by the City Forester must be provided for these two trees. In addition, it will be necessary to trim the branches of the silver maple four feet west of the garage. As a condition of approval, a certified arborist must trim this tree. Architectural Elevations The architectural standards of the zoning ordinance require a combination of acceptable materials based on the buildings use. The administrative official and Planning Commission have the discretion to approve alternate materials. Generally, accessory buildings that are not highly visible are not required to meet these requirements. The elevation drawings of these types of accessory buildings must be compatible with the main structure. Eight inch pine grooved vertical siding and brown shingles are proposed. The specific materials proposed for the garage are acceptable and, although not the same, are compatible with the exterior of the existing building. RECOMMENDATION Approval of the site plan is recommended subject to the following conditions: 1) Conformance with the plans submitted with the Planning Commission Staff Report dated March 24, 2008. 2) All disturbed areas on this property shall be stabilized with rooting vegetative cover to eliminate erosion problems. 3) Final approval of the grading, drainage and utility plans by the Public Works Director and City Engineer, and reimbursement for any fees incurred in review of the development. The owner assumes all risks associated with the grading and utility placement prior to formal approvals. 4) Any uncompleted site work (including landscaping) must be escrowed for prior to issuance of a certificate of occupancy. 5) Approval is subject to a one year Sunset Clause; if significant progress is not made towards construction of the proposal within one year of City Council approval, the approval is null and void. 6) The garage must be set back 20 feet from the property line on Forest Street and 10 feet from the property line on Oak Street. 7) The driveway for each of the garages must be paved. 8) Appropriate fire separation material must be utilized as the garage is less than 10 feet from the apartment building. 9) A tree preservation plan approved by the City Forester must be provided for the two silver maple trees near the construction site. 10) A certified arborist must trim the silver maple tree that is located four feet west of the garage. ATTACHMENTS Location Map Aerial Map Site Plans Photograph of similar garage materials Application