HomeMy WebLinkAbout20100907 - VI-14Council Action Requested: Enclosed for Council approval is Change Order 46 for the Industrial Park Area Improvements project. Background Information: MnDOT State Aid standards entitle the contractor to claim adjustments to bid price amounts for certain items within the period that the base fuel cost index is above the normal range. Financial Impact: The impact of the fuel escalation adjustment on the project as a whole is an aggregate increase in value to qualifying bid items of $984.42. In total, the value of all change orders for the project is $3,628.76, which is about 0.16% of the total contract value. In addition, the total cost of the work performed by the contractor is currently well below the original contract value due to construction item quantities being lower than estimated, and the in -field innovation of City staff and the contractor to get a more economical end - product while maintaining project goals. Staff anticipates that the final payment to the contractor will be put before the Council yet this fall, after all punch list items have been resolved. 2009 Industrial Park Area Improvements Change Order Summary Change Order Date Items Value I 9/16/2009 Lighting, Ravine Materials - $6,473.04 2 11/9/2009 Storm Sewer, Lighting Components $10,192.93 3 12/17/2009 Trail Paving, Traffic Markings - $2,452.50 4 1/13/2010 Tree Stump Removal $440.00 5 7/9/2010 Asphalt Density Incentive $936.95 6 8/26/2010 Fuel Escalation $984.42 Net Total of Change Orders $3,628.76 Original Contract Value $2,229,790.98 Change Orders as Percentage of Contract Value 0.16% Current Total Value of Work Completed Includes Change Orders $2,024,654.45 Current Amount Below Original Contract $205,136.53 Current Percentage Below Original Contract 9.2% Attachments: Change Order 46 has been attached for reference. ° 1 �y ryl` r` RMR° v 4 ' 11CI°L Fotet!h " Ueek Ems[. + �'°�+.�P , !.'+"`� °°.` °��.J:�v$ °.�..�P °��* *.. ��.���F,.� •.�?fr.�.�e�{ �� �""4:��'F..� �.�`f "..'��� °°' �`� °:.A����s ��'S�'r°� I!1`@�.�:���u. To: Honorable Mayor and City Council From: Nick Egger — City Engineer Date: August 30, 2010 Re: Change Order *6 for Industrial Park Area Improvements CITY OF HASTINGS ENGINEERING DEPARTMENT CHANGE ORDER #6 Contractor: Northwest Asphalt, Inc. City Project No.: 2009 -1 Address: 145 t Stagecoach Road Shakopee, MN 55379 Contract Name: Industrial Park Area Improvements The City of Hastings and Northwest Asphalt, Inc. hereby agree to this change order to provide compensation for fuel escalation costs per State Aid requirements. Fuel Escalation State Aid projects are required to provide for compensation adjustments in the cost of motor fuel (diesel and gasoline) per the Minnesota Department of Transportation Standard Specifications for Construction. The contractor has provided fuel escalation worksheets which tabulate this adjustment. Refer to the tables attached for further information. A total net compensation of $984.42 is due the contractor. ITEM TOTAL NO. DESCRIPTION UNIT QUANTITY UNIT PRICE CHANGE FUEL ESCALATION NEW COMPENSATION LS 1 $984.42 $984.42 ESTIMATED CHANGE IN TOTAL CONTRACT AMOUNT $984.42 Approved By: •� Accepted By: City En i eer Northwest Asphalt, Inc. Authori` - d° epresentative Date: V, �Zb<® Date: 8 (�, y /t u ASP ALT 111410. 1 1ORTHWEST ASPHALT, INC. "Paving, Excavation and Utilities" 1451 STAGE COACH'ROAD RAI HASTINGS, MN 55Oi33 SHAKOPEE, MN 55379-2797 PHONE (952) 445-1003 FAX (952) 445-1056 wwwnwasphaitnet I 5-4110 DATE CUST * -- F - � 1 1. NWA REF NWA J06 # REQUE� GENERAL CONTR PRO, 7 /3011 97 1 EL 9722 30 9 SAP 130-140-001 January 28, 2009 (1 10) FUEL ESCALATION CLAUSE The provisions set forth In Mn/DOT 1910 are hereby deleted, and the following is substituted therefore These provisions provide for compensation adjustments in the cost of motor fuels (diesel and gasoline) consumed in prosecuting the Contract work, The Engineer will calculate the Fuel Cost Adjustments. Payments or credits will be applied to partial and final payments for work items set forth herein. For this purpose, the Department will establish a Base Fuel Index (BFI) for fuel to be used on the Project, The Base Fuel Index will be the average of die high and low rack prices shown for No. 2 ultra low sulfur fuel oil in the "OPIS Energy Group"' tabulation titled "RackFax, Minneapolis, MN, OPI S Direct Gross No, 2 Distillate Fuels" for the d4q of the Contract letting, A Current Fuel Index (CFI) in cents per gallon will be established for each month. The CFI will be die average of the high and low rack prices shown for No. 2 ultra low su fia fuel oil in the "CPI S Energy Group" tabulation titled "Rack Fax, Minneapolis, MN, CPI S Direct Gross No. 2 Distillate Fuels" averaged for the beginning and ending dates of the monthly period being adjusted. The Engineer will compute the ratio of the Current Fuel Index to the Base Fuel Index (CFI/BFI) each month. If that ratio falls between 0.85 and 1.15, no fuel adjustment will be made that month. If the ratio is less than 0. 85, a credit to the Department will be computed. If the ratio is greater than I , 1 -5. additional payment to the Contractor will be computed. Credit or additional payment will be computed as follows. ( The Engineer Will estimate the quantity of work done in that month - under each of the Contract items listed below. (2) The Engineer will compute the gallons of fuel used in that month for each of the Contract items listed below by applying the unit fuel usage factors shown. (3) The Engineer will surnmarize the total gallons (Q) of fuel used in that month for the applicable items. (4) The Engineer will determine the Fuel Cost Adjustment (FCA) from the following formulas: If the Current Fuel Index (CFI) is greater than the Base Fuel Index (BFI), the following formula shall be used to determine the amount of Fuel Cost Adjustment to be paid to the Contractor. FCA = [(CFLIBFf) — 1. 15 x Q x BFI If the Current Fuel Index (CFI) is less than the Base Fuel Index (BFI), the following formula shall be used to determine the amount of Fuel Cost Adjustment to be credited to the DeRqr=ent, Pagel of January 28, 2009 Where FCA Fuel Cost Adjustment (cents) CFl = Cur Fuel Index (cents per gallon) BFI Base Fuel Index (cents per gallon) Q Monthly total gallons of fuel Basis of PaLnient A Fuel Cost Adjustment payment to the Contractor will be made as a lump sum each payment period based on the last published CFI. A Fuel Cost Adjustment credit to the Department will be deducted as a lump sum each payment period from any monies due the Contractor. Upon completion of the work under the Contract, any difference between the estimated quantities previously paid and the final quantities will be determined. The CFl in effect on the day of completion of the Contract will be applied to the quantity differences in accordance with the procedures set forth above_ Schedule of Work Items (Only items shown will be considered for compensation adjustments,) Page 2 of 3 Item unit Gallons of Fuel TVA Unit Unit Gallons of Fuel per Unit (1) Earthwork: 2105 501 Common Excavation Cu, Yd 0.17 in 3 0.22 2105,503 Rock Excavation Cu. Yd 0.27 in 3 035 2105-505 Muck Excavation Cu. Yd 0.17 in 3 0,22 2105.5017 Subgrade Excavation Cu. Yd 0,17 in 3 0.22 2105.5 15 Unclassified Excavation Cu, Yd 0,23 1113 0.30 2105.521 Granular Borrow (E V) Cu. Yd 0,17 m 3 0,22 Granular Borrow (CV) Cu. Yd 0,19 M3 0,25 Granular Borrow (LV) Cu. Yd 0.14 Ina 0,15 2105.522 Select Granular Borrow (Ey) Cu. Yd 0,17 in 3 0,22 Select Granular Borrow (CV) Cu. Yd 0,19 111 0,25 Select Granular Borrow (LV) Cu. Yd 17.14 111 0.18 2105.523 Common Borrow (EV) Cu. Yd 0.17 in 3 022 Common Borrow (CV) Cu. Yd 0.19 111 0.25 Common Borrow (LV) Cu. Yd 0.14 in 3 0.1 s 2105,535 Topsoil Borrow (E V) Cu. Yd 0,1'7 In 0.22 Topsoil Borrow (CV) Cu, Yd 0.19 m 3 0.25 Topsoil Borrow (LY) Cu. Yd 0.14 111 0,18 2106.607 Common Embankment (CV) Cu. Yd 0.19 m 3 0,25 2106.607 Granular Embankment (CV) Cu. Yd 0.19 in 3 0,25 2106.607 Select Granular Embankment(CV) Cu. Yd 019 in 3 0.25 2106,607 Select Granular Embankment Modified Cu. Yd 0.19 In 3 0.25 (CV) 2106.607 Excavation — Rock Cu. Yd 0,27 In 3 0,35 2106.607 Excavation — Muck Cu. Yd 0,17 In 3 0.22 Page 2 of 3 January 28, 2009 t thickness (in inches or rum) NL �QT l?: No price adjustments will be niadc on fuel used for dning and heating aggregates. *** No price adjustment will be made for pipes less than 12" in diameter or jacked pipes, item Unit Gallons of Fuel per Unit Unit Gallons of Fuel per Uitit (2) Aggregate Base: 221L501 Aggregate Base Ton 0J5 t 0.61 221 .502 Aggregate Base (LV) Cu. Yd 0.77 in 3 1.01 2211.503 Aggregate Base (CV) Cu. Yd 099 111 1,29 221 1.607 Open Graded Aggregate Base (CV) Cu. Yd 0.99 in 3 1,29 (3) Aggregate Shouldering: 2221.501 Aggregate Shouldering Ton 0.55 t 0,61 222 1.50 Aggregate Shouldering (LV) 0 Cu. Yd 11.77 in 3 1.01 2221,503 Aggregate Shouldering (CV) Cu. Yd 099 rn 3 1.29 (4) Concrete Pavements: 2301,511 Structural Concrete Cu. Yd 0,98 in 3 L28 2301.513 Structural Concrete HE Cu. Yd 0.98 in 3 1.28 2301 .604 Structural Concrete Sq. Yd- 0.027*t in' 0.00128*t (5) Bituminous Pavemcnts: 2350,501 Type ( ) Wearing Course Mixture Ton 0,90 t 0:99 2350.502 Type ( ) Non-Wearing Course Mixture Ton 0.90 t 0.99 2350 503 Type ( ) ( ) Course ( (t)" 'Mick Sq. Yd 0.05 I*t 2350.503 Type ( ) ( ) Course ( (t) nim, Thick 111 0, 0024 *t 2360.501 Type SP ( ) Wearing Course Mixture Ton 0.90 t 0.99 2360002 Type SP ( ) Non-Wearing Course Mixture ( , ) Ton 0.90 It 099 2360.503 Type SP ( ) ( ) Course ( (t)" thick Sq, Yd 11.05 1 *t 2360,50 Type SP ( ) ( ) Course ( (t) nim thick In '2 0.0024*t (6) Pipe: *** 2501,511 Pipe Culvert Lin. Ft. 0.70 m 2,30 2501 52I Pipe Arch Culvert - Lin. Ft. 0,70 m 2.30 250L561 Pipe Culvert Des 3006 Lin. Ft. 030 in 2.30 2501.603 Pipe Culvert Lin. Ft. 0.70 in 230 2503.511 Pipe Sewer Lin. Ft. 0.70 in 2.30 2503-521 Pipe Arch SCNVCT Lin. Ft, 0.70 in 2,30 2503,541 Pipe Sewer Des 3006 Lin. Ft. 0.70 M 2.30 2501603 Pipe Sewer Lin. Ft. 0.70 in 2.30 t thickness (in inches or rum) NL �QT l?: No price adjustments will be niadc on fuel used for dning and heating aggregates. *** No price adjustment will be made for pipes less than 12" in diameter or jacked pipes, x �; I m "X) M LD co (N t, " �D ��! to co u) CNA (D (b 0 Colo E CN (V: CNJN I- 4�6: c 0, N n cr;p "Z' " c cq L6 m ; LO cr) v 0) 6 a Q 0) 10) 0) � to 0 ic�A CO 0 C NICN C 7 q LO LO M co NZr CID . ...... i cD M j(b N M � M LO C6 m 0) (N Ica i 03 -M CID U) m wl 1 0 N CO Cli iN co, IN cs �C) co V) C� GO m 0 N �t CC � (N�N "'T C 04 0 4�� V� (P WA 0' (0 co f I 1 0 M M - m 0 ,w (D m v M m u') 0) a) !CD (D co 0 cb C) 00 M, 0 N, ( !N C\1 0 01 00 -^'b E 1 20) 0) M CO CO iff) M C) � U') iw co Ig 0 p) C m D 0 cq to 10 ) 1 ry P i (N icD 0) m � (N M a) M �S- M , �,4 - CO3 6 0)>m i : c6 cq �o a) ! , Q0 w 0 �..,m...:..�...�:...��� CD Cl) m CA �Ola M r-_ to Go 0) t 00 IV) (D cp �Z6 0) 1 r-- M Cti — ui �Ii! M;m!M v � � 3 0 0 I j a, C> CN i(N (N C) a) ( i 0 C) 0 (N i CN CA � i ( C^»d 810:6 t N CN CN I C) (N cc, [co m cj I ODIU-)IM 7, (P 0 M 0 �2 M! Lr � q co 0) w m! M CO W LO co F O r- r- (a 1 (0 , CO (0! w m OD 06 co � , 6 6 F- 1 0) 00) I m Go Go 0 C) CO'CIN -I T OD! ca m (D m M n ju 0 �(D LO 00 �D (0 M aj 1.$5 r "It co i 6 f- CN co 06 �T d) M; o MM m V) ico 0) 0) m m (D co CO co (6 OD W 0) co I m L m U co n 0^ C),001M 1 7 00 4N ( ' 4 1 433 U) M - m co ' 1 f- CD 0 C%4 0 0 I 0) �m I n : i Ln i U Ln S I-- C) r (0 00 M 00 M J im m m � cq LO, �,C,2 ' o (P a) ca IN C C? IN i r- IT u? -14: • {T5 x V , 'T Ln Ul) 10 U'� U) Ln M O Ln V) 0 LO 0 LO 6 to N Ti LO U) V! m I IT m V) LO a) 4X3 Q M fi so Cb C14 C) CCU co ;CN F C? U) 0) ff) (N 00 C°°7 0) C) L6 1 n 6 ` LO LO -q A u 00 OD 0) to LO LO cc LO 1 4 - Ln v 'oo U- rl - U� co, 14? cq Lo!'T "T 0) m P'I 0 co, [--d 00 1- - M u.41 ( Ti td4 M LO tr) CA m I- i N LO 00 m (D W LL m m Go q co LO Ln C:� M, 0): co 6 4 O co N,N CON m 11�2 6 (°) LD i6 CN 0 (1� (N I N m �m 0) 1 CD !Ln "61 - 1 M LO !OD m (0 LO LO to U') v iN, (f) a) C) �T N N 0: 0 C1j cq CO C CI-4 M m FL r I I 0 t) l r Cw C-4 na �Co e6 5 v' s i s i '' C� N s r-s C3 C'd Ls C) (N -€ 0 C'4 C;T N , ('I C+d' ; r-- 7 C) Cad +C'd C*.! (N i s (N 0 i — cli N �- I �C4 Cd (N (N , r� ra j L C�k C•`d C'J u (N 3 - CN (N LO t _ t C;3 Cds �. CCk CB1 N C'";r '. CD !LE 1 � CC,4D 'p I11111 a r Q 1 s co 7 E E C', ; L, 5 5 + 3 6 I1 ;fib 1 0 r ` y f. f �• m 'nt m � a a G y !_._.. � 0 C"7 ..�.�. --° !CN C N ' C (N . lC5 'C r� CAB C - C7 C^J C`d C`*k N N "'- •�'•- CN C'W S�CCr " C J C"d eLn 14 C;I � [ J N 1 (D Tr C'd C''-0 N ' (N '" N r CN CAE C'4 „. Lis . c 0 [ m �r " Cad m rs;vta ai°� t J ,M �� � Cx U) "t C C3 r f 44- I ; rw- ; C'�2 S� I m - I r e C i C"+d M � ! f>N°, (s�°3 �� CJ LO CN N N � -. ice#,N 1 N C CD � � N N (N N C I I C5�iC37 rCs mI C'4 04 N ,q C`sd C4 (Ij 'T, (N C� �I�� ( (C" �i I L. � C`W I C',3 j N wx« r CFY WS 1 CN f� � C.:1 0) Lp FN F4 0 . 4 Y CN M 00 'x""` �" C'�d ; ..._I 7 ,.' �" Ca 4 v .^. r^" ' C ti d CN z� r r N -,T CC} 04 i C�a u a : � L6` t 04 :C' N ( N ...... - "�' d N DLO I v^- � a) a 1- 1 � t {C3 CN Cat f N ( I CIA 4°+� � � � i ! N N � � � (N `04 N[" Cq s, I 04 N i , 4 , N! C 'IT ^ 'IT N C'3i { N N Cd � N � ( �. �.,,,. „ I -'. ' N. N LL cn 0 (D Ca CA T, 0 4 � f r � I a " C' ra 0) CO t'_5k II t ( f',S7 C6 C3' C7�' CO 4D c) 1 U) co r-- � is 0 Lo L'". C� ( Cad � t 6 `a'^` tv s C�3 � C t G N i �� f M N N C6 r r`^ C.� � ( j 4 i � � 0 Ca , cu U �rq co � j,` �`t'' s4 Lo �� N (N CA � CV N Cq N �tC� Cr C� �� N:� I � fi i (CD t r- co q° >.a �` r I v� l �e^ C S C R4 E Ni'm 0 (N CN v C's6 Lo' (6,r- GJ Cl C& co Cd,C9 a L C5 7/712009 2009 Fuel Escalation Worksheet - .85 to NOTE: 1,15) X Q X t FCA = Fuel Cost Adjustment CFI = Current Fuel Index BFI = Base Fuel Index Q = Monthly total gallons of fuel W �J ? ) , , " "fl - 'I . . .... . . t , �,l - - - --- --- --- ­ � Month CFI BFI , 4 .......... 1. 15 Ratio Item Gal. of Fuel Quantity of Gal. of Fuel I I Unit I Per Unit I Material Me I Per Material 2105,501 Common Excavation Cu Yd 0.17 5449 926.33 2105.503 Rock Excavation Cu Yd 0.27 0.00 2105.505 Muck Excavation Cu Yd 0.17 0.00 211 .507 Subgrade Excavation Cu Yd 9A7 49 8.33 2107.515 Unclassified Excavation Cu 'Yd 023 0,00 2103.521 Granular Borrow (EV) Cu Yd 0.17 0.00 2104.521 Granular Borrow (CV) Cu Yd 0.19 0.00 2105.521 Granular Borrow (L V) Cu Yd 0.14 0.00 2105,522 Select Granular Borrow (EV) 'Cu Yd 0.17 0.00 2105.522 Select Granular Borrow (CV) Cu Yd 0.19 0.00 2105.522 Select Granular Borrow (LV) Cu Yd 0.14 0.00 2105.523 Common Borrow (EV) Cu Yd 0,17 0.00 2105.523 Common Borrow (CV) Cu Yd 0,19 0.00 2105,523 Common Borrow (LV) Cu Yd 0.14 0.00 2105.535 Topsoil Borrow (E\/) Cu Yd 0.17 0.00 2105,535 Topsoil Borrow (CY) Cu Yd 0.19 O,00 2105.535 Topsoil Borrow (LV) Cu Yd 0.14 2730 382.20 2105.607 Topsoil Embankment (CV) Cu Yd 0.19 0.010 2105.607 Common Embankment (C\/) Cu Yd 0.19 0.00 2105.607 Granular Embankment (CV) Cu Yd 0.19 0.00 2105,607 Select Granular Embankment (CV) Cu Yd 0.19 0,00 2105.607 Select Granular Embankment MOD (CV) Cu Yd 0,19 0.00 Aggregate Base 2211.501 Aggregate Base Ton 0.55 2517 1384-35 2211.502 Aggregate Base LV Cu Yd 0.77 0.00 221 ,503 Aggregate Base CV Cu Yd 0,99 0.00 221 607 2ken Graded Aggregate Base (CV) Cu Yd 0 99 0.00 Aggregate Shouldering 12221,501 Aggregate Shouldering Ton 55 0,00 2,221.502 Aggregate Shouldering LV Cu Yd 0.77 OLOO 2221:.503 Aggregate Shouldering CV Cu Yd 0,99 0,00 I Concrete Pavements 2661,511 2391 Structural Concrete Structural Concrete HE Cu Yd: C,u Yd 0.98 0.98 0,00 0.00 Bituminous Pavements 2350.50 2350.502 Type ( ) Wearing Course Mixture Type ( ) Non Wear Course Mixture Ton Ton 0.90 0,90 97 6414 87.30 5772.60 2350.503 Type ( ) ( ) Course Mixture q. d." t = 0,051 5089 1167,93 4.5 2;760.561 Type ( ) Wearing Course Mixture 0.90 0.00 - T - on 2366,562 Type ( ) Non Wear Course Mixture Ton 0.90 0.00 2361}L50 -- ­ _e_(J ( ) Course _ 1,yjp Mixture Sq.Yd." t= � 0051 0.00 NU 9 : NO pace adjustments will tae made on t el used to drying and heating aggregates. Only items shown will be considered for compensation adjustments. = No price adjustments will be made for pipes less than 12`° in diameter or jacked pipes t = thickness in inches Pipe 2501 ,511 Pipe Culvert Lin. Ft. 0,700 0.00 2501.521 !Pipe Arch Culvert Lin. Ff., 5300 95 67.20 2501.551 Pipe Culvert Des 3006 Lin. Ft. 0.700 . o 2501M5 1 Pipe Culvert Lin. Ft. 0.700 0.00 2501,511 Pipe Sewer Line Ft. 0.740 45 31.50 2501.521 Pipe arch Sewer Lire, Ft. 4,700 4.40 2541.541 Pipe Sewer Des 3005 Lin. fit. 0.714 X1,4 251 1.643 Pipe Sewer Lin, Ft. 4.744 4.00 =' 9827.74 NU 9 : NO pace adjustments will tae made on t el used to drying and heating aggregates. Only items shown will be considered for compensation adjustments. = No price adjustments will be made for pipes less than 12`° in diameter or jacked pipes t = thickness in inches 7T712009 2009 Fuel Escalation Worksheet - .85 to ® 15 Ratio NOTE FCA = ((CFIIBFl) - 1,15) X 0 X BF] RATIO 1.22 FCA = Fuel Cost Adjustment Month November CFl = Current Fuel Ind x CF1 = $211.63 BFI = Base Fuel lndex BFI = $17104 Q = Monthly total gallons Of fuel 0 = 3720.51 . .. . ..... . .... . .... FCA $470.05 CREDIT It Ga1.ofFue Quantityof 'Gal. cif uel Unit Per Unit Material Moved 1 Per Material Earthwork 2105.501 Common Excavation Cu Yd 0.17 2698 4-58 656 2105,503 Rock Excavation Cu Yd 027 100 27.00 2105.505 Muck Excavation Cu Yd 0.17 0.00 2106.507 Subgrade Excavation Cu Yd 0A7 0,00 2107.515 Unclassified Excavation Cu Yd 0,23 0,00 2103.521 Granular Borrow (EV) Cu Yd 0A7 0 00 2104.521 Giranular Borrow (CV) Cu Yd 0.19 0.00 2105.521 Granular Borrow (LV) Cu Yd 0.14 0.00 2105.522 Select Granular Borrow (EV) Cu Yd 0.17 0.00 2105.522 Select Granular Borrow (CV) Cu Yd 0. 19 0,00 2105.522 Select Granular Borrow (LV) Cu Yd 0A4 0.00 2105.523 Common Borrow (EV) Cu Yd 0.17 0.00 2105.523 Common Borrow (CV) Cu Yd 0.19 0.00 2105.523 Common Borrow (LV) Cu Yd 0.14 0.00 2105.535 Topsoil Borrow (EV) Cu Yd 0.17 0.00 2105.535 Topsoil Borrow (CV) Cu Yd 0,19 0.00 2105.535 Topsoil Borrow (LV) Cu Yd 0.14 0.00 1 2105.607 Topsoil Embankment (CV) Cu Yd 019 0,00 2105.607 Common Embankment (CV) Cu Yd 0,19 0.00 2105.607 Granular Embankment (CV) C'u Yd 0A9 0 00 2105,607 Select Granular Embankment (CV) Cu Yd 0.19 0.00 2105.607 Select Granular Embankment Cu Yd 0.19 0.00 Aggregate Base 2211.501 Aggregate Base Ton 0.55 457 251: .35 2211.502 Aggregate Base LV Cu Yd 0.77 0,00 2211.503 ;Aggregate Base CV Cu Yd 0 99 0.00 1 2211.607 Open Graded A 1 ��r�a�teBas�e(C\o Cu Yd 0.99 0.00 Aggregate Shouldering 2221.501 Aggregate Shouldering Ton 0,55 0.00 2221 .502 Aggregate Shouldering LV Cu Yd 0.77 0,00 2221,503 Aggregate Shouldering CV Cu Yd 0,99 om Concrete Pavements 230'1.511 Structural Concrete Cu Yd 0,98 0,00 2301 .513 Structural Concrete HE Cu Yd 0.98 0.00 Bituminous Pavements 2350.501 Type ( ) Wearing Course Mixture Ton 0.90 3315 2983.50 2350.502 Type ( ) Non Wear Course Mixture Ton 0,90 0.00 2350.503 Type ( ) ( ) Course Mixtur q,Yd." t = 0.051 0.00 4.5 2360.501 Type ( ) Wearing Course Mixture 0.90 0.00 Ton 2360,502 Type ( ) Non Wear Course Mixture Ton 0 90 0,00 2360.503 Type __(__) _C__ )-.Course Mixture So.Yd." t = n M1 n1no I r U I L: NO price adjustments wiii be made on fuel used for drying and heating aggregates. Only items shown will be considered for compensation adjustments. = No price adjustments will be made for pipes less than 12" in diameter or jacked pipes t thickness in inches Pipe 2501,511 Pipe Culvert Lavin. Ft. O 700 0.00 2501 .521, Pipe Arch Culvert Lin. Ft. 0.700 0.00 2501.561 Pipe Culvert Des 3006 Lin. Ft. 0.700 Mo 2501.60 Pipe Culvert Lin, Ft, 0,700 0.00 2501.511 Pipe Sewer Lin, Ft, 0Y00 0.00 2501 .521 Pipe Arch Sewer Lin, Ft. 0.700 0.00 2501.5x41 Pipe Sewer Des 3006 Lin, Ft, 0,700 OM 2501.603 Pipe Sewer Lin. Ft, 0.700 0.00 r U I L: NO price adjustments wiii be made on fuel used for drying and heating aggregates. Only items shown will be considered for compensation adjustments. = No price adjustments will be made for pipes less than 12" in diameter or jacked pipes t thickness in inches 717, 2009 Fuel Escalation Worksheet - .85 to 1. 15 Ratio NOTE F = ((C Fl/ BFI) - 1.15) X 0 X BFI RATIO 1.20 FCA = Fuel Cost Adjustment Month Jan CFl = Current Fuel lade x CFl = $207.1 BFI = Base Fuel Index BFI = $173.04 Q Monthly total gallons of fuel Q 912.56 FCA $74M CREDIT Item Gal. of Fuel Quantity of Gal. of Fuel Unit Per Unit Material over Per Material Earthwork 2105.501 Common Excavation Cu Yd 0.17 0.00 2105.503 Rock Excavation Cu Yd 0.27 0.00 2105,505 Muck Excavation Cu Yd 0.17 0.00 2106.507 Subgrade Excavation Cu Yd 0.17 0.00 2107.515 Unclassified Excavation Cu Yd 0.23 0.00 2103.521 Granular Borrow (EV) Cu Yd 0.17 0.00 2104.521 Granular Borrow (CV) Cu Yd 0.19 0.00 Granular Borrow (LV) Cu Yd 0.14 0,00 2105.522 Select Granular Borrow (EV) Cu Yd 0.17 0.00 2105 522 Select Granular Borrow (CV) Cu Yd 0.19 0,00 2105.522 Select Granular Borrow (LV) Cu Yd 0.14 0a0 0 2105.523 Common Borrow (EV) Cu Yd 0.17 0.00 2105,523 Common Borrow (CV) Cu Yd 0-19 0.00 2105.523 Common Borrow (LV) Cu Yd 0.14 0.00 2105,535 Topsoil Borrow (EV) Cu Yd 0.17 0.00 2105a535 Topsoil Borrow (CV) Cu Yd 0A9 0.00 2105.535 Topsoil Borrow (LV) Cu Yd 0A4 0.00 2105.607 Topsoil Embankment (CV) Cu Yd: 0.19 0.00 2105.607 Common Embankment (CV) Cu Yd 0.19 0.00 2105.607 Granular Embankment (CV) Cu Yd 0.19 0.00 2105.607 Select Granular Embankment (CV) Cu Yd 019 0.00 2105.607 Select Granular Embankment MOD (CV) Cu Yd 0,19 0.00 Aggregate Base 2211.501 Aggregate Base Ton i 0,55 1633 393.15 2211.502: Aggregate Base LV Cu Yd 0,77 0.00 2211,503 'Aggregate Base CV Cu Yd 0.99 0.00 2211.607 open G Cu Yd 0.99 U0 Aggregate Shouldering 2221 .501 Aggregate Shouldering Ton 0.55 0.00 2221-502 Aggregate Shouldering LV Cu Yd 0.77 0.00 2221.503 regate Shoulded Cv Cu Yd 0.99 0,00 Concrete Pavements 2301,511 Structural Concrete Cu Yd 1 0.98 0.00 2301-513 Structural Concrete HE Cu Yd 0,98 0.00 Bituminous Pavements 2350.501 Type ( ) Wearing Course Mixture Ton 0.90 16 14.40 2350-502 Type ( ) on Wear Course Mixture Ton 0.90 0.00 2350,503 Type ( ) ( ) Course Mixture Sq.Yd," t = 0.051 0.00 4.5 236 Type ( ) Wearing Course Mixture 0.90 0,00 Ton 2360.502 Type ( ) Non Wear Course Mixture Ton 0.90 0.00 2360.503.Type Course Mixture Sq,Yd. t = 0051 o.or v Only items shown will be considered for compensation adjustments. = No price adjustments will be diameter d pipes t thickness in inches Pipe 2501.511 Pipe Culvert Lire. Ft. 0.700 0.00 2501.521 tripe Arch Culvert Lire. Ft. 0.700 0.00 2501.561 Pipe Calvert Des 3006 Lire. Ft, 0.7110 0.00 2501,603 Pipe Culvert Lin. Ft. 0.700 0.00 2501.511 Pipe Sewer Lire Ft. 0.700 OM 2501.521 Pipe Arch Sever Lies. Ft, 0,700 0.110 2501.541 Pipe Sever Des 3006 Litz, Ft, 0.700 0.00 2501.60 l ipe Sewer Lars. Ft. 0300 0.00 p v Only items shown will be considered for compensation adjustments. = No price adjustments will be diameter d pipes t thickness in inches