Loading...
HomeMy WebLinkAbout20100419 - VI-04 MEMO To: Honorable Mayor and City Council From: Nick Egger – City Engineer Date: April 14, 2010 Re: Approve Quotes & Authorize Work – Spot Utility Lining Work – Sanitary Sewers The Engineering Department solicited quotes from two specialty contractors to perform sanitary sewer lining in several areas of the City. The work involves installation of a Cast In Place Pipe (CIPP) within the existing sanitary sewer pipe, eliminating the need to excavate the road and replace the pipe, which is more costly and more time consuming. The following is a summary of the results. Contractor Quote Veit & Company, Inc. $41,484.00 Insituform Technologies $45,747.00 USA, Inc. This work would begin in early May and be completed over the course of a few days. Council is requested to approve the quote from Veit & Company, Inc., and authorize work to begin. April 14, 2010 City of Hastings 1225 Progress Drive Hastings, MN 55033 Attn: Mr. Dave Chalmers Phone: 651.480.2334 Fax: 651.437.5006 PROJECT: Cured in Place Pipe lining (CIPP) QUOTE: 8” (6mm thick) CIPP lining - 650 lf Unit Price: $33.00/ l.f. 12” (6mm thick) CIPP lining – 100 lf Unit Price: $65.00/ l.f. 15” (7.5mm thick) CIPP lining – 202 lf Unit Price: $67.00/ l.f. èÍÈÛÐÿ  INCLUDES : - Pre/Post video of conditions (CD/DVD) of sewers that are lined - Minor traffic control (cones, utility work ahead signs) - Minor cleaning of pipe (2-3 passes with high pressure jet) - Robotic Reinstatement of active services - Bypass Pumping up to 4” Pump capacity - Resident notification prior to lining operations (1 week / 1 day) EXCLUDES : - Surveying, staking or layout - Permits, Fees, Licenses - Major Traffic Control (Lane Closures, Detours) - Restoration of any kind - Landscaping, seeding/restoration - Major Bypass Pumping (greater than 4” pump capacity) - Heavy Cleaning (more than 2-3 jet pass) - Root Cutting / Mineral Deposit Cleaning CONDITIONS: The following items are to be provided by others at no additional cost to V&C: -Unrestricted access to work area(s) for V&C crew and equipment. -Locations and access to all manholes/structures prior to mobilization to site(s). -Access and permitting for use of hydrants (or equivalent) in immediate work area(s). -Dumpsite for debris removed from lines to be cleaned -Set of plans detailing sewer system layout with correct manhole/structure numbers. NOTES: 1. Veit assumes that lines are in good enough condition for lining operations. If upon pre-inspection of the pipe to be lined, it is determined that lining isn’t possible without a point repair, the owner will be notified and be given the information necessary to determine the course of action to take. If lining does not occur, owner will be charged time and material rates for work that was completed. 2. Veit intends to use CIPP lining of the 15” pipe from MH to MH on Tyler Street (202 lf) and is priced accordingly. 3. Bid items are tied 4. Veit warranties materials and workmanship for 1 year after project completion. BOND: Add 1% to above Quoted Total for Bond, Pricing Valid for 15 Days Respectfully, Brent Johnson Veit & Company, Inc. Project Manager Direct: 763-428-6729 Cell: 612-369-4510 1177 Birch Lake Blvd. N Worldwide Pipeline Tel: (651) 253-0236 Rehabilitation White Bear Lake, MN Fax: (651) 344-0453 55110 www.insituform.com April 13, 2010 Mr. Nick Egger, PE City Engineer City of Hastings 1225 Progress Drive Hastings, MN 55033 RE: Insituform® Rehabilitation Proposal for 650 LF of 8-inch VCP, 100 LF of 12-inch VCP, and 90 LF of 15-inch VCP Hastings, Minnesota Dear Mr. Egger: Insituform Technologies USA, Inc. (ITI) is pleased to submit to you this proposal for the rehabilitation of sanitary sewer located in various locations in Hastings, MN. Over the past 35 years, ITI has rehabilitated over 75 million feet of sewer and drainage piping worldwide. The Insituform® process consists of installing a specifically designed resin saturated polyester felt tube into the exiting sewer and curing it in place. The result is a seamless, jointless durable composite pipe within the old pipe, improving its structure and minimizing leakage. The piping is returned to service in a fraction of the time required by conventional methods. As a result, the Insituform® process is faster, cleaner, safer, and performed at less cost than other repair alternatives. Following is a cost estimate for installation of approximately 833 LF of 8, 12 and 15-inch Insituform® Cured-in-Place Pipe designed as a fully structural pipe once installed and manhole rehabilitation using Quadex Manhole Liner Product at ½” thick. IteDescriptionUnitQtUnit PriceTotal my 1CIPP 8"LF64329.00$ 18,647.00$ 2CIPP 12"LF10090.00$ 9,000.00$ 3CIPP 15"LF90180.00$ 16,200.00$ 4Lateral ReinstatementEA19100.00$$ 1,900.00 Total Base Bid$45,747.00 1Quadex Manhole RehabVF12165.90$$ 1,990.80 Total Alternate$ 1,990.80 Total Base and Alternate$47,737.80 This proposal serves as a unit price contract for completion of the work described and may be adjusted to take into consideration any unforeseen or unusual circumstances that may arise such as collapsed pipes that require open excavation or required night work. Final invoicing for the project will be adjusted accordingly based on final agreed upon quantities. SCOPE OF WORK & DESIGN CONSIDERATIONS The scope of work includes installation of approximately 833 LF of CIPP into an 8-inch, 12-inch, and 15-inch vitrified clay sanitary sewer pipe and reinstatement of services. Estimate is also based on installing the CIPP during regular working hours and bypass pumping is included in the LF price for the CIPP. If night work is requested, additional costs may be incurred. This cost estimate also assumes a completion date of May 10, th 2010 for the 12-inch line on 6 Street if contract award is 4/18/10. The remainder of the work would be completed Summer 2010. The CIPP pipe designs are based on information provided by the customer and should be verified by the customer prior to proceeding with this project. Should any other conditions, existing or expected in the field, over the design life of the Insitupipe differ from the information based herein, then the appropriate adjustments should be made to the design calculations, along with the appropriate price adjustment. Description Field Condition Nominal Pipe Diameter: 8”, 12”, and 15” circular Operating Temperature: Less than 100 degrees Effluent Type: Sanitary sewer Number of Service Connections: 19 Soil Depth over Invert: 8’-17’ Reason for Rehabilitation: Fully deteriorated, infiltration PROPOSAL INCLUSIONS Certificate of Insurance with standard coverage One mobilization and demobilization Property owner coordination Traffic control Pre-cleaning of sanitary sewer line Lateral reinstatement As-built video inspection and CD Standard PPE for installation crew Standard one-year warranty PROPOSAL EXCLUSIONS The prices stated in this proposal do not include the following items. If provided by Contractor, the cost will be charged as extras; otherwise Owner will furnish these items at no cost to Contractor: Performance/Payment Bond (at 2.5% of proposal price) Special Insurance such as OCP, Builders Risk Water from a fire hydrant or other high volume source within a convenient distance Removal and disposal of any hazardous or toxic materials encountered nighttime work Any holiday work, , rush delivery or adverse weather work LIMITED WARRANTY IN LIEU OF ALL OTHER EXPRESSED, IMPLIED AND/OR STATUTORY. WARRANTIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, CONTRACTOR AGREES TO CORRECT ANY DEFECTS IN THE MATERIALS OR SERVICES PROVIDED BY CONTRACTOR WHICH ARE BROUGHT TO THE ATTENTION OF CONTRACTOR WITHIN ONE YEAR FOLLOWING COMPLETION OF CONTRACTOR'S WORK, PROVIDED OWNER AFFORDS CONTRACTOR SUITABLE ACCESS AND WORKING CONDITIONS TO ACCOMPLISH SUCH CORRECTION. STANDARD TERMS and CONDITIONS Removal, transporting, and disposal of any hazardous or toxic materials encountered during the project will be the responsibility of the Owner. All labor, equipment, material, supervision, and mobilization necessary to complete the ®® Insituform process per the above conditions, and Insituform specifications, are included. Any restrictions in our normal weekday work hours required by local, state, and/or federal authorities (due to noise restrictions or other reasons not known at the time of this proposal) will be an extra charge. MUTUAL RELEASE OF CONSEQUENTIAL DAMAGES Neither party shall be liable to the other for consequential damages relating to or arising out of the Contract. PAYMENT TERMS Payment due in full due within thirty days of completion of the project, no retainage to be held Prices stated are in effect for sixty days (60) from the date of this proposal We appreciate your interest in the Insituform process and giving us the opportunity to quote on your pipe rehabilitation needs which will protect your investment as well as the environment. Should you desire additional information please feel free to give me a call at 651-253-0236. Sincerely, INSITUFORM TECHNOLOGIES USA, INC. ß²¬¸±²§ ßò ß¼»®¸±´¼ Anthony A. Aderhold, PE, Business Development Manager ************************************************************* Accepted: City of Hastings, MN Signed: ________________________________ Date: _________________________ Printed Name/Title: ____________________________________________________ Is this Project Tax Exempt? ________ If Yes, please provide Tax Exemption Form and, where applicable, Project Exemption Form. Does this Project require Certified Payroll? ______ Are there wage rates? _______ if yes, please provide a copy of the wage rates. This accepted proposal constitutes a formal agreement. If you initiate a purchase order or other contract document it shall not be acknowledged without this accepted proposal as an attachment. Accepted By: Insituform Technologies USA, Inc. By: ____________________________________ Date: __________________________________