Loading...
HomeMy WebLinkAbout20070116 - VI-10 V-tO MEMO To: Honorable Mayor and City Council From: Tom Montgomery Date: January 11,2007 Re: Public Hearing and Resolution, 2007 Public Works Fee Schedule Council is requested to order a public hearing on the attached proposed 2007 Public Works fee schedule for the February 5th Council meeting. The Public Works fee schedule is used to invoice for emergency assistance or after hours work for contractors or private entities, and was last updated in 2004 Council is also requested to consider increases to the PW /Engineering related fees charged to building permits in the same public hearing. These fee categories are charged to building permits for activities such as final grading/site inspection, certificate of survey review, and top of block inspections. This fee schedule was last modified in early 2006, and the proposed increases are reflective of slight increases in billable rates from the City's consultant BDM. - ern' OF HASTIN6S NOTICE OF PUBLIC HEARING 2007 PUBLIC WORKS FEE SCHEDULE HEARING 7:00 PM, Monday, February 5, 2007 Hastings City Hall To Whom It May Concern: Notice is hereby given that the City Council of Hastings, Minnesota will meet in the City Council Chambers, City Hall, tol E. 4th St., at 7:00 PM, Monday, February 5, 2007, to consider the adoption of a staff and equipment fee schedule for the Public Works Department and to consider increases to Public Works and Engineering related fees charged to building permits. Any person, prior to the date of the public hearing, may examine the proposed fee schedules at the Cal Ruedy Public Works Building, 1225 Progress Drive between the hours of 7:00 AM to 3:00 PM. Copies of the fee schedule may be obtained at the Public Works Building or by calling the Public Works Department at 480-6185. DRAFf CITY OF HASTINGS 2007 PuBLIC WORKS FEE SCHEDULE For February 5, 2007 Public Hearing HASTINGS UTILITIES FEES-OTHER Water shut-off $50.00 (7am -3pm) $120.00 fee after hours (equal to 2 hour after hour callout charge) Final meter reads $25 Meter testing $75 Operating hydrants for fire flow tests $100 - after hours rate $ 50 + applicable callout rate (2 hr min.) or extended day rate (lhr min.) Filling Swimming Pools $150 - after hours rate $ 75 + applicable call out rate (2 hr min.) or extended day rate (lhr min.) TEMP. CONSTR. HYDRANT METERS . Installation charge $100 . Usage $0.01 per gallon ($10/1,000 gal) Tanker Fills $25 per tanker load of water After-Hours Work . Call out-2 hour miniml 2 x OT Labor Rate rounded up to nearest $5 increment . Extended Day 2 x OT Labor Rate rounded up to nearest $5 increment HASTINGS UTILITIES FEES-WATER METERS %" SR ECR with MXU, incl. Tax $319.50 1" SR ECR with MXU, incl. Tax $372.75 1.5" SR ECR with MXU, incl. Tax $633.68 2" SR ECR with MXU, incl. Tax $788.10 3" Compound with MXU $2,273.70 Larger than 3" to be determined by Utility Superintendent and based on meter cost. HASTINGS EQUIPMENT RATES Equipment: Hourly Rate: Pick-up truck $ 28.00 One-ton dump truck 29.00 Single-axle dump truck 40.00 Tandem-axle dump truck 50.00 Tractor Mower 40.00 Front-end loader 75.00 Road grader 100.00 Street sweeper 65.00 Roller 35.00 Air compressor 25.00 Sewer Vactor 120.00 John Deere mower 40.00 Pump, 4" 50.00 Pump, 12" 75.00 Skid loader 50.00 Chipper 40.00 Tanker 50.00 Aerial Lift Truck 75.00 Single Axle dump truck wi paver 75.00 Sewer Televising Van and Equipment 150.00 Sewer Service Televising Camera $75.oo/Service Type III Barricades $31hr, $25/day max. Note: Equipment rates are for equipment only. Operators will be charged out at the appropriate staff rate. Staff Rates: Rates set at two times the hourly rate rounded up to the nearest $5 increment. Position Hourlv Rate Overtime Rate Public Works Superintendent $70.oo/hr $70.oolhr Public Works Supervisor $65.oolhr $65.001hr Heavy Equip. Operator $50.oolhr $70.oolhr Light Equip. Operator $50.oolhr $70.oo/hr Utility Maint. III Operator $50.oo/hr $70.oolhr Utility Maint. II Operator $50.oolhr $70.oolhr Electrician $55.oolhr $80.oo/hr PuBLIC WORKs/ENGlNEERING REvIEW & INSPECTION FEE SCHEnULE Residential Lot Review of Certificate of Survey ........................$180.00 per Schedule Unit - On lots where approved development grading plan exists - charged upon issuance of building permit - 2006 Rate = $175.00 Residential Lot Re-Review of Certificate of Survey ....................$90.00 per Schedule Unit - In cases where the builder wishes to modify lot grading after a certificate of survey has already been reviewed and approved with the original permit - Collected prior to re-review - New Fee Category Residential Lot Review of Certificate of Survey ........................$375.00 per Schedule Unit - On lots where an approved development grading plan does not exist - charged upon issuance of building permit - 2006 Rate = $325.00 Residential Lot Final Grading Verification ...............................................$185.00 per Visit - Fee for one visit charged upon the issuance of building permit - When inspection fails, an additional fee is collected prior to re-inspection - 2006 Rate = $175.00 Residential Lot Foundation Top of Block Verification .............................$100.00 per Visit - Fee for one visit charged upon the issuance of building permit - When inspection fails, an additional fee is collected prior to re-inspection - 2006 Rate = $90.00