MEMO
To: Honorable Mayor and City Council
From: Tom Montgomery
Date: January 11,2007
Re: Public Hearing and Resolution, 2007 Public Works Fee Schedule
Council is requested to order a public hearing on the attached proposed 2007
Public Works fee schedule for the February 5th Council meeting. The Public Works fee
schedule is used to invoice for emergency assistance or after hours work for contractors
or private entities, and was last updated in 2004
Council is also requested to consider increases to the PW /Engineering related fees
charged to building permits in the same public hearing. These fee categories are charged
to building permits for activities such as final grading/site inspection, certificate of survey
review, and top of block inspections. This fee schedule was last modified in early 2006,
and the proposed increases are reflective of slight increases in billable rates from the
City's consultant BDM.
-
ern' OF HASTIN6S
NOTICE OF PUBLIC HEARING
2007 PUBLIC WORKS FEE SCHEDULE HEARING
7:00 PM, Monday, February 5, 2007
Hastings City Hall
To Whom It May Concern:
Notice is hereby given that the City Council of Hastings, Minnesota will meet in
the City Council Chambers, City Hall, tol E. 4th St., at 7:00 PM, Monday, February 5,
2007, to consider the adoption of a staff and equipment fee schedule for the Public Works
Department and to consider increases to Public Works and Engineering related fees
charged to building permits. Any person, prior to the date of the public hearing, may
examine the proposed fee schedules at the Cal Ruedy Public Works Building, 1225
Progress Drive between the hours of 7:00 AM to 3:00 PM. Copies of the fee schedule
may be obtained at the Public Works Building or by calling the Public Works Department
at 480-6185.
DRAFf
CITY OF HASTINGS
2007 PuBLIC WORKS FEE SCHEDULE
For February 5, 2007 Public Hearing
HASTINGS UTILITIES FEES-OTHER
Water shut-off $50.00 (7am -3pm)
$120.00 fee after hours (equal to 2
hour after hour callout charge)
Final meter reads $25
Meter testing $75
Operating hydrants for fire flow tests $100
- after hours rate $ 50 + applicable callout rate (2 hr
min.) or extended day rate (lhr min.)
Filling Swimming Pools $150
- after hours rate $ 75 + applicable call out rate (2 hr
min.) or extended day rate (lhr min.)
TEMP. CONSTR. HYDRANT METERS
. Installation charge $100
. Usage $0.01 per gallon ($10/1,000 gal)
Tanker Fills $25 per tanker load of water
After-Hours Work
. Call out-2 hour miniml 2 x OT Labor Rate rounded up to
nearest $5 increment
. Extended Day 2 x OT Labor Rate rounded up to
nearest $5 increment
HASTINGS UTILITIES FEES-WATER METERS
%" SR ECR with MXU, incl. Tax $319.50
1" SR ECR with MXU, incl. Tax $372.75
1.5" SR ECR with MXU, incl. Tax $633.68
2" SR ECR with MXU, incl. Tax $788.10
3" Compound with MXU $2,273.70
Larger than 3" to be determined by
Utility Superintendent and based on
meter cost.
HASTINGS EQUIPMENT RATES
Equipment: Hourly Rate:
Pick-up truck $ 28.00
One-ton dump truck 29.00
Single-axle dump truck 40.00
Tandem-axle dump truck 50.00
Tractor Mower 40.00
Front-end loader 75.00
Road grader 100.00
Street sweeper 65.00
Roller 35.00
Air compressor 25.00
Sewer Vactor 120.00
John Deere mower 40.00
Pump, 4" 50.00
Pump, 12" 75.00
Skid loader 50.00
Chipper 40.00
Tanker 50.00
Aerial Lift Truck 75.00
Single Axle dump truck wi paver 75.00
Sewer Televising Van and Equipment 150.00
Sewer Service Televising Camera $75.oo/Service
Type III Barricades $31hr, $25/day max.
Note: Equipment rates are for equipment only. Operators will be charged out at the appropriate staff rate.
Staff Rates: Rates set at two times the hourly rate rounded up to the nearest $5
increment.
Position Hourlv Rate Overtime Rate
Public Works Superintendent $70.oo/hr $70.oolhr
Public Works Supervisor $65.oolhr $65.001hr
Heavy Equip. Operator $50.oolhr $70.oolhr
Light Equip. Operator $50.oolhr $70.oo/hr
Utility Maint. III Operator $50.oo/hr $70.oolhr
Utility Maint. II Operator $50.oolhr $70.oolhr
Electrician $55.oolhr $80.oo/hr
PuBLIC WORKs/ENGlNEERING REvIEW & INSPECTION FEE SCHEnULE
Residential Lot Review of Certificate of Survey ........................$180.00 per Schedule Unit
- On lots where approved development grading plan exists
- charged upon issuance of building permit
- 2006 Rate = $175.00
Residential Lot Re-Review of Certificate of Survey ....................$90.00 per Schedule Unit
- In cases where the builder wishes to modify lot grading after a certificate of survey has
already been reviewed and approved with the original permit
- Collected prior to re-review
- New Fee Category
Residential Lot Review of Certificate of Survey ........................$375.00 per Schedule Unit
- On lots where an approved development grading plan does not exist
- charged upon issuance of building permit
- 2006 Rate = $325.00
Residential Lot Final Grading Verification ...............................................$185.00 per Visit
- Fee for one visit charged upon the issuance of building permit
- When inspection fails, an additional fee is collected prior to re-inspection
- 2006 Rate = $175.00
Residential Lot Foundation Top of Block Verification .............................$100.00 per Visit
- Fee for one visit charged upon the issuance of building permit
- When inspection fails, an additional fee is collected prior to re-inspection
- 2006 Rate = $90.00