MEMO
To:
From:
Date:
Re:
Honorable Mayor and City Council
Tom Montgomery
January 30, 2007
Public Hearing and Resolution,
2007 Public Works Fee Schedule
At the January 16 meeting, Council ordered a public hearing on the proposed
2007 Public Works fee schedule and Engineering plan review and inspection fees for the
February 5~' City Council meeting. The fee schedule was last updated in 2004, and has
been revised to include new equipment and equipment and personnel rates were adjusted
to reflect increased costs. The fee schedule is used to invoice for emergency assistance or
after hours work for contractors or private entities. The Engineering plan review and
inspection fees is for work contracted out to BDM, an engineering consulting firm the
city uses for development review and inspection, and reflects their 2007 pricing.
COUNCIL ACTION REQUESTED
Council is requested to approve the enclosed resolution adopting the 2007 Public
Works Fee Schedule and Engineering Plan Review and Inspection Fees.
-,i r
~.
CITY OF NASTINFiS
CITY OF HASTINGS
Dakota County, Minnesota
Resolution No.
RESOLUTION ADOPTING THE 2007 PUBLIC WORKS FEE SCHEDULE AND
ENGINEERING DEPARTMENT PLAN REVIEW AND INSPECTIONS FEES
WHEREAS, the Hastings Public Works fee schedule was last updated in 2004, and
WHEREAS, the Hastings Engineering Department Plan Review and Inspection fees were
last updated in 2006, and
WHEREAS, the City of Hastings has determined that it is necessary to update a fee
schedule for billable Public Works operations and maintenance activities, and update the
Engineering Department Plan Review and Inspections fee schedule to reflect increased costs
for providing these services.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF HASTINGS AS FOLLOWS;
That the following 2007 Public Works Fee Schedule and Engineering Department Plan
Review and Inspections Fee Schedule is hereby adopted and in effect:
CITY OF HASTINGS
2007 PUBLIC WORKS FEE SCHEDULE
HASTINGS UTILITIES FEES-OTHER
Water shut-off $50.00 (lam -3pm)
$120.00 fee after hours (equal to 2
hour after hour call out char e
Final meter reads $25
Meter testin $75
Operating hydrants for fire flow tests $100
-after hours rate $ 50 + applicable call out rate (2 hr
min. or extended da rate 1 hr min.
Filling Swimming Pools $150
-after hours rate $ 75 + applicable call out rate (2 hr
min. or extended da rate 1 hr min.
TEMP. CONSTR. HYDRANT METERS
• Installation charge $100
• Usa e $0.01 er anon $l0/1,000 al
Tanker Fills $25 er tanker load of water
After-Hours Work
• Call out-2 hour minim Z x OT Labor Rate rounded up to
nearest $5 increment
• Extended Day 2 x OT Labor Rate rounded up to
nearest $5 increment
HASTINGS UTILITIES FEES-WATER METERS
'/<" SR ECR with MXU, incl. Tax $319.50
1" SR ECR with MXU, incl. Tax $372.75
1.5" SR ECR with MXU, incl. Tax $633.68
2" SR ECR with MXU, incl. Tax $788.10
3" Com ound with MXU $2,273.70
Larger than 3" to be determined by
Utility Superintendent and based on
meter cost.
HASTINGS EQUIPMENT RATES
Equipment: Hourly Rate:
Pick-up truck $ 28.00
One-ton dump truck 29.00
Single-axle dump truck 40.00
Tandem-axle dump truck 50.00
Tractor Mower 40.00
Front-end loader 75.00
Road grader 100.00
Street sweeper 65.00
Roller 35.00
Air compressor 25.00
Sewer Vactor 120.00
John Deere mower 40.00
Pump, 4" 50.00
Pump, 12" 75.00
Skid loader 50.00
Chipper 40.00
Tanker 50.00
Aerial Lift Truck 75.00
Single Axle dump truck w/ paver 75.00
Sewer 'Televising Van and Equipment 150.00
Sewer Service Televising Camera $75.00/Service
Type III Barricades $3/hr, $25/day max.
Note: Equipment rates are for equipment only. Operators will be charged out at the appropriate staff
rate.
Staff Rates: Rates set at two times the hourly rate rounded up to the nearest $5
increment.
Position Hourly Rate Overtime Rate
Public Works Superintendent $70.00/hr $70.00/hr
Public Works Supervisor $65.00/hr $65.00/hr
Heavy Equip. Operator $50.00/hr $70.00/hr
Light 1?quip. Operator $50.00/hr $70.00/hr
Utility Maint. III Operator $50.00/hr $70.00/hr
Utility Maint. II Operator $50.00/hr $70.00/hr
Electrician $55.00/hr $80.00/hr
CITY OF HASTINGS
2007 ENGINEERING PLAN REVIEW AND INSPECTIONS FEE SCHEDULE
Residential Lot Review of Certificate of Survey ........................$180.00 per Schedule Unit
- On lots x~here approved development grading plan exists
- charged upon issuance of building permit
Residential Lot Re-Review of Certificate of Survey ...................$90.00 per Schedule Unit
- In cases where the builder wishes to modify lot grading after a certificate of survey has
already been reviewed and approved with the original permit
-Collected prior to re-review
Residential Lot Review of Certificate of Survey ........................$180.00 per Schedule Unit
- On dots where approved development grading plan exists
- charged upon issuance of building permit
Residential Lot Final Grading Verification ..............................................$185.00 per Visit
- Fee for one visit charged upon the issuance of building permit
- When inspection fails, an additional fee is collected prior to re-inspection
Residential Lot Foundation Top of Block Verification ............................$100.00 per Visit
- Fee for one visit charged upon the issuance of building permit
- When inspection fails, an additional fee is collected prior to re-inspection
ADOPTEI) BY THE CITY COUNCIL OF HASTINGS, MINNESOTA, THIS 5`h DAY
OF February, 2007.
Ayes:
Nays:
ATTEST:
Paul J. Hicks, Mayor
Melanie Mesko Lee, City Clerk (Seal)