Loading...
HomeMy WebLinkAbout20070205 - VII-3/VIII-A-1VII-3 VIII-A-1 MEMO To: From: Date: Re: Honorable Mayor and City Council Tom Montgomery January 30, 2007 Public Hearing and Resolution, 2007 Public Works Fee Schedule At the January 16 meeting, Council ordered a public hearing on the proposed 2007 Public Works fee schedule and Engineering plan review and inspection fees for the February 5~' City Council meeting. The fee schedule was last updated in 2004, and has been revised to include new equipment and equipment and personnel rates were adjusted to reflect increased costs. The fee schedule is used to invoice for emergency assistance or after hours work for contractors or private entities. The Engineering plan review and inspection fees is for work contracted out to BDM, an engineering consulting firm the city uses for development review and inspection, and reflects their 2007 pricing. COUNCIL ACTION REQUESTED Council is requested to approve the enclosed resolution adopting the 2007 Public Works Fee Schedule and Engineering Plan Review and Inspection Fees. -,i r ~. CITY OF NASTINFiS CITY OF HASTINGS Dakota County, Minnesota Resolution No. RESOLUTION ADOPTING THE 2007 PUBLIC WORKS FEE SCHEDULE AND ENGINEERING DEPARTMENT PLAN REVIEW AND INSPECTIONS FEES WHEREAS, the Hastings Public Works fee schedule was last updated in 2004, and WHEREAS, the Hastings Engineering Department Plan Review and Inspection fees were last updated in 2006, and WHEREAS, the City of Hastings has determined that it is necessary to update a fee schedule for billable Public Works operations and maintenance activities, and update the Engineering Department Plan Review and Inspections fee schedule to reflect increased costs for providing these services. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HASTINGS AS FOLLOWS; That the following 2007 Public Works Fee Schedule and Engineering Department Plan Review and Inspections Fee Schedule is hereby adopted and in effect: CITY OF HASTINGS 2007 PUBLIC WORKS FEE SCHEDULE HASTINGS UTILITIES FEES-OTHER Water shut-off $50.00 (lam -3pm) $120.00 fee after hours (equal to 2 hour after hour call out char e Final meter reads $25 Meter testin $75 Operating hydrants for fire flow tests $100 -after hours rate $ 50 + applicable call out rate (2 hr min. or extended da rate 1 hr min. Filling Swimming Pools $150 -after hours rate $ 75 + applicable call out rate (2 hr min. or extended da rate 1 hr min. TEMP. CONSTR. HYDRANT METERS • Installation charge $100 • Usa e $0.01 er anon $l0/1,000 al Tanker Fills $25 er tanker load of water After-Hours Work • Call out-2 hour minim Z x OT Labor Rate rounded up to nearest $5 increment • Extended Day 2 x OT Labor Rate rounded up to nearest $5 increment HASTINGS UTILITIES FEES-WATER METERS '/<" SR ECR with MXU, incl. Tax $319.50 1" SR ECR with MXU, incl. Tax $372.75 1.5" SR ECR with MXU, incl. Tax $633.68 2" SR ECR with MXU, incl. Tax $788.10 3" Com ound with MXU $2,273.70 Larger than 3" to be determined by Utility Superintendent and based on meter cost. HASTINGS EQUIPMENT RATES Equipment: Hourly Rate: Pick-up truck $ 28.00 One-ton dump truck 29.00 Single-axle dump truck 40.00 Tandem-axle dump truck 50.00 Tractor Mower 40.00 Front-end loader 75.00 Road grader 100.00 Street sweeper 65.00 Roller 35.00 Air compressor 25.00 Sewer Vactor 120.00 John Deere mower 40.00 Pump, 4" 50.00 Pump, 12" 75.00 Skid loader 50.00 Chipper 40.00 Tanker 50.00 Aerial Lift Truck 75.00 Single Axle dump truck w/ paver 75.00 Sewer 'Televising Van and Equipment 150.00 Sewer Service Televising Camera $75.00/Service Type III Barricades $3/hr, $25/day max. Note: Equipment rates are for equipment only. Operators will be charged out at the appropriate staff rate. Staff Rates: Rates set at two times the hourly rate rounded up to the nearest $5 increment. Position Hourly Rate Overtime Rate Public Works Superintendent $70.00/hr $70.00/hr Public Works Supervisor $65.00/hr $65.00/hr Heavy Equip. Operator $50.00/hr $70.00/hr Light 1?quip. Operator $50.00/hr $70.00/hr Utility Maint. III Operator $50.00/hr $70.00/hr Utility Maint. II Operator $50.00/hr $70.00/hr Electrician $55.00/hr $80.00/hr CITY OF HASTINGS 2007 ENGINEERING PLAN REVIEW AND INSPECTIONS FEE SCHEDULE Residential Lot Review of Certificate of Survey ........................$180.00 per Schedule Unit - On lots x~here approved development grading plan exists - charged upon issuance of building permit Residential Lot Re-Review of Certificate of Survey ...................$90.00 per Schedule Unit - In cases where the builder wishes to modify lot grading after a certificate of survey has already been reviewed and approved with the original permit -Collected prior to re-review Residential Lot Review of Certificate of Survey ........................$180.00 per Schedule Unit - On dots where approved development grading plan exists - charged upon issuance of building permit Residential Lot Final Grading Verification ..............................................$185.00 per Visit - Fee for one visit charged upon the issuance of building permit - When inspection fails, an additional fee is collected prior to re-inspection Residential Lot Foundation Top of Block Verification ............................$100.00 per Visit - Fee for one visit charged upon the issuance of building permit - When inspection fails, an additional fee is collected prior to re-inspection ADOPTEI) BY THE CITY COUNCIL OF HASTINGS, MINNESOTA, THIS 5`h DAY OF February, 2007. Ayes: Nays: ATTEST: Paul J. Hicks, Mayor Melanie Mesko Lee, City Clerk (Seal)