HomeMy WebLinkAbout20070305 - VIII-C-2MEMORANDUM VIII-C-2
TO: Honorable Mayor and City Councilmembers
FROM: Dave Osberg, City Administrator
DATE: March 1, 2007
SUBJECT: City Hall and Public Works Garage Renovation Concept Plan and
Authorization to Utilize TKDA for Architectural and Engineering
Services.
RECOMMENDED CITY COUNCIL ACTION
It is recommended that the City Council take action approving the concept plans as
enclosed, of the proposed City Hall and Public Works Garage renovation, and authorize
the utilization of TKDA for Architectural and Engineering Services for design
development and opinion of probable costs in an amount of $7,000 for City Hall and
$23,000 for the Public Works Garage. Staff is not recommending at this time
construction document services be approved, as outlined in the attachment, until such
time the City is ready with a financial plan for each of the renovation and construction
projects.
BACKGROUND
In a prior report to the City Council, Staff outlined a variety of issues associated with
space needs throughout the City. Renovation of the Finance and IT Department space is
nearly complete, which also included a major renovation of the resource room where
mailboxes, fax machines, copier and office supplies are located. Recent discussion
resulted in significant review by various City stag on the potential renovation of the front
counter area to better serve the public on the 15` Floor, in addition to a renovation of the
entire 2°d floor, west end. A high priority on the 1~` floor is reconfiguration of the front
counter staff area, to be certain they are closer to the initial point of contact with the
public, and also allow staff more private front counter interactions.
There has been consideration over the years to relocating the Engineering Department to
the Public Works garage, thus the attachment illustrates how the 2"d floor space would be
utilized by the Planning and Building Departments, once the Engineering Department
completes its relocation to the Public Works Garage. With the recent acquisition of the
UBC facility by the HRA, certain equipment and vehicles have been relocated to the
facility, while at the same time some basic improvements are completed at the UBC
facility. The immediate priority addressed in this plan results in improvements to include:
better restroom facilities, locker room, storage, conference and training space and HVAC
improvements, along with the additional space associated with the relocation of the
Engineering Department to the Cal Ruedy Public Works Garage.
The next step in the process, and thus the need to utilize the services of TKDA would
include more specific design development documents which will assist in the preparation
of the opinion of probable cost. Upon completion of that stage, Staff would present
additional information to the Finance Committee and ultimately the City Council on a
financing plan for completion of the projects, with of course renovation of the Public
Works Garage and relocation of the Engineering Department taking place first. Should a
feasible financing plan be developed and approved by the City Council, TKDA would
then be engaged to complete the final design and construction document preparation, to
prepare for bidding of the projects.
Staff is attempting to advance the project in a manner that results in utilizing the services
of TKDA at certain stages, "checking in" with the City Council, and then determining if
the next stage should be implemented. This seems to be a reasonable approach, utilizing
completely the services of TKDA, only after the financial feasibility of the projects has
been firmly established.
David M. dsberg
City Administrator
TKDA
ENGINEERS • ARCHIIC-Ci5 • PLANNERS
February 20, 2007
Mr. David Osberg
Hastings City Administrator
101-4th Street East
Hastings, Minnesota 55003-1955
444 Cedar Street, Sutte 1500
Saint Paul, MN 55101-2140
(651) 292-0400
(651) 292.0093 Faz
www.tkda.com
Draft for Review Only
Re: Supplemental Agreement No. 1 for Architectural and Engineering Services
Design Development, Construction Documents, and Opinions of Probable Costs
City Hall Renovation and Public Works Administration Renovation/Expansion
TKDA Project No. 0013725.001
Deaz Mr. Osberg:
Pursuant to communications with you, we propose to provide additional Architectural and Engineering
services for Design Development, Opinions of Probable Construction Costs, and Construction
Documents in connection with:
Renovation of City Hall's Second Floor (west end) and the First Floor Main Lobby
Renovation/Expansion of the Administrative Area of the Public Works Building
A sepazate set of drawings and construction documents will be prepared for each of the two buildings.
Opinions of Probable Construction Costs will be prepazed for each building at the conclusion of the
Design Development Phase. Work will only continue to Final Design/ Construction Documents upon
review and approval of the Design Development and Opinions of Probable Construction Costs. This
Supplemental Agreement No. 1 does not include services for replacement of other building systems
outside the Project azea (i.e., overall fire alazm systems, main building entrance for City Hall, lighting
system replacements, etc.). Such services would be provided as additional services if authorized by the
OWNER.
This Supplemental Agreement No. 1, made and entered into as of the date formalized at the end of this
Agreement, amends the original Agreement dated August 4, 2006, for the Project, as hereinafter stated.
Add the following new Tasks to SECTION II -SERVICES TO BE PROVIDED BY TKDA:
H. CTI'Y HALL RENOVATION (SECOND FLOOR WEST END AND LOBBY
FIRST FLOORI
On the basis of approval of the previously prepared Space Plan drawings, TKDA shall
provide the following services:
Design Development and Opinion of Probable Costs
a) Field verify existing conditions and prepaze architectural background
drawings.
An Employee Owned Company Promoting Affirmative Action and Equal Opportunity
Mr. David Osberg
Dr t R O l
City of Hastings of for evlew n y
Supplemental Agreement No. 1 for Architectural and Engineering Services
Design Development, Construction Documents, and Opinions of Probable Costs
City Hall Renovation and Public Works Administration Renovation/Expansion
Februazy 2Q 2007
Page 2
b) Meet with the OWNER'S staff to review previously prepared concept
drawings and confirm/approve the scope of work and schedule.
c) Based on the approved Space Plan concept (completed under the initial
Agreement), prepare Design Development Drawings for the renovation
of west end of City Hall's Second Floor and renovation of the First Floor
Main Lobby. This will include Architectural, Mechanical, and Electrical
drawings describing in general the project work scope and material
finishes. Drawings will be developed to the extent an Opinion of
Probable Costs reflecting estimated unit prices can be prepared
(approximately the 35% point of construction drawings).
d) Based on the Design Development drawings, prepaze an Opinion of
Probable Costs reflecting estimated unit prices to be used for budgeting.
e) Meet with the OWNER'S staff to present the drawings and Opinion of
Probable Costs, and seek approval from to proceed to the next phase of
design.
2. Final Design and Construction Documents
a) Based on approval of the Design Development drawings and Opinion of
Probable Costs, prepare for incorporation into [he Contract Documents,
final drawings and specifications (Project Manual) to show the character
and extent of the Project for competitive, public bidding by general
contractors.
b) Two meetings with the OWNER'S staff will be held to review the
progress and provide review comments during the Final Design.
c) Prepaze an updated Opinion of Probable Costs based on the final
drawings and specifications. Advise the OWNER of any adjustments
caused by changes in extent or design requirements of the Project.
d) Prepaze for review and approval by the OWNER, his legal counsel, and
other advisors construction contract agreement forms, general conditions,
supplementary conditions, bid forms, invitations to bid and instructions
to bidders, and assist in the preparation of other related documents.
e) Present to the OWNER for review, one set of the final Contract
Documents and Final Opinion of Probable Costs. Make minor revisions
and adjustments following the OWNER'S review.
f) Furnish to the OWNER three signed sets of the Contract Documents and
design data so that the OWNER may submit to their governing
officials/departments for review and approval and seek Council
permission to solicit competitive, public bids.
Mr. David Osberg Draft for Review Only
City of Hastings
Supplemental Agreement No. 1 for Architectural and Engineering Services
Design Development, Construction Documents, and Opinions of Probable Costs
City Hall Renovation and Public Works Administration Renovation/Expansion
February 20, 2007
Page 3
g) Should the OWNER elect to proceed with bidding and construction,
TKDA would provide Bidding and Construction Contract Administration
services under a sepazate authorization as an additional service.
PUBLIC WORKS BUILDING RENOVATION AND EXPANSION
On the basis of approval of the previously prepared Space Plan drawings, TKDA shall
provide the following services:
Des~n Development Phase and Cost Estimate
a) Field verify existing conditions and prepare azchitectural background
drawings of existing building and site in the azea of the expansion.
b) Meet with the OWNER'S staff to review previously prepared concept
drawings and confirm approve the scope of work and schedule.
c) Based on the approved Public Works Space Plan concept (completed
under initial Agreement), prepaze Design Development Drawings for the
Public Works Administrative expansion. This will include Site/Civil,
Architectural, Structural, Mechanical, and Electrical drawings describing
in general the project work scope and material finishes. Drawings will
be developed to the extent an Opinion of Probable Costs reflecting
estimated unit prices can be prepared (approximately the 35% point of
construction drawings). This will include about 7,500 square feet of new
construction and renovation of about 400 square feet.
d) Based on the Design Development drawings, prepare an Opinion of
Probable Costs reflecting estimated unit prices.
e) Meet with the OWNER'S staff to present the drawings and Opinion of
Probable Costs, and seek approval from to proceed to the next phase of
design.
2. Final Design and Construction Documents
a) Based on an existing survey, prepaze final site drainage, utility, and
landscape plan.
b) Based on approval of the Design Development drawings and Opinion of
Probable Costs, prepaze for incorporation into the Contract Documents,
final building drawings and specifications (Project Manual) to show the
character and extent of the Project for competitive bidding by a prime
general contractor.
c) Three meetings with the OWNER'S staff will be held to review the
progress and provide review comments during the Final Design.
Mr. David Osberg Draft for Review Only
City of Hastings
Supplemental Agreement No. 1 for Architectural and Engineering Services
Design Development, Construction Documents, and Opinions of Probable Costs
City Hall Renovation and Public Works Administration Renovation/Expansion
February 20, 2007
Page 4
d) Prepaze an updated Opinion of Probable Costs based on the final
drawings and specifications. Advise the OWNER of any adjustments
caused by changes in extent or design requirements of the Project.
e) Prepaze for review and approval by the OWNER, his legal counsel, and
other advisors construction contract agreement forms, general conditions,
supplementazy conditions, bid forms, invitations to bid and instructions
to bidders, and assist in the preparation of other related documents.
f) Present to the OWNER three sets of the final Contract Documents and
final Opinion of Probable Costs to the OWNER. Make minor revisions
and adjustments following the OWNER'S review.
g) Furnish to the OWNER three signed sets of the Contract Documents and
design data so that the OWNER may submit to their governing
officials/departments for review and approval and seek Council
permission to solicit competitive, public bids.
h) Should the OWNER elect to proceed with bidding and construction,
TKDA would provide Bidding and Construction Contract Administration
services under a separate authorization as an additional service.
II. Under SECTION V -PERIOD OF SERVICE, the completion of services shall be extended an
additional five months beyond the effective date (date authorized by the OWNER) of this
Supplemental Agreement No. 1.
III. Under SECTION VI -COMPENSATION, replace the first paragraph with the following:
Compensation to TKDA for services provided under SECTION II shall be on an Hourly Rate
basis as described in Article 3 of the General Provisions in the following not to exceed amount.
The fee shown for each phase is provided for information only and shall not be interpreted as a
limiting factor for that phase, rather the total not to exceed amount is the limiting factor.
Original Agreement (City Hall and Public Works Space Planning)
Additional Requested Services (Mechanical Design assistance w/Storage Bldg.)
Subtotal
Supplemental Agreement No. 1
Citv Hall:
Design Development
Construction Documents
Public Works:
Design Development
Construction Documents
Subtotal
TOTAL PROJECT (NOT TO EXCEED)
$ 8,400
11,200
$19,600
7,000
13,000
23,000
89,000
$132,000
$151,600
Mr. David Osberg Draft for Review Only
City of Hastings
Supplemental Agreement No. 1 for Architectural and Engineering Services
Design Development, Construction Documents, and Opinions of Probable Costs
City Hall Renovation and Public Works Administration RenovationBxpansion
February 20, 2007
Page 5
We thank you for the opportunity to submit this Supplemental Agreement No. 1 and are willing that this
letter constitute a supplement to our original Agreement upon its signature by an authorized official of the
City of Hastings and the return of a signed copy to us.
Sincerely,
William E. Deitner, P.E. Dean A. Johnson, AIA, CSI
CEO Architectural Group Manager
ACCEPTED FOR THE CTI'Y OF HASTINGS, MINNESOTA
sy
Title
Date
WED:DAJ:adh
i
~°~ F x
~ =3
LL
OJ
~m
va
~a
0
~fi 0
~ --
.e 0
~ ~/ .r-- --- -
~
~ -t-- - - J
`1
~
s
'~1\ ~
~ ~~
;;
B~ 4
1\ ~~
``
,
l/
i
q~!
~ ~ ®
~
3 ~ I ! ~ r
c7
c>?w 0 i E ~i Q
~
~.~..._._ _._.____~ ___..___.. _ _ . .
---.._.____ ____ ...____ .._
i
I
r~
6
E
~~ ~ ~
M
I_ ~
l- M ud
~_ "° ~ ~
~ ~° ~ ~
~.
~~V I KY IVpp'EIY[11p'LMMY'6 °~
\\I~ ~ _'~ _L _l 2 1
~~ Z
s - ~
_ - ~
~~
m•
n_
r __ .. ... __.. ~ __ __....
1+'o"aw\ear a>.jl~Mw~molr~rl~~nx~W-n ~~r-~~
i
~ z
= J
a ~_
~~
F I ~~ ~
o W g e ,. ~ r.
m o 3 a g
J~a W 1 i ~
~Wa p Ha, Q
}F<o o ; ~ ~~: g}
U N N a 4 i~ 9 ~~ B
Y
- ~ ~ ~ I
~ ~ S' _ 1 g
~~
~r g
~ a
_ ~z
~e
~ ~' ~'
y ~ ®a
C ~ _ Yy
`C ~] 1
~~
~~
~;
~ I, z
' o®
.~~ . ~ o
-- ~ m
__~
I.
~~
~~
g
3~ 6 Z
~ U
J W
~a
mz
~~. 4k
~~'`' ~ X32
g
~ ~
~~
1`
~~~
~~ _
Ly JJ
L L
i~,
®a
~_-~
~~ _~~
~,~ ~1
_ W
,~
~~'
Z
~- ; o
~®
I~~ 9
'-- ~.
~m
_.~
--i
~~
~~
~q
$ c~ o
g z~
pU
J W
~a
mN
z
~~" Pip
a
ZW ~
= ~
o W
so3 5
~
m~0 w
O i
W
O YY
v
i 1
pp
aicZi a ~ ~ (y
g ~
~~
t g
§ a
Z
•~~
~6
~~ •ea
~~
~gg
~~
i
A~~
~ ~ ,~
i Q
3
6 I
~oveam-.mr-!\nx unW Ww+~~msu[i1~nAW-e\r
W 9p
~'~ Z O W ~ E A S
~ ~ mp~ ~.
~ LL J JyUO N ~ ~ ~ ~ ® ~~
~ Q
UU UfnN d P I~8 i~
L J