Loading...
HomeMy WebLinkAbout20070305 - VI-05VI-5 CHANGE ORDER NO. 1 SUMMARY DESCRiP"f'ION CONSTRUCTION OF WATER TREATMENT PLANT NO. 1 HASTING'~, MN BRA FILE N0.000222-06106-0 1 Issue 3 -Changes to Door Hardware per Engineer Shop Drawing Review. Add $ 147.07 2. 3. 4. Issue 9 (Field Order 2} - Re-route roof and floor drains; add sump pump unit. Issue 10 (Field Order 3) -Structural changes to roof overhang framing. Issue 11R-1 (Proposal Request 1) -Change exterior sign from 1360 to 1300, and from cast aluminum to limestone. Add $ 1,531.61 Add $ 6,488.04 Add $ 534.54 TOTAL CHANGE ORDER ADD $ 8,698.26