HomeMy WebLinkAbout20070305 - VI-05VI-5
CHANGE ORDER NO. 1 SUMMARY DESCRiP"f'ION
CONSTRUCTION OF WATER TREATMENT PLANT NO. 1
HASTING'~, MN
BRA FILE N0.000222-06106-0
1
Issue 3 -Changes to Door Hardware per Engineer Shop
Drawing Review.
Add $ 147.07
2.
3.
4.
Issue 9 (Field Order 2} - Re-route roof and floor drains;
add sump pump unit.
Issue 10 (Field Order 3) -Structural changes to roof
overhang framing.
Issue 11R-1 (Proposal Request 1) -Change exterior sign
from 1360 to 1300, and from cast aluminum to limestone.
Add $ 1,531.61
Add $ 6,488.04
Add $ 534.54
TOTAL CHANGE ORDER ADD $ 8,698.26