HomeMy WebLinkAbout20070716 - VIII-A-2VIII~A-2
MEMO
TO: Honorable Mayor and City Council
From: Nick Egger, City Engineer
Date: July 11, 2007
Re: Resolution Ordering Feasibility Study for Proposed 2008 Improvement Program
Enclosed for Council consideration is a resolution requesting a feasibility study for the following
project proposed for construction in 2008:
- Project 2008-1, 2008 Street & Utility Improvements
PROTECT 2008-1~ 2008 IMPROVEMENTS
This project would involve reconstructing 6`h, 7`s, 8`}', and 9`~ Streets west of Vernzillian Street
(TH 61) to Spring Street, Eddy and Spring Streets between 6`'` Street and 10`h Street, 7`'' and 8~'
Streets from Vermillion Street east to Bailly Street, and Sibley Street between 6a` Street and 8`~
Street. The alleys from Vermillion Street west to Eddy Street on the blocks between 6`~ and 8a'
Streets, along with the alley between 7`i' and 8`h Street from Vermillion Street east to Sibley
Street would also be proposed for reconstruction. All street segment reconstruction would also
involve extensive utility replacement work.
Another large component of this project proposal involves rehabilitation and reconstruction of
many segments of the stone retaining walls that abut Vermillion Street, as well as segments that
carry away from Vermillion east and west along City sidestreets and alleys.
This project is being proposed slightly earlier than previously intended due to time sensitive
sources of funding for the rehabilitation work on the stone retaining walls. The timing of the
project would also allow for continuity of the design, construction, and construction oversight of
the rehabilitation work as prescribed by the agreement between the City, MnDOT, and the design
firm that the Council adopted in June.
COUNCIL ACTION REQUESTED
It is requested that the Council adopt the enclosed resolution ordering
the feasibility study for Project 2008-1, the 2008 Street and Utility
Improvements.
M
VIII ~~~
CITY OF HASTINGS
DAKOTA COUNTY, MINNESOTA
Resolution No.
RESOLUTION ORDERING THE PREPARATION OF A FEASIBII.ITY REPORT FOR
CITY PROJECT 2008-1, 2008 STREET & UTILITY IMPROVEMENTS
WHEREAS, it is proposed to construct the following improvements as part of the 2008 Street
and Utility Improvement Program:
2008-1 2008 STREET & UTII,rty IMPROVE1vIIENTS - 6~', 7`~, 8~', and 9`~ Streets west of
Vermillion Street (TH 61) to S~ring Street, Eddy and Spring Streets between 6`i'
Street and 10th Street, 7~' and 8` Streets east of Vermillion Street to Bailly Street,
and Sibley Street between 6`}' Street and 8th Street, alleys from Vermillion Street
west to Eddy Street between 6`h and 8~' Streets, and the alley from Vermillion
Street east to Sibley Street between 7~' and 8~' Streets
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HASTINGS AS FOLLOWS; that
The above proposed improvements are hereby referred to the City Engineer for study and he is
instructed to report to the City Council with all convenient speed, advising the Council in a
preliminary way as to whether the proposed improvements are feasible and as to whether they
would be made as proposed or in connection with some other improvements, and the estimated
cost of the improvements as recommended.
ADOPTED BY THE CITY COUNCIL OF HASTINGS, NIINNESOTA, THIS 16a' DAY
OF JULY, 2007.
Ayes:
Nays:
Paul J. Hicks, Mayor
ATTEST:
Melanie Mesko Lee, City Clerk SEAL
Q ^o-p
a ~ Q c ~ L1
133a1S A"IlldB
0
a
a
o
a o
o
0
Q~^ ~Q~
Q ^ ~ ~ - ^ ^ a
o
o
^
o
-
a
0
r~ ~ Q a Q ~ d
133a1S a3lJLL
d o ~ o
o ~ ,. a
((~-
Lr ~ [ '(
~~~ ~ ~ ~~a~~~~ ~~ ~U ~
t-
w
Lw
r
N
0
TM
//~, W
yr Q
CIS N
U
..-. W
~ O
C!) a
~ U
W
~~
~ a
Ua
H
W
W
O
a
}~
F-
W
W
0
0
N
(1.9 H1a 133a1S NOIIlIWa3A
i33als A3swva