MEMO
TO: Honorable Mayor and City Council
From: Nick Egger, City Engineer
Date: July 2, 2007
Re: Resolution -Accepting Feasibility Study and ordering Public Hearing for Quiet Zone
Enclosed for Council approval is a .resolution accepting the Feasibility Study for the proposed
Quiet Zone Improvements and ordering a Public Hearing on the project for the August 6`~'
Council meeting. A neighborhood meeting is scheduled to take place on July 24~'. A memo
describing the project in detail and including comments on the project received at the
neighborhood meetings will be included in the Council packet for the August 6`k' meeting.
- ..~
~.
crrY DF tra~s7rtass
CITY OF HASTINGS
Dakota County, Minnesota
Resolution No. ,__-__~
RESOLUTION RECEIVING FEASIBILITY REPORT AND CALLING FEARING ON
CITY PROJECT 2007-3, QUIET ZONE IMPROVEMENTS
WHEREAS, pursuant to resolution 6-04-07 of the City Council dated June 4, 2007, a report has
been prepared by the City Engineer with reference to the following project:
2007-3 QiTIET ZONE IMPROVEMENTS -Concrete median removal and reconfiguration,
curb replacement, and signal and crossing arm installation at the railroad crossing
of 2"d Street, and vehicle gate installation at the railroad crossing of 3rd Street
and said report was received by the City Council of Hastings, Minnesota.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNGII. OF THE CITY OF
HASTINGS AS FOLLOWS; that
i. The City Council will consider the improvements in accordance with the report and
assess the abutting property, and assess benefits for all or a portion of the cost of the
improvements pursuant to Chapter 429 of the Minnesota. Statutes at an estimated cost of
the improvements of $68,406.00
2. A public hearing will be held on such improvements at 7:00 PM, Monday, August 6,
2007 at City Hall at 101 E. 4th Street, and the City Clerk shall give mailed and published
notice of such hearing and improvements as required by law.
ADOPTED BY THE CITY COUNCIL OF HASTINGS,IVIINNESOTA, THIS 16~ DAY
OF JULY, 2007.
Ayes:
Nays:
ATTEST:
Paul J. Hicks, Mayor
Melanie Mesko Lee, City Clerk SEAL
City of Hastings, Minnesota
Feasibility Report
Proposed City Piroject 2007-3
Quiet Zone Improvements
i hereby certify that this report was .prepared by me, or under my direct supervision,. and that I am a Registered
Professional Engineer under the laws of the State of Minnesota.
Date: July 11, 2007 ~ ,
Nicholas A. Egger
Registration No. 45834
FEASIBILITY REPORT
PROPOSED CITY PROJECT 2007-3
QUIET BONE IMPROVMENTS
PUBLIC HEARING DATE: AUGUST 6, 2007
Cit~r of Hastings
Engineering Department
CITY OF HASTINGS
Dakota County, Minnesota
Resolution No.
RESOLUTION RECEIVING FEASIBII.ITY REPORT AND CALLING HEARING ON
CITY PROJECT 2007-3, QUIET ZONE IMPROVEMENTS
WHEREAS, pursuant to resolution 604-07 of the City Council dated June 4, 2007, a report has
been prepared by the City Engineer with reference to the following project:
2007.3 QUIET ZONE IMPROVEMENTS -Concrete median removal and reconfiguration,
curb replacement, and signal and crossing arm installation at the railroad crossing
of 2nd Street, and vehicle gate installation at the railroad crossing of 3rd Street
and said reporC was received by the City Council of Hastings, Minnesota.
NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
HASTINGS AS FOLLOWS; that
The City Council will consider the improvements in accordance with the report and
assess the abutting property, and assess benefits for all or a portion of the cost of the
improvements pursuant to Chapter 429 of the Minnesota Statutes at an estimated cost of
the improvements of $68,406.00
2. A public hearing will be held on such improvements at 7:00 PM, Monday, August 6,
2007 at City Hall at 101 E. 4th Street, and the City Clerk shall give mailed and published
notice of such hearing and improvements as required by law.
ADOPTED BY THE CITY COUNCII. OF HASTINGS, MINNESOTA, THIS 161'' DAY
OF JULY, 2007.
Ayes:
Nays:
ATTEST:
Paul J. Hicks, Mayor
Melanie Mesko Lee, City Clerk SEAL
NOTICE OF PUBLIC HEARING
FOR
2007 STREET AND UTILITY IMPROVEMENTS
7:00 PM, Monday, August 6, 2007
Hastings City HaI1
To Whom Tt May Concern:
Notice is hereby given that the City Council of Hastings, Minnesota will meet in the City Council
Chambers, City Hail, 101 E. 4th Street, at 7:00 PM, Monday, August 6, 2007, to consider making of the
following described 2007 Street and Utility improvements.
PROJECT 2007-3 QUIET ZONE IMPROVEMENTS
This improvement is proposed to include:
Removal ofexisting turnaround islands west of the 2`~ Streetxailroad crossing, construction
of concrete medians on both sides of the railroad crossing, installation of railroad signals and
crossing arms, and installation of a vehicle gate on each side of the 3'~ Street railroad crossing.
LEGAL DESCRIPTIONS OF PROPERTY TO BE ASSESSED
The following properties are proposed to be assessed for these improvements:
PROJEC'T' 2007-3 OUIET ZOl~(E IMPRQVEMENT,,,~
Lot 9, Block 1, Town of Hastings
These improvements are to be considered pursuant to Minnesota Statutes, Chapter 429. The project is
proposed to be assessed on an area basis or frontage basis against properties abutting or tributary to
said improvements. The areas as specifically described herein are subject to said assessments.
The total improvement costs are estimated to be $68,406.00
The public hearing before the City Council is scheduled for Monday, August 6, 2007 at the Hastings
City Hall, 101 E. 4th St., at 7:00 PM. A reasonable estimate of the impact of the assessment wiII be
available at the hearing. Such persons who desire to be heard with reference to the proposed
improvements will be heard at such #izne and place.
Any citizen, prior to the date of the public hearing, may examvne the exhibits and documents
pertaining to the above improvements at the Hastings City Hai1,101 E. 4th St. by contacting the City
Engineer, Nick Egger, at said address or calling them at (651) 480-2334. Copies of said exhibits and
documents maybe obtained by payudg the cost for such materials.
NzcholasA. Egger, CityEngfneer
Publish in Hastings Star Gazette: July 19 and July 26, 2007
2047 STREET AND UTILITY YMPROVEMENT PROGRAM
Hastings, Minnesota
Project No.: 2007-3
Location: Locomotive Quiet Zone
Improvement: Concrete median removal and reconfiguration, curb replacement, vehicle
gate installation, and railroad signal and crossing arm installation
Initiation: City initiated project
Owners Abutting: 1
Right of Way: The project will be constructed within the existing right of way
Feasibility: This project is feasible, necessary, and cost effective, and will result in
benefits to the properties served.
Completion: Fall 2007
FUNDING SUMMARX:
1.) TOTAL. PROJECT COSTS: $ 68,406.00
(Includes 10% Contingencies, 11% for Engineering,
Legal, Administration, and Bonding Costs,
1% Assessment Roll Preparation, and 8% Capitalized Interest)
2.) FUNDING SOURCES:
Assessed to Abutting Property Owners $ 68,406.00
M
~S
~~ W
~~ ~
W
Qa b
T ~ °'
_~
LL. oU "'
~~ o
~ N
~' W
0
(~ a Q
~c
0
a
e~
w
a~i
d
x
0
0
H
U
_O
C (~1
M ~
W
a+
o a
N ~
M
~ ,~
V
~
~ _
` b4
a ~
o~
a
~, ~ ~ N N O
~ ~
b ~
N O
~ "" Z
~ ~
~
vN ,
=°-'
a
~ ~
.,~
N o
a ~ :~..
, o
~ ~ °
Vf i 2
O
b^
ti
H
w
o~
o~
'~
0>
C1
i~i.