Loading...
HomeMy WebLinkAbout03-12-09 HEDRA IV b 23rd Street CrossingMEMO To:Hastings Economic Development and Redevelopment Authority Commissioners From:Tom Montgomery Date:March 9, 2009 Re:Hwy 61 and 23 Street Intersection rd The 2000 and 2008 Comprehensive Plans addressed concerns about the Hwy 61 and 23 Street intersection by proposing installation of a traffic signal and rd construction of an access road on the east side of the intersection to connect to 21 Street, and a frontage road on the east side of Hwy 61 to address access st concerns (see enclosed drawing). The proposed improvements would help address access issues from the residential neighborhood on the west side of Hwy 61. Residents exiting this neighborhood predominantly want to head north on Hwy 61 and have very long waits for openings in the Hwy 61 traffic stream. A traffic signal at 23 Street and rd construction of an access road to 21 St. would also open up a signalized st intersection access to the Industrial Park via 21 Street and Commerce Drive, and st would make Hwy 61 access easier for Cemstone, the MnDOT truck station, and Robinson Transfer. In order for MnDOT to permit a traffic signal installation at the 23 Street rd intersection and possibly help fund up to half the traffic signal cost, a traffic study of the intersection evaluating traffic signal warrants would have to be completed by the City. MnDOT has told the City in the past that as part of any signal installation at 23 Street, an access road to the east connecting to 21 St. must be rdst constructed and the existing 21 Street intersection at Hwy 61 must be closed. st The estimated cost to hire a consultant to conduct a traffic study for the 23 rd Street intersection and prepare a concept plan and cost estimate for constructing the east access road and frontage road is $40,000. HEDRAAR CTIONEQUESTED Commissioners are asked to fund the traffic signal and conceptual road improvements study at an estimated cost of $40,000. Proposed 23rd St. Traffic Signal Proposed 21st St. Closure Proposed 23rd St. Extension East Proposed 23rd St. Traffic Signal Proposed East Hwy 61 Frontage Road  Feet 01252505007501,000