Memorandum
To: Mayor Hicks and City Councilmembers
From: Melanie Mesko Lee
Date: January 16, 2008
Re: 2008 Fee Schedule Additions
Recommended City Council Action:
Approve amendments to the 2008 Fee Schedule.
Background•
The following adjustments or additions to the adopted fee schedule are proposed by the respective
departments.
Building Safety Residential Roofmg
Residential Siding
Engineering Related fees charged to building permits (BDM)
Right-of--Way Permit Fees
Parks & Recreation S«~imining Lessons
Fire Storage and Dispensing LP
If you have any questions, please let me kno«-.
Page 1 of 1
Melanie Mesko Lee
From: Tom Bakken
Sent: Thursday, January 10, 2008 3:48 PM
To: Melanie Mesko Lee
Subject: Fee Changes
Hello Melanie,
The fees we would like to change are residential roofing and siding permits which are now $50 each, to $75
each. We are much lower than all other cities in the Twin Cities area and most only do 1 inspection where we typically
perform 2 inspections. I think the fee increase is more than justified. I'm very sorry for not getting this to you
earlier ...............Anotherthing is I met with a rep. from the ISO Organization. The 3 hour meeting went well but I need
to get her a couple more things. They want the names and occupations of all the city council members. I believe it is
because they would be part of an appeals board if someone challenged a call I made pertaining to codes. Thanks!
Tom Bakken C. B. O.
Chief Building Official
City of Hastings
101 4th Street East
Hastings, MN 55033
651-480-2342
1/16/2008
MEMO
To: Honorable Mayor and City Council
From: Nick Egger -City Engineer
Date: January 16, 2008
Re: 2008 Engineering Fees Schedule
Council is requested to adopt increases to some of the engineering related fees charged to
building permits. These fee categories are charged to building permits for activities such as final
grading/site inspection, certificate of survey review, and top of block inspections. This fee
schedule was last modified in early 2007, and the proposed increases are reflective of slight
increases in billable rates from the City's consultant BDM.
Council is also requested to officially incorporate the pre-existing Right-of-Way permit fees
schedule into the master City Fees Schedule. All of the fee categories and amounts in this
schedule have been employed by the Engineering Department for some time, but had not
previously been included in the master fees schedule.
,~.
...
~ ~ ~ ~~'
crrY of ~sruvfis
2008 SCHEDULE FOR ENGINEERING RELATED FEES ON BUILDING PERMITS
Erosion Control ............................................................................................................ $250.00 per Schedule Unit
- Charged upon issuance of building permit
- Previously not listed on fee schedule
- 2007 Rate = $250.00
Residential Lot Review of Certificate of 5urvey ......................................................... $185.00 per Schedule Unit
- On lots where approved development grading plan exists
- Charged upon issuance of building permit
- 2007 Rate = $180.00
Residential Lot Re-Review of Certificate of Survey ..................................................... $90.00 per Schedule Unit
- In cases where the builder wishes to modify lot grading after a certificate of survey has already been
reviewed and approved with the original permit
- Collected prior to re-review
- 2007 Rate = $90.00
Residential Lot Review of Certificate of Survey ......................................................... $390.00 per Schedule Unit
- On lots where an approved development grading plan does not exist
- Charged upon issuance of building permit
- 2007 Rate = $375.00
Residential Lot Foundation Top of Block Verification .............................................................. $100.00 per Visit
- Fee for one visit charged upon the issuance of building permit
- When inspection fails, an additional fee is collected prior to re-inspection
- 2007 Rate = $100.00
Residential Lot Final Grading Verification ................................................................................ $185.00 per Visit
- Fee for one visit charged upon the issuance of building permit
- When inspection fails, an additional fee is collected prior to re-inspection -see below
- 2007 Rate = $185.00
Residential Lot Final Grading Re-inspection .................................. $180.00 per site
...............................................
- *New~ -Multi-unit residential structures are treated as one unit for this procedure, and incur only one
charge. Previous practice was to assess multi-unit residential structures for the number of applicable units
according to the unit equivalence schedule (below)
- When re-inspection fails, additional reinspections incur hourly charge (see next category)
Additional Reinspections for Final Grading ................................................................................ $130.00 per hour
- *New* -When initial re-inspection has failed. Previous practice was to continue to charge the Residential
Lot Grading Verification rate at the number of applicable units according to unit equivalence schedule
(below)
- Certificate of Occupancy is withheld until fees have been collected
Engineering Fees Unit Equivalence Schedule
Number of Fees Char ed to Buildin Permit
Units Seing Constructed
Concurrently Survey Cerf~icate Review Top of Block
Inspection Erosion Control
Inspection
Single Family 1 1 1
Duplex 2 2 2
3 to 5 Units 3 3 2
6 to 8 Units 4 4 2
9 to 10 Units 5 5 3
11 to 12 Units 6 6 3
RIGHT OF WAY PERMIT FEE SCHEDULE
(ORIGINALLY ADOPTED 4/6/1992)
Test Borings ................................................................................................................ $25.00 each azea of borings
Construction in an unimproved street ................................................................. $25.00 each area of construction
Crossing via Boring or Jacking beneath street .......................................................................$25.00 each crossing
Constnzction in a gravel or surfaced roadway, perpendicular to the street .................................................. $50.00
Construction in an un-surfaced alley or grass boulevazd area ..................................................... $50.00 minimum
- An additional chazge of $50.00 is added for each 500 lineal feet of excavation trench length over
the first 500 lineal feet.
Construction in a hard surfaced alley or boulevard area, or in any street ..................................$150.00 minimum
- An additional charge of $150.00 is added for each 500 lineal feet of excavation trench length over
the first 500 lineal feet.
Initial installation of utilities (electricity, gas, telephone, cable TV, or other communications) to serve newly
platted subdivisions .................................................................................................................. $50.00 base charge
- An additional charge of $10.00 is added for each unit to be served
City of Hastings Parks & Recreation
920 W 10th St, Hastings MN 55033
Ph: (651) 480-6175
Fax: (651) 437-5396
Web: www.ci.hastings.mn.us
"Creating Community Through People, Parks, and Programs"
Date: 116/08
To: Honorable Mayor and City Council Members
From: Barry Bernstein, Parks and Recreation Director
Subject: Fee Adjustment
I have enclosed an email from Darbie Johnson, HFAC Manager. In this email she outlines
a fee adjustment for our upcoming 2008 swimming lessons.
Darbie and I did discuss this moderate change during the beginning stages of budget
planning process and then she went on maternity leave. During the process of the budget
planning, I failed to make to the modification of the fee plan that was recently approved by
council.
I am seeking City Council authorization to adjust the swimming fees for 2008. No other
pool fees are being requested to be modified. Depending on the vendor pricing for
concession goods, we will adjust accordingly.
Civic Arena Aquatic Center Youth First
2801 Red Wing Blvd. 901 Maple Street 920 W 10th Street
Ph: (651) 480-6195 Ph: (651) 480-2392 Ph: (651) 480-6182
Fax: (651) 437-4940 Fax: (651) 437-5396 Fax: (651) 437-5396
Page 1 of 1
Barry Bernstein
From: Darbie Johnson
Sent: Wednesday, January 16, 2008 7:50 AM
To: Barry Bernstein
Subject: swimming lesson fee increase
Barry,
Due to the increased program costs for swimming lessons at the Hastings
Family Aquatic Center, including instructor fees and training supplies, I
would like to propose an increase in student fees. Currently we charge
$33.00 for the Parent Child class and $36.00 for the Level classes. I would
like to propose an increase in both programs with a final fee of $37.00 for
the Parent Child class and $40.00 for the Level classes. Each session are 8
classes with the Parent Child class being 30 minutes long and the Level
classes being 40 minutes long.
Please consider this increase and contact me with any questions or concerns.
Thanks!
NWe don 't stop plQying because we get older.,. we get older because we stop playing
Darbie A.O. Johnson
City of Hastings
Park ~ Recrea tion
920 W 10th ST.
Hastings, MN 55033
651-480-6179 -phone
651-437-5396 -fax
1 /16/2008
Page 1 of 1
Melanie Mesko Lee
From: Mike Schutt
Sent: Wednesday, January 16, 2008 11:35 AM
To: Melanie Mesko Lee
Cc: AI Storlie; John Townsend
Subject: 2008 Fee Schedule
Melanie,
For the Amendments to the 2008 Fee Schedule, please include:
Storage and Dispensing Sales of Liquefied Petroleum (LP) $100.00
This proposed fee in consistent with communities who offer similar services,
Thanks,
Mike
1/16/2008