Loading...
HomeMy WebLinkAbout20080219 - VII-3VII-3 City of Hastings Parks & Recreation 920 W IO`" St~ Hastings MN 55033 Ph (b51} 4$0-b175 Fax: (651) 437-5396 Web: www ciha s.rrrnus 'Creating Community Through People, Parks, and Programs Date: 2113/08 To: Honorable Mayor and City Council From: Barry Bernstein, Pazks and Recreation Director Subject: Hastings Civic Arena -Floor Replacement Project As per the enclosed letter from Stevens Engineering, the City of Hastings held a public bid opening bid to replace the existing floor refrigeration system in the east rink. This project is to replace the current mat refrigeration system. I have enclosed the proposed estimates from Stevens Engineering dated December 20, 2007 for your review and also a summary of the bid proposals from 2/7/08. The letter from Stevens Engineering outlines the five companies that bid on this project, the three alternate bids, and the total cost of the project Alternate #1 f-510.500 of base bid price The City maintenance staff will remove the existing dasher boards and glass and the contractor is responsible to replace the dasher boards and glass when the project is complete. This will decreases the base bid price by $10,500. I am recommending to council to accept this alternate bid Alternate #2 (+$7.000 to base bid urice) t:,~urently, we have 20 horsepower motors to supply high pressure fluid movement through our piping due to the current floor mat system, The replacement motors will be % the horsepower as our existing motors and therefore operate much more efficiently and effectively. I am recommending to the council to accept this alternate bid. Alternate #3 t+$12500 to base bid urice) The concrete seater is a similar product to the product currently on the west rink floor. Oar Civic Arena staff has done very little touch up to the sealer since the west rink was installed. I am recommending to the City Council to accept Alternate #3. The total requested from the City Council for this project is $432,975 which includes all alternate bids, a S% contingency, and engineering costs. The Hastings School District, through the Joint Powers Agreement, has committed to reimburse the City for 30% of this project. The 30% reimbursement from the Hastings School District will be $129,892.50. The price does not include the replacement artificial turf. I am seeking approval to enter into an agreement with the lowest bidder, Rink Tech Intenaational, to replace and install a new refrigerated floor in the east rink. I encourage you to bring any questions or issues to my attention. Thank you! Civic Arena Aquatic Center Youth First 2801 Red 1Ning Bled. 901 Maple Street 920 V1r lOs' Street Ph: {651}480-6195 Ph: (b5I) 480-2392 Ph: (651)480-6182 Fax (65I) 437-4940 Fax: (651) 437-5396 Fax: (65I) 437-5396 February 11, 2008 STEVEN~S ENGINEERS Mr. Barry Bernstein Director of Parks and Recreation, City of Hastings 920 W l0~' Street Hasting, MN SS033-1944 RE: Ice Rink Floor Replacement Project at the Civic Arena -Bid Recommendation Our File No. 400-07--022 Dear Mr. Bernstein: On Thursday, February 7, 2008 bids were opened for the Ice Rink Floor Replacement Project at the Civic Arena. 'The attached bid tabulation lists the bids received from all five bidders. The engineer's estimate is also included based on the December 20, 2007 memo to the City. The engineer's estimate was prepared prior to opening the bids. The alternate bids for this project are: Alternate Bid No. I -Removal of dasher boards by the City. Re-installation by Contractor. Alternate Bid No. 2 - Replace three (3}existing motors with new efficient I O HP motors. Alternate Bid No. 3 -Furnish and install a concrete rink sealer on the surface of the rink floor. There was a great deaf of interest on this project even though there were only five bids submitted. The spread between. the three lowest bids on the base bid indicate that this project was bid competitively. The bids are higher than expected most likely due to the continuing rapid increase of materials such as concrete and steel. We have reviewed the lowest bid submitted by Rink Tec international and find no irregularities that would cause us to be concerned with the bid. We recommend awarding the contract with Alternates 1 through 3 because of the favorable pricing fox those alternates. A summary of the total project costs (not including financing and City adrninistr~ation) is providrd below: Item Cost ~t~~BNesign: $ 11,200 Construction Cost: $39S,S00 Construction Contingency: $14,775 Construction Observation: d S00 $432,975 Comments plus reimbursables. includes all three alternate bids. S% minimum recommended. plus reimbursables. 1656 Livingstone Road • Hudson, WI 54016 715-386-5819 •651-436-2075 - 800-822-7670 • fax: 715-386-5879 • inrww.stevensengineers.com As a reminder and as with all construction projects, we recommend you include a S% contingency in the project budget in addition to the construction cost for any changes or unforeseen sight conditions that may arise during construction The award should be based on the condition that the Contractor will execute the contract documents and return them to Stevens within Been (15) days in conformance with the bidding documents. I would be more than happy to discuss the bid results in more detail with you, your staff and the City Council If you have any questions after reviewing this letter please feel free to call us at 651.436.207S. Yours very truly, .~ ~ C. . Scott A. R~ard, P.E. Principal Enclosure Mr. Andy Baltgaivis -Bloomington Ice Gardens Friday, January 26, 2007 Page 2 S S o 0 0 N O S ~ ~ ~ lQ f~ N ~ t+ v F ~ N M N O N ~ V f p N n w ~Z e {; C . v 0 7 ! '^ ~ y c 2 ~ ~ v a Z ~ ~ S O O O '1 m 4t _ h r _ N ~ J ~ C C d S p O S m N C E m ~ a~ ~ 00 ab CO M ~ tl m mp C = N ~ ~ CNO ~ M1 n G W ~ N S O O S 6 O O O W o g te 1 M N ~ z ~ ~ ~ m ~~ w _ v° ~ S $ $$ ~ c ~ '^ fo o ° m d E y 0 a t/ N i S o O o O f °w `~ G Z m o {O m H ~ .r ° ° '~ ' ~ ~ E ~ c j a u ~ ~ ~ n nY a N o o ~ N 'O O m N V ei S . -+ N N~ CJ O O N O ~ p S O 0 G 0 O s ~ ~ Z~ ~ w ~ ti q p 8 O O S ~ fl N d p m a` S os o N n ': n o a ~ a ~ h a Z m C ~ ~ V? N N r( ~ N m 3 6 O t N f S O N ~ V' 9 m N ., av 0 bj e RR O ~.XCi S O O S S ~ ~ S S O O tp0 ~ O ~ O O N ~ N N , N o ~ d r _ ~ ~ °o 00 $ y¢ u°f '^ Lu oO c > n m ~g ` c m y ~+ u ~ ~ ` - ' ~a° g °~' 'm > w m m ~ o nn ya m .i t -o Yn mo m a` °o $ °o $ o° S ~ o ° $ ~ ~ n n c o ul N N m N M w c o f~!f ~ 1O Y o z s E ~ 0 0 o E ~ a 5 ` ' °o g o ° d ~ a s o°° ~~ '-' ~O - ~ a+ m m o ti n .n ~ ` ~ '~ a 'S m ~ ~ ~ ,~'f ~~y . E - m C j ~ ~ of . » C m N L N OC ,oy M £.' ao m 0~1 v~1 l 4 Y d r b 0 d' 6 Y Q ~ O K 0 N ~ W ° f0 U r ~ h O ~~ p ~N N r ~ `' ` u a fpm w u a G m ~~ s m 0 a F ~ C 7 3 ~ oZ - 6 ~ c ~ ~ N a '^ ° ~ U N = ID ~ c Q~ c R + „ v m ° o `~ s ~ = U11. ~ ~ .. ~ .. .. a a a m 6 i' - a` m ~ c E 90 > a m~ o a c ~ E w~ £ °' ~ ~ E v ,fo„ u m v~ :i m u` ~ T i m h E e' rc° a ~ u'. ~ a $ m a C is m ~ ; fp o y C .p YYi~ O ~ ti Ct E ~.~ ~ d m `o a r ° m ° a~ c EmY E ~~ c.vm ~ G ~v ~ a`f a°i ties `c e~c m~-~ u _ 3 an ~ 2 ~ ~ ._ m m v a O om ° ~ N M m z Steve ~ s EMGIiVEERS & PLAI+iNER5 1656 Livingstone Road 715.386.5819 Hudson, Wisconsin 54016 651,436.2075 www.stevansenuineers.com 715.386.5879 fax Memo To: Barry Bernstein, City of Hastings From: Scott WaM Re: Civic Arena -Ice Rink Floor Replacement Project - schedwie and Budget Date: I2/20/2007 Cc: Barry, . Please find below project schedule and budget for this project. Schgduie January, 7, 2008 Council approves Finai plans and to advertise for bids. City submits to paper. January 29 Open Bids February 4 Council awards bid. March 31 Shut down system, start construction October i7 End Construction, start cooling down ice rink. First day ~f ice use. ~onstraction Cost Estimate Removal and reinstallation of dashers $30,000 Demolition of floor, etc. $45,000 Ice Rink Floor $270,000 Subsoil Heat System EQuipment $15,000 Perimeter Concrete f sand $10,000 Trim Impellers (3 total} $6,000 Subtotal $376.OOQ 596 contingency ig Tota! $394,000 Let me know if you have any questions, 651.436.2075. . Scott