HomeMy WebLinkAbout20081201 - VIII-A-1VIII-A-1 MEMO To: Honorable Mayor and City Council From: Nick Egger Date: November 17, 2008 Re: Resolution Ordering Feasibility Studies for Proposed 2009 Improvement Program Enclosed for Council considerations is a resolution requesting a feasibility study for the following projects proposed for construction in 2009: ^ Project 2009-1, Industrial Park Area Improvements PROJECT 2009-I, INDUSTRIAL PARK AREA IMPROVEMENTS To address deteriorating street and drainage conditions, and to make the main street through the Industrial Park more presentable and attractive to current and future tenants of the park, the Economic Development Commission recommended Spiral Boulevard and Millard Avenue be reconstructed in 2007. However, upon initial development of plans and estimates for this project, it was determined that the City would not have the funding capacity necessary to be able to build this project in 2047, and the project was tabled until such time that adequate funding became available. In 2009, the City will have significantly more State Aid funding available in its account to assist with project costs associated with the reconstruction of Spiral Boulevard. As proposed in 2007, Spiral Boulevard would be reconstructed between Hwy 316 and Enterprise Avenue. The configuration of this street would change such that the center median ditch would be eliminated and turned into one street located in the approximate center of the right of way. The new street would have concrete curb and gutter, new storm sewers would be installed, some minor sewer and water system replacement work would take place, street lighting would be relocated or replaced as funding allows, and a landscape architect would be brought in to design and include streetscape features with the new construction. Millard Avenue would also be upgraded to a modern urban configuration with new storm sewers and curb and gutter. Anew addition to the proposed project scope is the inclusion of reconstruction on Industrial Court, which is also a street segment with poor drainage and pavement conditions. This project would also include a significant amount of new trail installation, with new segments along both Millard Avenue and Spiral Boulevard, as well as segments along TH 316 between the Civic Arena and 31St Street E. Anew trail segment would also be constructed between Spiral Boulevard and 21St Street up to the Vermillion Falls Park trail connection near Commerce Drive, traversing through a part of the wooded ravine and connecting to Veterans' Park along the way. In addition to the street, utility, landscaping, and trail improvements improvements, the proposed project scope includes providing rehabilitation to badly eroded sections of the wooded ravine, as well as storm water quality enhancement features, and storm water quantity control measures by utilizing existing topographic and configuration conditions present in the project area in order to promote these concepts. COUNCIL ACTION REQUESTED Council is requested to adopt the enclosed resolution amending the order to conduct feasibility for Project 2009-1 Industrial Park Area Improvements. CITY OF HASTINGS DAKOTA COUNTY, MINNESOTA Resolution No. RESOLUTION AMENDING THE PREPARATION OF FEASIBILITY REPORTS FOR 2009 IMPROVEMENT PROGRAM WHEREAS, it was previously proposed to construct the following improvements as part of the 2007 Street and Utility Improvement Program: - 2007-2 Spiral Boulevard Area Improvements. The proposed improvements involve reconstructing Spiral Boulevard between Hwy 316 and Enterprise Avenue and Millard Avenue from 31 S` Street to Veterans' Park. Construction of a bituminous trail line between 21 S` Street and 31 S` Street is also proposed. These proposed improvements include street reconstruction, storm sewer, bituminous trail and streetscape construction and, WHEREAS, it was previously not feasible to construct said project in the year originally proposed due to funding constraints, and that funding will be available in 2009, and WHEREAS, the project scope has been adjusted to include additional portions of the surrounding area for reconstruction as follows: - 2009-1 Industrial Park Area Improvements. The proposed improvements involve reconstruction of Spiral Boulevard between Hwy 316 and Enterprise Avenue, Millard Avenue from 31 S` Street to Veterans' Park, and Industrial Court; construction of a bituminous trail line between 21 S` Street and 3I S` Street, along Spiral Boulevard, along Hwy 316 between the Hastings Civic Arena and 31S` Street; and erosion repairs, stormwater conveyance and treatment enhancements in the wooded ravine between Spiral Boulevard and in other parts of the project area. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HASTINGS AS FOLLOWS; that The scope of the previously proposed improvement project is hereby amended to that described by the 2009-1 Industrial Park Area Improvements and referred to the City Engineer for study and he is instructed to report to the City Council with all convenient speed, advising the Council in a preliminary way as to whether the proposed improvements are feasible and as to whether they would be made as proposed or in connection with some other improvements, and the estimated cost of the improvements as recommended. ADOPTED BY THE CITY COUNCIL OF HASTINGS, MINNESOTA, THIS ls` DAY OF DECEMBER, 2008. Ayes: ATTEST: Nays: Paul J. Hicks, Mayor Melanie Mesko Lee, City Clerk (Seal)