HomeMy WebLinkAbout3 - Amended SUP - Climate Controlled Storage
Planning Commission Memorandum
To: Planning Commission
From: John Hinzman, Community Development Director
Date: January 26, 2026
Item: Amended Special Use Permit (SUP) – Climate Controlled Storage – 275 33rd Street W
– Nicholas Anderson
REQUEST
Hold a public hearing and recommend action on the Amended Special Use Permit (SUP)
application of Nicholas Anderson on property owned by NYA Industrial 31 LLC. The applicant
seeks to expand climate controlled storage through construction of a new building located within
the parking lot north of the strip mall located at 275 33rd Street W.
BACKGROUND INFORMATION
Comprehensive Plan Classification
The 2040 Comprehensive Plan designates the property as Commercial. The proposed use is
consistent with the plan.
Zoning Classification
The property is zoned C-4 Regional Shopping Center. Climate Controlled Storage is identified
as a “Use by Special Permit” (SUP) in the C-4 District.
Adjacent Zoning and Land Use
Direction Property Use Zoning Comp Plan
North Commercial - Vermillion State Bank C-4 Commercial
East Commercial - Crossroads
Church\Coborns Market
C-4 Commercial
South Commercial – Strip Mall (including
climate controlled storage)
C-4 Commercial
West Residential – Current 33 Apartments R-4 Medium Density Residence
Existing Condition
94 space parking lot.
Proposed Condition
Construction of a 15,000 s.f. climate controlled storage building within the existing parking lot.
Definition of Climate Controlled Storage Facility
The Zoning Code defines Climate Controlled Storage Facilities as:
A storage facility characterized by individual separate storage spaces which are accessible by
customers for the storing and retrieval of personal effects and household goods. Storage
spaces are climate controlled to provide regulated temperature
Original SUP for Climate Controlled Storage
A SUP for climate controlled storage was issued for a portion of the strip mall on June 21, 2021.
Approval allowed for 10,600 s.f. of the strip mall (65%) to be used as climate controlled storage.
The Amended SUP does not seek to modify the approved conditions or existing space within the
strip mall. Staff is not aware of any concerns pertaining to operation of the existing climate
controlled storage facility.
Site Plan Approval
Site Plan approval is required prior to construction. Civil engineering and architectural drawings
must be prepared to show the location of the building, parking, access, landscaping, lighting,
stormwater management, and building form and materials. The Site Plan is reviewed by the
Planning Commission and approved by the City Council.
Joint Parking Agreement
The property is subject to a joint parking agreement involving the strip mall, adjacent
Coborns\Crossroads Church building and two outlots located within the larger parking lot. The
agreement allows use of all parking spaces by all tenants and establishes maintenance
obligations. Under the agreement the property containing the strip mall and 94 space parking lot
is allocated 122 spaces of parking within the greater site. 68 of the 122 spaces are required to
meet the needs of the strip mall. The remaining 54 spaces may be reallocated to other uses
including redevelopment.
Notification and Public Hearing
Notification of the request was mailed to all property owners within 350 feet. Staff have not
received any comments at this time.
SPECIAL USE PERMIT REVIEW
Background
Hastings City Code Chapter 155.32, Subd. C.5 – allows climate controlled storage facilities as a
“use by special permit” within the C-4 Zoning District, subject to the following requirements:
• All storage activity must be conducted within a building. Exterior storage, or use of
accessory buildings, pods, trailers, and the like shall be prohibited.
• No more than 20,000 s.f. of any building shall be utilized for Climate Controlled Storage.
Special Use Permit Requirements
Special Use Permit review is outlined in Chapter 30.02, Subd. E.2.b.5 of the City Code and
subject to adherence to the following (staff analysis appears in red).
1. Ingress and egress to property and proposed structures thereon with particular reference to
automotive and pedestrian safety and convenient traffic flow and control, and access in
case of fire or catastrophe; The storage building would be located within an existing
parking lot area that provides adequate ingress and egress to the site.
2. Off-street parking and loading areas where required, with particular attention to division
(E)(2)(b)5.a. above, and the economic, noise, glare, or odor effects of the special use on
adjoining properties and properties generally in the district; Minimum parking
requirements are adequate provided that no more than 54 parking spaces are removed from
the existing parking lot.
3. Refuse and service areas, with particular reference to items divisions (E)(2)(b)5.a. and
(E)(2)(b)5.b. above; Will be reviewed as part of the Site Plan.
4. Utilities, with reference to locations, availability, and compatibility; Will be reviewed as
part of the Site Plan.
5. Screening and buffering with reference to type, dimensions, and character; Will be
reviewed as part of the Site Plan.
6. Signs, if any, and proposed exterior lighting with reference to glare, traffic safety,
economic effect, and compatibility and harmony with properties in the district; Will be
reviewed as part of the Site Plan.
7. Required yards and other open space; Will be reviewed as part of the Site Plan.
8. General compatibility with adjacent properties and other properties in the district. Property
is surrounded by commercially zoned properties and an apartment building.
Recommendation
Approval of the Amended Special Use Permit for climate controlled storage is recommended
subject to the following conditions:
1) Adherence to the conditions of approval established within the original Special Use
Permit adopted as City Council Resolution 06-25-21.
2) Adherence to the Special Use Permit requirements established under City Code Chapter
30.02, Subd. E.2b.5.
3) Securing Site Plan approval for construction of improvements.
4) All storage activity must be conducted within a building. Exterior storage, or use of
accessory buildings, pods, trailers, and the like shall be prohibited.
5) No more than 20,000 s.f. of any building shall be utilized for Climate Controlled Storage.
6) Approval is subject to a one-year Sunset Clause; if significant progress is not made towards
implementation of the proposed use within one year of City Council approval, the approval
is null and void.
Attachments
• Location Map
• Concept Plan
• Application
LOCATION MAP
Attachment A
Description of Request: This application serves as a special use permit to request approval to
build one building, approximately 14,000 Gross SF, in the existing parking lot of the parcel
located at 275 33rd St W, Hastings, MN.
This building’s primary use will be a climate-controlled storage facility, and will operate under
the same brand name as the existing storage business on this parcel, hastingsministorage.com.
There is significant demand for climate-controlled storage units, as evidenced by the current
waiting list of 20 people for a unit at the existing facility. The closest climate-controlled storage
facility is approximately 10 miles away.
The concept plan below outlines the approximate dimensions of the building. This building will
remove approximately 40-45 parking spaces, leaving 30 parking spaces for the existing
businesses. The existing dance studio only uses 5-10 parking spaces at any given time, and the
existing storage facility uses 0-2 spaces at any given time, leaving more than enough spots for
additional parking. Patrons of the Snap Fitness franchise do not park in this lot, rather they park
in the adjacent parking lot for ease of access.
City of Hastings
Community Development Department
Land Use Application
Address or PID of Property: ___________________________________________________________
Applicant Name: _______________________ Property Owner: ________________________
Address: ______________________________ Address: _______________________________
_______________________________________ ________________________________________
Phone: ________________________________ Phone: _________________________________
Fax: __________________________________ Fax: ____________________________________
Email: ________________________________ Email: __________________________________
Description of Request: ________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
If requesting site plan review of multi-family units (three or more attached), are the units intended to be
for sale or rental units? ___________________________________________________
Check Applicable Line(s) Please Note: All Fees and Escrows are due at time of application.
___ Rezone $500 ___ Minor Subdivision $500
___ Final Plat $600
___ Variance $300
___ Vacation $500
___ Special Use Permit
___ Comp Plan Amend.
___ Lot Split/Lot Line Adj.
___ House Move $500 ___ Annexation
___ Prelim Plat $500 + $5,000 escrow ___ EAW
___ Site Plan $500 + $5,000 escrow ___ Interim Use Permit
$500
$500
$75
$500 +$5,000 escrow
$500 + $5,000 escrow
$500
Total Amount Due: $ _____________ Make checks payable to City of Hastings.
Please ensure that all copies of required documents are attached.
_______________________________________ _____________________________________
Applicant Signature Date Owner Signature Date
_______________________________________ _____________________________________
Applicant Name and Title – Please Print Owner Name – Please Print
OFFICIAL USE ONLY
File # ____________________ Rec’d By: ____________________ Date Rec’d: __________________
Fee Paid: _________________ Receipt # ____________________ App. Complete _______________
Most credit cards accepted, excluding escrow payments.