Loading...
HomeMy WebLinkAboutVIII-17 Approve Budget Amendment - City Hall Dome Project Plaster RepairCity Council Memorandum To:Mayor Fasbender & City Councilmembers From:City Administrator Dan Wietecha Date:July 7, 2025 Item:2025 Budget Amendment: City Hall Historic Renovation Project, Plaster Repair Council Action Requested: Approve amendment to the 2025 Budget: $16,663.50 for plaster repair and paint as part of the City Hall Historic Renovation project. Background Information: This summer, contractor Norse Valley found peeling paint and cracked plaster not identified in the scope of the project specifications and contract. On June 20, the contractor provided several quotes totaling $16,663.50, reviewed by our architects at Miller Dunwiddie, for additional paint and plaster repair in the Community Room. I approved the quotes so work could begin promptly without delay or added costs. Financial Impact: $ 4,714.50 PR #2 –plaster and paint on south wall (cream) $ 8,452.50 PR #3, option 1 –scrape and paint on ceiling cove $ 3,496.50 PR #4 –plaster and paint on south wall (maroon) $ 16,663.50 TOTAL Committee Discussion: Not applicable Attachments: PR #2, PR #3 option1, and PR #4 VIII-17 E S T I M A T E NORSE VALLEY CONSTRUCTION, LLC. Notes: SCOPE OF WORK QTY Description Cost 1 LABOR. Pricing to perform the same plaster repair and repainƟng work at the south wall of the MeeƟng Room that is currently taking place at the north and east walls. Note: the maroon-painted alcove is excluded from this increased scope. The inside roughly 10-12” of the cove that is the lighter beige color, is also have to be included. 32 hours @ $120 per hour. Includes taping off exisƟng walls, and wood work, set up and take down. $3,840 1 MATERIALS. Tape, poly, paint, paint supplies. $350 1 Scaffold rental $300 1 Bond 5% $225 Total Total of Estimate $4,714.50 90 Main Street P.O. Box 80 Fountain, MN 55935 507-421-5913 / Cody@Norse-Valley.com LIC. # BC668486 Hastings City Hall 101 4th st e Hastings mn 55033 PR #2 This installation will be performed in complete conformance with plans, specifications and applicable code requirements. For questions or concerns, please reach out to Cody Johnson at 507-421-5913 / Cody@Norse-Valley.com Thank you for considering Norse Valley Construction, LLC. for your project needs! VIII-17 E S T I M A T E NORSE VALLEY CONSTRUCTION, LLC. Notes: SCOPE OF WORK QTY Description Cost 1 LABOR. Scrape,and paint the curved area at the top of the wall. All 4 sides. This is the angled part of the wall/ceiling only. Does not include any verƟcal walls, or flat ceiling. 60 hours figured to complete @ $120 per hour $7,200 1 MATERIALS. Tape, poly, paint, paint supplies. $400 1 Scaffold rental 1-1/2 weeks $450 1 Bond 5% $402.50 Total Total of Estimate $8,452.50 90 Main Street P.O. Box 80 Fountain, MN 55935 507-421-5913 / Cody@Norse-Valley.com LIC. # BC668486 Hastings City Hall 101 4th st e Hastings mn 55033 PR #3 option 1. Scrape and repaint curved wall/ceiling. This installation will be performed in complete conformance with plans, specifications and applicable code requirements. For questions or concerns, please reach out to Cody Johnson at 507-421-5913 / Cody@Norse-Valley.com Thank you for considering Norse Valley Construction, LLC. for your project needs! VIII-17 E S T I M A T E NORSE VALLEY CONSTRUCTION, LLC. Exclusions: Notes: SCOPE OF WORK QTY Description Cost 1 LABOR. Pricing to perform plaster repair and painting work on the south maroon wall. Will not touch the circle seal in the middle. Will tape around the yellow lines. South wall. Includes taping off existing work area to control any dust. Includes all set up to complete repair and paint to match work on south maroon wall. 24 hours @ $120 per hour $2,880 1 MATERIALS $300. Tape, poly, paint, paint supplies $150Equipment. Ladders,planks,scaffold1 $166.50Bond 5%1 Total of Estimate Total $3,496.50 90 Main Street P.O. Box 80 Fountain, MN 55935 507-421-5913 / Cody@Norse-Valley.com LIC. # BC668486 Hastings city hall 101 4th st e Hastings, mn 55033 PR # 4 – maroon south wall This installation will be performed in complete conformance with plans, specifications and applicable code requirements. For questions or concerns, please reach out to Cody Johnson at 507-421-5913 / Cody@Norse-Valley.com Thank you for considering Norse Valley Construction, LLC. for your project needs! VIII-17