HomeMy WebLinkAbout20250505 - CC Workshop MinutesHastings, Minnesota
City Council Workshop
May 5, 2025
The City Council of the City of Hastings, Minnesota met in a workshop on Monday, May 5,
2025, at 5:30 p.m. in the Volunteer Room at the Hastings City Hall, 101 East 4th Street, Hastings,
Minnesota.
Members Present: Mayor Fasbender, Councilmembers Beck, Haus, Lawrence, Leifeld,
Pemble, and Vihrachoff
Members Absent: None
Staff Present: City Administrator Dan Wietecha
Assistant City Administrator Kelly Murtaugh
Public Works Director Ryan Stempski
Public Works Superintendent Joe Spagnoletti
Finance Manager Chris Eitemiller
Mayor Fasbender called the workshop to order at 5:30 pm and welcomed council members and
staff for discussion about the Hydroelectric plant. Stempski provided an overview of past
presentations to Council via workshop and Utility Committee meetings. There was a study on the
plant done in 2023 to analyze optimal conditions and costs for future operations and
maintenance. The plant’s maintenance costs are estimated to be over 4x greater than average
reported plant. The costs are higher due to the size and complexities of the facility, with limited
access for maintenance. Additionally, the city does not have priority access to generating power.
The Army Corps of Engineers prioritizes navigation and determines when the plant can generate
power based on other needs.
Stempski noted the annual costs: insurance $200,000 with fewer insurers willing to cover; rent
$100,000; license and fees $50,000; maintenance $45,000; and one-half time of an employee.
Additionally, the city invests in dewatering at $500,000 every 4-5 years.
Annual revenue has been trending downward. Averaging the past 5 years of revenue and
expenses, projected 25 years cash flow would be a negative $10M.
Staff have been meeting with the US Army Corps of Engineers (USACE) since December 2023
to explore a solution to the future of the plant operation. There has been no interest in the private
market in purchasing the plant. Locally, there is interest on the part of the Corps in hydro power
and running the plant, but the decision is made at the federal level.
There will be a formal recommendation to Council to submit a proposal to transfer the facility to
USACE. It would also be recommended that the City surrender its FERC license. The city may
be required to decommission the plant to either leave the project in place or prepare for removal
and restoration. The preferred option would be to leave the project in place for USACE to
operate.