Loading...
HomeMy WebLinkAboutVIII-06 Approve 2025 Budget Amendment - City Hall Dome Restoration ProjectCity Council Memorandum To:Mayor Fasbender & City Councilmembers From:City Administrator Dan Wietecha Date:May 5, 2025 Item:2025 Budget Amendment: Wood Decking and Structural Supports Council Action Requested: Approve amendment to the 2025 Budget: $116,700 for wood decking, structural supports, and outrigger repair as part of the City Hall Historic Renovation project. Background Information: As contractor Renaissance Roofing is moving into the repair of the central dome, and now able to expose and examine the wood support structure, they have found need for new wood decking and support for the water table (ledge), new wood framing and waterproofing behind the band, repair or replacement of outriggers, and miscellaneous decking repair. Renaissance Roofing has provided a quote of $116,700, reviewed by our architects at Miller Dunwiddie, to perform the necessary work. Note that this is less than the per square foot unit pricing for unexposed wood repair that had been included in contract. Financial Impact: $116,700 –within project contingency Committee Discussion: Not applicable Attachment: Change Order #6 VIII-06 Project: Change Order Number: Project Number: Attn: Contract Date: The Contract is proposed to be changed as follows: Water Table A) Install ¾” plywood on skyward facing ledge (see detail 1, page 1) B) Replace up to 2 outriggers per 8 linear feet, cut to the appropriate size as needed in compromised areas. C) Install kickers as needed, cut to the appropriate size, to reinforce outriggers that will be replaced. D) Anchor outriggers and kickers to the existing framework where feasible. E) Install Simpson straps to replace missing or failed wire supports, as needed. Assuming 330 SF wood replacement with wood blocking included 43,785.00$ *Note the decking price unit initially provided is $295/SF without wood blocking - total of $97,350 Above Water Table F) Assuming 250 SF wood replacement with wood blocking included $ 53,515.00 *Note the decking price unit initially provided is $295/SF without wood blocking - total of $73,750 Main Dome G)Replace rotten/deteriorated decking on the main dome on an as-needed basis, based on field observation. Assuming 20 SF wood replacement on entire dome using cut offs from water table and backup. Note: this only includes the main part of the center dome up to Horizontal Band #2 on main dome. *Note the decking price unit initially provided is $295/SF - total of $5900 5,400.00$ Additional Items H)Additional scaffold rental to accommodate access for the above repair scope Pricing Breakdown: $ 116,700.00 Labor to remove & install wood as needed 102,700.00$ Approximately 4 man crew - 2 weeks of work Extended Scaffold Rental 8,500.00$ Tools, Supplies, Disposal 5,500.00$ 2231 Hawkey Drive 4/4/2025 Date Date Date Jake Verhagen Name (print) Name (print) Name (print) By (signature ) By (signature ) By (signature) Belvidere, IL Address Address Address Owner Representative (Firm Name)Contractor (Firm name) Owner(Firm name) The contract sum at time of this change order 3,389,910.00$ The contract sum will be Increased by this change Order in the amount of 116,700.00$ The new contract sum total, including this change order 3,506,610.00$ Renaissance Roofing, Inc. The net change by previously authorized change orders 85,115.00$ Carpentry Support Total amount: 116,700.00$ The original contract sum, including all alternates was 3,304,795.00$ The following selective repairs are necessary to stabilize the watertable shelf and provide adequate support for our new sheet metal assemblies. This scope does not include full replacement of the existing framing or support below the watertable. Above the watertable, new framing will be added around the circumference of the dome, as there is currently no blocking in place. See line items below for scope. Install new framing above the watertable shelf (at horizontal band #3/4) to provide anchoring for new sheet metal assembly, where no blocking currently exists. See detail 1 & 2, page 1 Kelly Mastin | Miller Dunwiddie 12/01/23 101 4th Street East Date:04/04/25 Hastings, MN 55033 COH2101 314/772.6222; Fax: 314/772.6224 Hastings City Hall: Historic Roofing Repair 6R CHANGE ORDER FORM 815/547.1725; Fax: 815/547.1425 www.HistoricExteriors.com BELVIDERE/CHICAGO OFFICE 1-800-699-5695 ST. LOUIS OFFICE P.O. Box 5024, Rockford, IL 61125 2306 Lemp Avenue 2231 Hawkey Drive, Belvidere, IL 61008 St. Louis, MO 63104 VIII-06 RENAISSANCE HISTORIC EXTERIORS aeiviaere,il Address By({Signature ) 2231 HAWKEY DRIVE, BELVIDERE, IL 61108 RENAISSANCE HISTORIC EXTERIORS HASTINGS CITY HALL 101 4TH STREET EAST, HASTINGS, MN 55033 SCALE: AS NOTED DRAWN BY: BW CHECKED BY: REN TEAM DATE: 3/31/2025 DRAWING TITLE: PAGE NUMBER: MAIN DOME- HB #3/4 CARPENTRY NOTES: 1 NEW CARPENTRY: HB #3/4 SCALE: 3" = 1'-0"1 NEW 3/4" PLYWOOD SHELF CONT. AROUND ENTIRE DOME. FASTENED USING SCREWS OF VARIOUS LENGTHS. SLOPED 1/8" PER FOOT NEW PLYWOOD BLOCKING NEW 2X BLOCKING SPACED ROUGHLY 16" O.C. ATTACHED TO EXISTING BACKUP USING SCREWS OF VARIOUS LENGTHS NEW 3/4" PLYWOOD UPPER SHELF TO MATCH SLOPE OF ORIGINAL EXISTING CONDITIONS NOT SHOWN FOR CLARITY. UP TO 2 OUTRIGGERS PER 8' TO BE REPLACE, AS NEEDED NEW 2X SLOPED BLOCKING SPACED ROUGHLY 16" O.C. TYP AROUND ENTIRE CIRCUMFERENCE OF DOME. USED TO CREATE SLOPE TO PLYWOOD UPPER SHELF EXISTING DECKING BEHIND NEW WOOD ASSEMBLY NEW PLYWOOD ADDED FOR SOLID BACKING OF 2X BLOCKS. AREAS CURVED TO MATCH RADIUS OF DOME NEW PLYWOOD ABOVE 2X BLOCKS DRAWING NOTES: - VARIOUS SIZE OF SCREWS TO BE USED FOR NEW CARPENTRY ASSEMBLY - DO NOT SCALE FOR DIMENSIONS OUTLINE OF METAL SHOWN. ATTACHMENT METHODS TBD AND WILL BE SHOWN IN FUTURE SHOP DRAWINGS NEW CARPENTRY: HB #3/4 ISO SCALE: N.T.S 2 GENERAL OUTLINE OF METAL SHOWN. OVERALL SHAPE TO MATCH ORIGINAL OUTLINE OF CARPENTRY SHOW. NEW CARPENTRY AROUND ENTIRE CIRCUMFERENCE OF DOME EXISTING RIB BASE EXISTING RIBS EXISTING DECKING SHOWN DECKING REPAIRS, AS NEEDED ON MAIN DOMEVIII-06 <<<<<<<<<<<<<£