Loading...
HomeMy WebLinkAboutVIII-10 Accept Proposal and Authorize Work - Police Department Air Handler Reconfiguration City Council Memorandum To: Mayor Fasbender & City Council Members From: Justin Fortney, City Planner Date: March 3, 2025 Item: Accept Proposal and Authorize work - Police Department Air Handler Reconfiguration COUNCIL ACTION REQUESTED The Council is requested to authorize the City to engage with a mechanical company to reconfigure the Police Department’s air handler. BACKGROUND INFORMATION The city has recently made HVAC upgrades including new boilers and reheat coils to remove high humidity from City Hall. These improvements could also benefit the Police Department, which has high humidity levels. This will require the reconfiguration of the air handler by reversing the order of its operation. QUOTE REVIEW Both companies are qualified to perform proposed work and have worked on the city’s HVAC system before. Both quotes will provide the same service, but Total Mechanical Services Inc quote includes replacement of the air handler drain pans. They are likely going to require replacement at a cost more than the $562 difference in quotes. STAFF RECOMMENDATION Staff is recommending that the City Council accepts the proposal by Total Mechanical Services Inc in the amount of $46,112. ATTACHMENTS QUOTES Mechanical Companies Total Recommendation Total Mechanical Services Inc - St. Paul Park, MN $46,112 Gilbert Mechanical Contractors, LLC - Minneapolis, MN 55439 $45,550 VIII-10 TOTAL MECHANICAL SERVICES, INC. | 420 BROADWAY AVE. ST. PAUL PARK, MN 55071 | P 651.768.9367 | WWW.TOTALMECH.COM November 8, 2024 Hastings Police Department 150 3rd St E Hastings, MN 55033 Attn: Charlie Judge Email: cjudge@hastingsmn.gov RE: Hastings PD – AHU Heating and Cooling Coil Relocation. (2) New Heating Coils, (2) New Cooling Coils Total Mechanical Services, Inc. Proposal # 4375 The undersigned does hereby provide the following proposal for the Scope of Work in accordance with the Project Documents and Proposal Clarifications as stated herein. We will provide all necessary labor, tools, and materials to complete the work as detailed below. Scope of Work: • Remove heating and cooling from AHU located in PD mechanical room. • Install (2) new heating coils • Install (2) new cooling coils • Extend cooling coil welded stand, condensate pan, and condensate drain. • Install new metal flashing around heating and cooling coils • Pipe heating and cooling coils in new location • New piping insulation Exclusions: • Overtime • Draining of heating and cooling systems. Clarifications: Our proposal is based on the existing equipment and hardware is in reasonably good condition for disassembly and reuse. Deviations from the existing conditions could result in additional charges for labor, tooling and/or replacement. All work is assumed to be performed during normal business hours (7AM – 3:30PM). Pricing: The cost to complete the services listed above will be ………………………………………………………………………. $46,112.00 Sincerely, TOTAL MECHANICAL SERVICES, INC. Travis Zins Account Manager 651-408-3095// tzins@totalmech.com VIII-10 TOTAL MECHANICAL SERVICES, INC. | 420 BROADWAY AVE. ST. PAUL PARK, MN 55071 | P 651.768.9367 | WWW.TOTALMECH.COM Our terms are net 30 days, with a 1-1/2% per month finance charge applied to all past due invoices. Based upon a credit analysis, we may request a partial or complete payment before proceeding with the work. We warrant our repair work for 90 days. We warrant new equipment installations for one year. The above stated warranties do not enhance, extend, reduce or diminish any manufacturer warranties. This proposal and the pricing shown is good for 45 days VIII-10 TOTAL MECHANICAL SERVICES, INC. | 420 BROADWAY AVE. ST. PAUL PARK, MN 55071 | P 651.768.9367 | WWW.TOTALMECH.COM ACCEPTANCE AGREEMENT By signing below, Customer authorizes Total Mechanical Services, Inc. to perform the Scope of Work as proposed above subject to the following Terms and Conditions. This Acceptance Agreement shall be binding on both parties until a mutually acceptable contract is executed, if any. Terms and Conditions: 1. The Acceptance Agreement Amount will be the amount proposed by Total Mechanical Services, Inc. 2. Customer agrees to make payments to Total Mechanical Services, Inc. within (30) calendar days from the date of each invoice. If the duration of the Scope of Work is greater than one month, invoices for work completed will be submitted to the Customer on a monthly basis. 3. Customer will provide Total Mechanical Services, Inc. reasonable access to the work areas, including the use of existing facilities and utilities by Total Mechanical Services, Inc. and its subcontractors. 4. Total Mechanical Services, Inc. shall not be liable to the Customer for any delay, loss or damage caused in whole or in part by the unavailability of machinery, equipment, or materials; strikes, lockouts, or other labor unrest; riots, wars, or other civil unrest; acts of God, fire, theft or malicious acts; corrosion, normal wear and tear or any other cause beyond the control of Total Mechanical Services, Inc. 5. This Acceptance Agreement shall be governed, interpreted and enforced under the laws of the State of Minnesota. 6. Customer may order changes in the Scope of the Work upon the mutual agreement of an equitable adjustment in the Acceptance Agreement Amount. 7. The schedule for the performance of the Scope of Work shall be established by the mutual agreement of both parties and shall be binding on both parties. 8. Total Mechanical Services, Inc. shall maintain insurance of such types and in such amounts as is commercially reasonable in connection with its Work hereunder and will provide Customer a Certificate of Insurance evidencing such coverage upon request. Total Mechanical Services , Inc.’s liability shall be limited to available insurance proceeds. Building owner is to carry fire, property and other necessary insurance. Building owner is to provide safe work area with free access to carry out above work. 9. The Customer is responsible for all asbestos, lead and other hazardous material testing, removal, and subcontractors. 10. Upgrading of existing systems to meet the most current codes is limited to the scope of work detailed above. 11. All Work shall be performed during normal workday (7:00 am to 3:30 pm M-F) on straight time unless otherwise noted. 12. Drain down and refilling of piping systems by others unless noted above. 13. On all accounts over (30) days, Customer agrees to pay all reasonable collection fees and/or attorney fees. All accounts past due are subject to interest at the maximum legal rate. 14. Market Condition Alert: Due to volatile market conditions, all material quotes have limited validity, which may be subject to price increases pasted along to Customer. 15. THIS PROPOSAL IS CONTINGENT ON A LACK OF IMPACT BY NATIONAL PANDEMIC EMERGENCY. Due to the existing coronavirus pandemic and resulting consequences, which include shut downs of definite and indefinite durations by the federal, state and local governments, quarantines, business shut downs, transportation interruptions, disruptions in the supply chain of certain materials, supplies or equipment, disruptions to public services, temporary suspensions of work on site or the unavailability or reduced availability of manpower, the parties agree if Total Mechanical Services is hindered, prevented or delayed, at any time, in the commencement or progress of the work for a cause arising from or related to the Pandemic, including but not limited to any of the examples above, Total Mechanical Services shall be entitled to an extension of the Contract time. Furthermore, to the extent the project is impacted by increased costs associated with the high demand for specified materials or any proposed substitute approved by Contractor or Owner, or if the project is suspended or experiences any other similar cost increase outside the control of Total Mechanical Services, Total Mechanical Services shall be entitled to additional compensation. ACCEPTANCE OF PROPOSAL Total Mechanical Services, Inc.’s Proposal and the Terms and Conditions above are hereby accepted by Customer. Total Mechanical Services, Inc. is authorized to proceed with the Scope of Work as provided herein. Payment will be made as outlined above. ___________________________________________ _____________________ Authorized Signature Date ___________________________________________ _____________________ Printed Name Title VIII-10 Gilbert Mechanical Contractors, LLC Gilbert Electrical Technologies 5251 West 74th Street Minneapolis, MN 55439 Phone: (952) 835-3810 Fax: (952) 835-4765 HVAC ● Plumbing ● Electrical ● Controls ● Fire Protection ● Service Company: City of Hastings Date: 9/23/24 Street: 101 4th Street East Project: Hastings Police Dept. AHU City/State: Hastings, MN 55033 Heating & Cooling Coil Changeout ATTN: Charlie Judge Pages 1 Proposal Gilbert Mechanical Contractors will provide the necessary labor and materials to complete the following at 101 4th St. East, Hastings, MN: Police Department AHU Heating and Cooling Coil Swap and Changeout: Gilbert to swap the (2) heating and (2) cooling coils in the Police Department Air Handling Unit. Work to specifically include: · (2) new heating coils and (2) new cooling coils of the same capacity as existing coils. · Valve off, isolate, and drain down cooling and heating system as needed. · Cut out existing stacked (2) heating and (2) cooling coils. Dispose of existing coils. · Install (2) new heating coils on the cooling side, and (2) new cooling coils on the heating side. · Modify heating and cooling piping as needed. · Reinsulate piping modifications. · Rigging, labor, material, taxes. · Check/test/start and one year labor & material warranty. · Coil lead time: 3-4 weeks. AMOUNT: $45,550.00. ***Note: Coil specs and calculations done by customer. Gilbert cannot guarantee the swapping of the coils will achieve the dehumidification that the City is requiring. Gilbert’s recommendation is to replace the coils instead of trying to reuse existing coils due to age and unknown condition of the coils. General Pricing Note: Due to the current volatility in material & equipment costs. Gilbert Mechanical reserves the right to adjust the material & equipment cost of this project up (or down) in direct proportion to the escalation (de-escalation) of the material & equipment costs at the time of installation. Back-up data will be provided if necessary to support any changes in cost. Beyond the volatility of material, this project has been priced based on labor costs through 12/31/24. Exclusions: Work to be performed during normal working hours. Anything not listed in the above scope. Payment Terms: Project will be invoiced monthly as work progresses. Invoice terms are net 30 days. Proposed By: Accepted By: Gilbert Mechanical Contractors, LLC ______________________Date: 9/23/24 ______________________ Date:_________ Bryce Vee Project Manager Print Name:__________________________ VIII-10