HomeMy WebLinkAboutVIII-09 Approve 2025 Pavement Management Projects in Accordance with the South Metro Joint Powers agreement - Traffic Markings & Crack Seal City Council Memorandum
To: Mayor Fasbender & City Council Members
From: John Caven – Assistant City Engineer
Date: February 10, 2025
Item: Approve 2025 Pavement Management Projects in accordance with the South Metro Joint Powers
Agreement
Council Action Requested:
The council is requested to approve the 2025 Traffic Marking Program and 2025 Crack Seal Program
accordance with the South Metro Joint Powers Agreement.
Background Information:
The City of Hastings has participated in the Joint Powers Agreement (JPA) since 2011. The JPA is
administered by the City of Burnsville and it represents 20 cities, counties and townships. The benefit to
joining the JPA includes:
Reduce project administration for preparation of bid documents and bidding services
More favorable bid pricing through its increased quantity
The City of Hastings provides quantities for Traffic Marking and Crack Seal.
Traffic Marking Program
o The program consists of re-painting up to 12 miles of faded centerline, fog lines,
directional arrows, symbols, crosswalks and stop bars with appropriate yellow or white
paint. The mainline striping adheres to the adopted 2007 Traffic Marking Policy and
2017 Crosswalk Policy but adds those existing streets commonly striped that contain high
traffic volumes, unique geometry, or close proximity to schools.
Crack Seal Program
o The program consists of crack sealing up to 6 miles of streets and one parking lot.
Cracks greater than or equal to a quarter inch will be routed and sealed.
Financial Impact:
In 2025, a similar number of cities and counties are anticipated in joining the JPA. Unit prices will likely
stay steady from last year’s prices. Maintaining participation in the JPA will help keep costs as low as
possible.
The cost estimate for the Traffic Marking Program remains below the budget amount of $20,000. The
cost estimate for the Crack Seal Program remains below the budget amount of $15,000. These two
programs will be paid out of the Street Marking Budget and Upkeep to Grounds budget respectively.
Costs estimates include the 1.5% project administration fee paid to Burnsville for administering the bid
process.
Attachments:
2025 Traffic Marking Plan
2025 Crack Seal Plan
VIII-09
PLEASANT DR
33RD ST
31ST ST
CANNON ST
H
W
Y
3
1
6HWY 61
36TH ST
PLEASANT DR15TH ST
S OUT HVIEW DR
PINE ST
C S A H 4 6/4 7
CSAH 46/47
3
1
S
T S
T
HWY 55
NTAGE RD
U
F R O
T HSO
WESTVIEW DR
15TH ST
HWY 61
2ND ST
4TH ST
TYLER ST
CSAH 42
FEATHERSTONE RD
RA
M
S
E
Y
S
T
VILLAGE
TR
RIDGE DR
N
ORTH
SOUTH FRONTAGE RD
4TH ST
L
O
C
K A
N
D D
A
M R
D
1ST ST
3RD ST
18TH ST
CSAH 91
LYNN WAY
BAILEY ST
SI
B
L
E
Y
S
T
11TH ST
12TH ST
13TH ST
PARKLETS (TYP)
HWY 55
10TH ST
LOUIS LN
NORTH FRONTAGE RD
INSET B: UBC BUILDING
INSET A: DOWNTOWN AREA
ASHLAND ST
16TH ST
GENERAL SIEBEN DR
PINE ST
TO PROPERTY LINE
TO PROPERTY LINE
INSET C: 16TH ST
INSET D
CENTERLINE
FOG LINES
LEGEND
"HANDWORK"IE. ARROWS, HATCHING
NOTES:1) $19,700 is maximum budget.Contact City prior to exceeding budget.2) Paint fog lines only when marked on plans3) Timing Conflicts
4) Contractor is responsible to post no parking signs(if needed)5) Crosswalks are to be painted 12" (parallel lines) or
or 2'x3' (blocks). Match existing style/size.
7) Contractor must complete task once they starta) Mainline: Within two daysb) Symbols: Within two days
6) Provide City a courtesy call prior to striping
ON-STREET PARKING
8) Direct all questions to John Caven. Provide 48 hour
a) 651.480.2369
b) jcaven@hastingsmn.gov
c) On-Street/Parking Lots: Within three days
A) Downtown Area1)Traffic is heaviest during day and early eveningConsider striping prior to 10am.2) Some businesses install on-street parklets(restaurant seating) between April and October.Paint striping to maximum extent practicable.
B) UBC Building1) Striping requires 48 hour advance notice. to coordinate sweeping & vehicle removal.2) Striping of parking stalls is inside the building. John Caven will coordinate with Police Dept for access in secured area.
4) No striping allowed on May 13th.5) Striping Monday through Friday preferred.
advance notice.
3) Access through door is 13ft x 13ft
C) 4th St: Prairie St to River St1) Parking is heaviest during the day D) 16th St: Pine St to Maple St
1) Parking is heaviest in the evening
VIII-09
DRIVEWAYDRIVEWAY
DRIVEWAY
SIDEWALK
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
16TH ST
PIONEER PARK
PINE ST
MAPLE ST
3RD ST
4TH ST
2ND ST
ALLEYALLEY ALLEY
ALLEYALLEY ALLEY
ALLEY
SI
B
L
E
Y
S
T
RA
M
S
E
Y
S
T
TY
L
E
R
S
T
MISSISSIPPI RIVER
1) Timing ConflictsA) Downtown Area1)Traffic is heaviest during day and early eveningConsider striping prior to 10am.
2) Some businesses install on-street parklets(restaurant seating) between April and October.
Consider striping prior to 3pm.
2) Parallel ParkingA) "Tees" are 7ft x 4ft. "L's" are 7ft x 2ft. Spacing is 22ft.
B) City of Hastings staff to lay out new locations of"tees" on the following locations1) Sibley St: Alley to 2nd St, 2nd St to 3rd St2) Ramsey St: Alley to 2nd St, 2nd St to 3rd St
3) Tyler St: Levee Alley to 2nd St, 2nd St to 3rd St
3) On-Street ParkingA) Contractor responsible for installing "no parking signs"
as vehicles park 24/7.(if needed). Striping "half at time" may be considered
4) City Contact: John Caven. Provide 48 hour notice.A) 651.480.2369B) jcaven@hastingsmn.gov
NOTES:
4TH ST
B)16th St: Pine St to Maple St (Pioneer Park)1) Traffic is heaviest during evening.
Paint striping to maximum extent practicable.
C) 4th St: Prairie St to River St1) Traffic is heaviest during day.
INSET A INSET D
INSET C
VIII-09
NO TRAFFIC MARKINGS
ON
EAST HALF
DOOR13' W X 13' H
(ENTER)
DOOR
(NORTH)
(SOUTH)
4TH ST
BAILLY ST
ALLEY
100ft x 100ftBuilding
A) Timing / Access1) Striping requires 48 hour advance notice. to coordinate sweeping & vehicle removal.2) Striping of parking stalls is inside the building. John Caven will coordinate with Police Dept for access in secured area.3) No striping on May 13th.4) Striping Monday through Friday preferred.
Notes
C) City Contact: John Cavena) 651.480.2369
b) jcaven@hastingsmn.gov
5) Access through door is 13ft x 13ft
B) Parking stalls 4" x 20ft. 15ft drive lane.
VIII-09
PLEASANT DR
GENERAL SIEBEN DR
15TH ST
C S A H 4 6/4 7
HWY 55
15TH ST
HWY 61
HWY 61
1ST ST
CSAH 42
FEATHERSTONE RD
PINE ST
RIDGE DR
N
O
RTH
4TH ST
SI
B
L
E
Y
S
T
10TH ST
PLEASANT DR
4TH ST
NTAGE RD
U
F R O
T HSO
WESTVIEW DR
PINE ST
3RD ST
RIVER ST
5TH ST
6TH ST
7TH ST
11TH ST
12TH ST
13TH ST
OAK RIDGE
LN
BA
I
L
L
Y
S
T
CROSSWALK: PARALLEL
CROSSWALK: BLOCK
QTY: 34
QTY: 1VIII-09
PLEASANT DR
HWY 55
15TH ST
HWY 61
HWY 61
2ND ST
4TH ST
TYLER ST
RA
M
S
E
Y
S
T
3RD ST
BAILEY ST
SI
B
L
E
Y
S
T
10TH ST
PINE ST
ASHLAND ST
SFR NEW STOP BAR
HWY 55
W
E
S
T
VIE
W
DR
S F R
STOP BAR(QTY: 24)VIII-09
BOHLKENCT
VALLEY LN
FLAGSTONE DR
BOHLKENCT
HWY 55 HWY 55
15TH ST
GENERAL SIEBEN DR
FRONTAGE
4TH ST
HWY 61
ENTERPRISE AVE
31ST ST
3RD ST
4TH ST
C SAH 46
HWY 316
SPIRAL BLVD
FOREST ST
RD
GENERAL SIEBEN DR
PLEASANT DR
PRAIRIE ST
ASHLAND ST
NORTHRIDGEDR
15TH ST
HWY 6115TH ST
FEATHERSTONE RD
PLEASANT DR
SOUTH FRONTAGE RD
(WALMART)
10TH ST
18TH ST
WYNDHAM HILL
UNNAMED RD
PL
CARLETON
NORTH
CARLETONDR
LN DR
WYNDHAMPL
MEADOWVIEW TR
STONEGATERD HILLTOP LN
PLEASANT DR
5TH ST
LOCK AND DAM RD
JAYCEE PARKPARKING LOT
HWY 55
KING
RR
MIDAS LN
CR91
GLACIER WAY
CANNON ST
36TH ST
HWY 61
CANNON ST
BOHLKEN DR
H
AC
KB
ER
RY DR
31ST ST
C SAH 46
CENTURY DR
WESTVIEW DR
HONEYSUCKLELN
(CHIP SEALED)
(2ND CRACK SEAL)
(ROUT & SEAL WHERE POSSIBLE)
AREA 1
AREA 3AREA 4 AREA 5
AREA 2
Notes:1) $15,700 is maximum budget. No payment
Typ: 2nd time crack seal.* Road not chip sealed.
Typ: 1st time crack seal. Road not chip sealed.
Typ: 1st time crack seal.* Road not chip sealed.*
Typ: 1st time crack seal. Road not chip sealed.
Typ: 1st time crack seal. Parking lot not chip sealed.
will be made for crack seal applied overthis budget amount.2) The entire Area 1 must be crack sealedbefore proceeding to Area 2. Area 2 beforeArea 3, etc.3) If the budget runs out in the middle of anArea, please document location and informCity.4) Contractor may start anywhere within agiven Area. MNDOT 3725
5) Rout & Seal new cracks. If sealed in thepast, then Blo & Go is acceptable.
6) Contractor is responsible for "no parking"signs, if needed, particularly for parkinglots. 7) No crack sealing between June 30 andJuly 5, and July 21-26 preferred.
9) Any questions please call City of Hastings:
John Caven: 651.480.2369jcaven@hastingsmn.gov
8) Contractor to provide quantities broken outper AREA. City will verify quantities priorto payment.
AREA 6 Typ: Multi-crack seal. Road chip sealed.*unless noted otherwise on plan
Provide courtesy phone call 24 hours inadvance.
10) Contractor must complete task withintwo days, once begin.
VIII-09