Loading...
HomeMy WebLinkAboutVIII-07 Authorize Signature - Phase II Environmental Site Assessment of 1292 North Frontage Road City Council Memorandum To: Mayor Fasbender & City Council Members From: Ryan Stempski, P.E. – Public Works Director Date: February 3, 2025 Item: Accept Proposal and Authorize Work – Conduct Phase II Environmental Assessment of 1292 North Frontage Road Council Action Requested: The Council is requested to authorize a contract with WSB for conducting a Phase II Environmental Site Assessment (ESA) of 1292 North Frontage Road. Background Information: To continue with due diligence for the purchase of the Central WTP site (1292 North Frontage Road), the City Council authorized a Phase I ESA at the January 6th City Council Meeting. The Phase I ESA has been completed and recommends a Phase II ESA to investigate the identified Recognized Environmental Conditions (RECs). The Phase II ESA would include the collection of environmental samples for laboratory analysis in accordance with the anticipated site plan. If contamination is found within the redevelopment area, a Development Response Action Plan will need to be prepared and approved by the MPCA Brownfields Program prior to site development. Once authorized, WSB estimates a draft report to be provided within sixty days. Financial Impact: The estimated cost of $19,880 for these services will be fully reimbursed by the MPCA Planning and Design Grant. The work will be completed on a time and material basis. Attachments:  WSB Proposal for Phase II Environmental Site Assessment VIII-07 70 1 X E N I A A V E N U E S | SU I T E 3 0 0 | MI N N E A P O L I S , M N | 55 4 1 6 | 76 3 . 5 4 1 . 4 8 0 0 | WS B E N G . C O M January 30, 2025 Mr. Ryan Stempski City of Hastings – Public Works 1225 Progress Drive Hastings, MN 55033 Re: Scope of Work and Cost Estimate – Phase II Environmental Site Assessment Proposed Hastings Wastewater Treatment Plant #2 1292 North Frontage Road Hastings, MN 55033 Dear Mr. Stempski: As requested, outlined below is a scope of work and cost estimate to complete a Phase II Environmental Site Assessment (ESA) at 1292 North Frontage Road in Hastings, Minnesota (Site). The Site is currently developed as a commercial building, housing a pizzeria, dance studio, and an empty office space. WSB completed a Phase I ESA report for the Site dated January 23, 2025 (2025 Phase I ESA) which identified the following recognized environmental condition (REC) and one Business Environmental Risk (BER) associated with Site: • REC-1: Petroleum Leak Site (LS0016266) • BER-1: Potential for asbestos and regulated materials in structure WSB understands a new wastewater treatment plant is proposed at the Site which will include demolition of the existing Site building and construction of a new building that will measure approximately 110’ x 140’, as well as a stormwater retention pond and the installation of two underground backwash tanks. The purpose of the Phase II ESA is to determine if the REC identified in the 2025 Phase I ESA resulted in soil and/or soil vapor impacts at the Site requiring special management during redevelopment. Groundwater is anticipated to be at a depth of 35 feet or greater and the collection of groundwater samples is not included in this investigation. WSB understands the City of Hastings (City) will use the Phase II ESA report for environmental planning and budgeting purposes. The following tasks are proposed as part of this scope of work: SOIL BORINGS WSB will advance push-probe soil borings at the Site and collect soil and soil vapor samples for laboratory analysis. The proposed locations are shown on the attached Figure. The soil boring activities will include: • Complete private and public utility locates. • Advance up to eight mechanical push-probe borings to 12 feet below grade for the collection of soil samples. • Advance up to one source soil vapor boring to eight feet below grade and up to three receptor soil vapor borings to a depth of four feet for the collection of soil vapor samples. • Screen soils using a photoionization detector (PID) equipped with a 10.6 eV lamp. • Record general soil classifications/observations on a field log. • Seal borings per Minnesota Department of Health (MDH) requirements. SOIL, GROUNDWATER, AND SOIL VAPOR SAMPLING WSB will collect soil and soil vapor samples during the assessment. Up to two soil samples may be collected from each boring for laboratory analysis. Two samples will be collected from a boring VIII-07 Mr. Ryan Stempski January 30, 2025 Page 2 if there is evidence of contamination. Otherwise only one sample will be collected from that boring. The samples will be collected in accordance with Minnesota Pollution Control Agency (MPCA) guidance and analyzed by the laboratory under a 7-10 business day standard turnaround timeframe. The samples will be analyzed for compounds commonly associated with the RECs identified in the 2024 Phase I ESA and in general accordance with MPCA Guidance documents. The soil and soil vapor samples collected from the borings will be submitted to an MDH-certified analytical laboratory for analysis of the following: Soil • Diesel range organics (DRO) by the Wisconsin Modified Method (up to 20 samples) • Gasoline range organics (GRO) by the Wisconsin Modified Method (up to 20 samples) • Volatile organic compounds (VOCs) by EPA Method 8260D (up to 20 samples) • Lead by EPA Method 6020B (up to 20 samples) Soil Vapor • VOCs by EPA Method TO-15, full scan (up to 4 samples) • Fixed gases (methane, oxygen, and carbon dioxide) via either EPA Method 3C or ASTM method D1946 REPORTING WSB will summarize the results of the Phase II ESA in a final report. The report will include the following: • Scope of work • Sample location map • Sample methods and procedures • Results tables and comparison to applicable criteria • Investigation results • Recommendations (if requested by the City) and Conclusions • Boring logs and laboratory analytical reports as attachments ASSUMPTIONS The following items are assumed for this scope of work: • Site access will be facilitated by the City. • Up to two remote meetings with the City to discuss the work and results are included. • Groundwater is not encountered during boring advancement at the Site. If groundwater is encountered, WSB will contact the City to discuss the collection and analyses of groundwater samples. • The soil and soil vapor borings will be completed at exterior locations. • The estimated cost includes up to eight borings, 16 soil samples and four vapor samples for the proposed analyses. • The estimated cost does not include EDGE/EQuIS data submittals to the MPCA. This may be required if the Site is enrolled into the MPCA Brownfield Program and can be done at that time. • We understand the proposed new building footprint totals approximately 15,400 square feet. If the building plans change at the time of the investigation, the number and locations of soil vapor borings may need to be revised. • The City will provide WSB with electronic building/construction plans prior to drilling to ensure the soil and soil vapor borings target the proposed building footprint and excavation areas. • WSB will contract an analytical testing firm for soil and soil vapor analysis. • WSB will contract an environmental drilling firm to complete the soil and soil vapor borings and the field investigation work will be completed in two days. VIII-07 Mr. Ryan Stempski January 30, 2025 Page 3 • Laboratory samples will be analyzed under a standard 7-10 business-day turnaround timeframe. • The Phase II ESA will be limited to the scoped boring locations and the magnitude and extent of contamination (if discovered) may not be defined. • A final report will be delivered within two weeks of receiving laboratory analytical results. • The City will provide one round of review/comment of the report. ESTIMATED COST The estimated cost to perform the above-described Phase II ESA is $19,880. The work will be completed on a time and materials basis in accordance with the attached 2025 Rate Schedule. ACCEPTANCE This proposal represents our understanding of the project scope. All work completed through this proposal will be governed by the Professional Services Agreement between the City and WSB dated November 2, 2023. If the scope and estimated cost are acceptable, please sign on the space provided and return one copy to WSB. We are available to begin work once we receive signed authorization. WSB appreciates the opportunity of being considered for this project and we look forward to providing our professional services to you. If you have any questions about this proposal, please feel free to call Peter Moore at 612.599.4940. Sincerely, WSB Devin Gallagher Peter J. Moore, PG Graduate Environmental Scientist Senior Project Manager _____________________________________________________________________________ Enclosures Figure- Proposed boring locations WSB 2025 Rate Schedule SIGNATURE I hereby authorize the above scope of work, schedule, and cost. _________________________________________ Name (Print) _________________________________________ Signature _________________________________________ Date VIII-07 G G G G G G G G OH OH OH OH OH G G OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH OH S RIM:859.36 SE 4 PVC852.16INV: S 12 RCP852.16INV: E 12 GP852.11INV:INV:INV:INV: S RIM:854.51 S 4 PVC846.71INV: E 12 RCP846.76INV:INV:INV:INV:INV: RIM:855.70 SE 12 RCP852.75INV: SUMP851.70INV:INV:INV:INV:INV: RIM:855.59INV:INV:INV:INV:INV:INV:MBMB 11" 7" AC 13" 9" E TNH ELEV: 861.07 E CO IRR TNH ELEV: 863.26 RD 10"9"10" E HH 10" 11" 11" 12" 8" 7" 7" 7" 10" 7" 7" 19" 8" 8" RD CO E IRR 10" 9" RIM:860.46INV:INV:INV:INV:INV:INV: 9" 9" 9" 10" 9" 9" 9"4INX4" MB 9" MB 10" RD IRR 6" 9" 9" 10" 8" 9" 6" 4"2" 5" 8" 85 5 860 85 1 85 2 85 3 85 4 85 6 85 7 85 8 85 9 860 856 85785 8859861 86 0 86 0 8 5 8 85 8 85 9 850 855 849 851 852 853 854 856 12" DIP WM 12" DIP WM 12 " D I P W M 6" D I P S E R V 1 2 " S T O R M 8" SAN S S SHOWN 024226-000 WSB PROJECT NO.: SCALE: PLAN BY: DESIGN BY: CHECK BY: SHEET I H E R E B Y C E R T I F Y T H A T T H I S P L A N , S P E C I F I C A T I O N , OR R E P O R T W A S P R E P A R E D B Y M E O R U N D E R M Y DI R E C T S U P E R V I S I O N A N D T H A T I A M A D U L Y LI C E N S E D P R O F E S S I O N A L E N G I N E E R U N D E R T H E LA W S O F T H E S T A T E O F M I N N E S O T A . LI C . N O : DA T E : RE V I S I O N S NO . DA T E DE S C R I P T I O N WA T E R T R E A T M E N T PL A N T N O . 2 CI T Y O F H A S T I N G S , MI N N E S O T A K: \ 0 2 4 2 2 6 - 0 0 0 \ C a d \ P l a n \ 0 2 4 2 2 6 - 0 0 0 - C - S I T E - W T P 2 . d w g 1 / 9 / 2 0 2 5 1 1 : 1 7 : 2 1 P M JSC SGNWWS 57 8 1 4 JO N A T H A N S . C H R I S T E N S E N , P . E . SCALE IN FEET 0 N SITE PLAN C-01 20 40 LEGEND > EXISTING SANITARY STRUCTURES PROPOSED BITUMINOUS (EDGE) EXISTING STORM STRUCTURE EXISTING STORM SEWER PIPE>> 1200 PROPOSED GRADE LINE EXISTING LOT LINE / RIGHT-OF-WAY LINE EXISTING GRADE LINE F G C E || E ST EXISTING POWER POLE EXISTING GATE VALVE EXISTING HYDRANT EXISTING ELECTRIC BOX EXISTING COMMUNICATIONS PEDESTAL EXISTING WATER MAIN EXISTING FIBER OPTIC LINE EXISTING COMMUNICATION LINE EXISTING ELECTRIC POWER LINE EXISTING GAS LINE 965.77 PROPOSED SPOT ELEVATION X X EXISTING FENCE EXISTING SANITARY GRAVITY MAIN> EXISTING SANITARY FORCEMAINFM SILT FENCESF ||PROPOSED WATER MAIN RD EXISTING BUILDING DOWNSPOUT FILTER GALLERY x12 10' GAC VESSELS x3-4 FUT. IX VESSELS x2 FUT. BRINE TANKS x3 CARTRIDGE FILTERS MECHANICAL CLOSET ELECTRICAL ROOM BACKWASH TANKS 12" STORM (SEE SHEET C-XX) 12" DIP WELL NO. 7 RAW WM (SEE SHEET C-XX) 12" DIP WELL NO. 3 RAW WM (SEE SHEET C-XX) 12" DIP WELL NO. 5 RAW WM (SEE SHEET C-XX) BRINE ROOM VE H I C L E B A Y N O . 1 VE H I C L E B A Y N O . 2 12" DIP WELL NO. 3 & 5 GAC TO IX (SEE SHEET C-XX) ABANDON EX. WATER SERVICE CONNECT TO EX. STORM STRUCTURE STORMWATER BMP 4800 SF @ 858.00 1900 SF @ 854.50 12 " D I P W E L L N O . 7 D I S T R I B U T I O N W M ( S E E S H E E T C - X X ) EXISTING IX WTP PROPOSED WTP NO. 2 EXISTING GROUND STORAGE RESERVOIR FU T U R E I X ( 2 , 0 0 0 G P M ) EXISTING WELL NO. 5 AND BOOSTER STATION RELOCATE HYDRANT RESTROOM OFFICE/ STORAGE FL U O R I D E RO O M CHLORINE ROOM STORAGE SANITARY SEWER (SEE SHEET C-XX) CONNECT TO EX. SANITARY CONCRETE WALK (SEE DETAIL X/CD-XX) CONCRETE WALK (SEE DETAIL X/CD-XX) X BH-2 X BH-1 and SV-1 X BH-3 and SV-2 X BH-4 X- BH-5 X BH-6 and SV-3 X BH-7 X BH-8 and SV-4 VIII-07 VIII-07