Loading...
HomeMy WebLinkAboutVIII-10 Approve Detour Agreement No. 1058371 - Highway 55 Traffic Signal City Council Memorandum To: Mayor Fasbender & City Council Members From: Cody Mathisen – City Engineer Date: January 21, 2025 Item: Resolution – Approve Detour Agreement No. 1058371 – Highway 55 Traffic Signal Replacements Project S.P. 1910-57, Pleasant Drive and Westview Drive Intersections COUNCIL ACTION REQUESTED Attached for Council consideration is a resolution to approve the attached Detour Agreement that will allow for MnDOT to designate portions of General Sieben Drive, South Frontage Road, and Westview Drive as part of a local detour route during the summer of 2025. BACKGROUND INFORMATION On September 4th, 2024, council adopted a resolution of intent to participate in traffic signal replacements on Highway 55 at the intersections of Pleasant Drive and Westview Drive. In August of 2025, MnDOT will begin the construction of these replacements as well as other minor improvements at these intersections. In order to minimize impact to our local businesses and residents, MnDOT has collaborated with City staff in identifying both a regional detour route as well as a local detour route. The regional detour, via Goodwin Ave, CSAH 46, and Highway 61, will be intended to serve the majority of traffic (including heavy truck traffic) that is passing through Hastings. The local detour route, via General Sieben Drive, South Frontage Road, and Westview Drive, will be intended to serve as access for all local businesses and residences along the Highway 55 corridor between General Sieben Drive and Highway 61. It is anticipated the project will only require these detours for a period of two weeks, with only one direction of travel being closed at a time for one week each. FINANCIAL IMPACT MnDOT has a policy for compensating municipalities when detour routes for their projects are facilitated using local streets. The policy uses a method for determining the value of the extra “Road Life Consumed” by the additional traffic on the local road during the time of the detour. Based on this policy formula, the City will receive approximately $1,300. STAFF RECOMMENDATION Staff is recommending the Council adopt the attached resolution approving Detour Agreement No. 1058371 and authorizing the Public Works Director to execute and administer the agreement on the City’s behalf. ATTACHMENTS • Resolution • Detour Map • Detour Agreement No. 1058371 VIII-10 CITY OF HASTINGS DAKOTA COUNTY, MINNESOTA Resolution No. _________ RESOLUTION FOR APPROVAL OF DETOUR AGREEMENT MNDOT HIGHWAY 55 TRAFFIC SIGNAL REPLACEMENTS – S.P. 1910-57 WHEREAS, in the summer of 2025, the Minnesota Department of Transportation (MnDOT) will begin a project to replace traffic signals and make other minor improvements to intersections along Highway 55 including Pleasant Drive and Westview Drive, and WHEREAS, this project will require detour routes to facilitate through-traffic flow while the Highway 55 corridor is under construction, and WHEREAS, the local area detour route for traffic in the immediate vicinity of Hastings will include General Sieben Drive, South Frontage Road, and Westview Drive, and WHEREAS, MnDOT has a policy for compensating municipalities whenever local streets are utilized for detour routes, and WHEREAS, MnDOT requires a Detour Agreement to document the application of said policy and amount of compensation due to a municipality, and WHEREAS, Detour Agreement No. 1058371 has been assembled to provide said documentation. NOW, THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF HASTINGS AS FOLLOWS; that 1. The City Council hereby approves Detour Agreement No. 1058371. 2. The Public Works Director is authorized to execute and administer the agreement. ADOPTED BY THE CITY COUNCIL OF HASTINGS, MINNESOTA, THIS 21st DAY OF JANUARY, 2025. Ayes: Nays: Mary D. Fasbender, Mayor ATTEST: Kelly Murtaugh, City Clerk VIII-10 VIII-10 MnDOT Contract No.: 1058371 -1- Detour Agreement without Local Maintenance (Cooperative Agreements) STATE OF MINNESOTA DEPARTMENT OF TRANSPORTATION AND CITY OF HASTINGS DETOUR AGREEMENT For Trunk Highway No. 55 Detour State Project Number (S.P.): 1910-57 Trunk Highway Number (T.H.): 55=53 State Aid Project Number (S.A.P.): 130-010-015 Federal Project Number: NHPP 0055(322) Original Amount Encumbered $1,286.81 This Agreement is between the State of Minnesota, acting through its Commissioner of Transportation ("State") and the City of Hastings acting through its City Council ("City"). Recitals 1. The State is about to perform grading, bituminous surfacing, ADA improvements, and signals construction upon, along, and adjacent to Trunk Highway No. 55 at Pleasant Drive and at Westview Drive under State Project No. 1910-57 (T.H. 55=53); and 2. The State requires a detour to carry T.H. 55 traffic on General Sieben Drive, South Frontage Road, and Westview Drive during the construction; and 3. The State is willing to reimburse the City for the road life consumed by the detour as hereinafter set forth; and 4. Minnesota Statutes § 471.59, subdivision 10, § 161.25, and § 161.20, subdivision 2(b), authorize the parties to enter into this Agreement. Agreement 1. Term of Agreement 1.1. Effective Date. This Agreement will be effective on the date the State obtains all signatures required by Minnesota Statutes § 16C.05, subdivision 2. 1.2. Expiration Date. This Agreement will expire when the State removes all detour signs, returns the temporary Trunk Highway detour to the City, and pays for the detour compensation. 2. Agreement Between the Parties 2.1. Detour. A. Location. The State will establish the T.H. 55 detour route on the following City streets as detailed in the project plans or Special Provisions: Stage 1&2 – General Sieben Drive for a total distance of 1.42 miles. Stage 1&2 – General Sieben Drive for a total distance of 0.14 miles. Business – South Frontage Road for a total distance of 1.32 miles. Business – Westview Drive for a total distance of 0.05 miles. VIII-10 MnDOT Contract No.: 1058371 -2- Detour Agreement without Local Maintenance (Cooperative Agreements) B. Modification of the Detour Route. The State may modify the detour route or may add additional roadways to the official detour during construction. The State will request concurrence from the City for changes to the detour route. If such change increases the States total payment amount over the maximum obligation in Article 3.2, the Agreement will be amended. C. Axle Loads and Over-Dimension Loads. The City will permit 10-ton axle loads on the detour route. Over-dimension loads will not be permitted except in cases of extreme emergency. D. Traffic Control Devices. The State may install, maintain, and remove any traffic control devices it considers necessary to properly control the detoured traffic. The State may paint roadway markings, such as the centerline, edge lines, and necessary messages. E. Detour Maintenance. The State will perform any necessary bituminous patching and ordinary maintenance on the roadway or shoulder of the City streets used for the detour, at no cost or expense to the City. Bituminous patching is defined as any work, including continuous full width overlays, less than 100 feet in length. All State expenditures beyond those required for bituminous patching and ordinary maintenance will be credited against the road life consumed reimbursement due the City. F. Duration. The State will provide the City with advance notice identifying the dates the State intends to place and remove the detour signing. 2.2. Basis of State Cost (Road Life Consumed). The State will reimburse the City for the road life consumed by the detour using the following methods, as set forth in the Detour Management Study Final Report dated January 1991, and updated by MnDOT's Policy on Cost Participation for Cooperative Construction Projects and Maintenance Responsibilities between MnDOT and Local Units of Government. A. The "Gas Tax Method" formula, multiplies the Combined Tax Factor per mile times the Average Daily Traffic ("ADT") count of vehicles diverted from the Trunk Highway times the city street length in miles times the duration of the detour in days to determine the State's cost for the road life consumed by the detour. If an ADT changes, the parties will amend the Agreement. B. The City may, at its option, perform an "Equivalent Overlay Method" analysis. A State-approved firm, at no cost or expense to the State, must perform the testing and analysis. The City will keep records and accounts to verify any claim it might bring against the State for additional costs using the "Equivalent Overlay Method". 3. Payment 3.1. For Road Life Consumed. $1,286.81 is the State's estimated cost for the road life consumed by the detour based on the data below: Stage Tax Factor ADT Road Length (Miles) Duration (Days) Cost Stage 1&2 0.00513 12,374 1.42 12 $1,081.68 Stage 1&2 0.00513 12,489 0.14 12 $107.64 Business 0.00513 1,156 1.37 12 $97.49 Road Life Consumed Amount: $1,286.81 The State's total payment for the road life consumed by the detour is equal to the amount computed by using the "Gas Tax Method" formula plus any amount determined by using the "Equivalent Overlay Method" analysis that is in excess of twice the "Gas Tax Method" amount. VIII-10 MnDOT Contract No.: 1058371 -3- Detour Agreement without Local Maintenance (Cooperative Agreements) 3.2. Maximum Obligation. $15,000.00 is the maximum obligation of the State under this Agreement and must not be exceeded unless the maximum obligation is increased by execution of an amendment to this Agreement. 3.3. Conditions of Payment. The State will pay the City the State's total road life consumed payment amount after performing the following conditions. A. Execution of this Agreement and the City's receipt of the executed Agreement. B. State's encumbrance of the State's total payment amount. C. State's removal of all detour signs. D. State notifies the City of the removal of the detour signs, and the number of days the detour was in effect. E. State's receipt of a written request from the City for payment. 4. Release of Road Restoration Obligations By accepting the State's road life consumed payment plan and total payment amount, the City releases the State of its obligation, under Minnesota Statutes § 161.25, to restore the city streets used as a T.H. 55 detour to as good of condition as they were before designation as temporary trunk highways. 5. Authorized Representatives Each party's Authorized Representative is responsible for administering this Agreement and is authorized to give and receive any notice or demand required or permitted by this Agreement. 5.1. The State's Authorized Representative will be: Name, Title: Greg Kern, MnDOT Metropolitan District Traffic Engineering (or successor) Address: 1500 County Road B2 West, Roseville, MN 55113 Telephone: (651) 775-9167 E-Mail: gregory.kern@state.mn.us 5.2. The City's Authorized Representative will be: Name, Title: Cody Mathisen, Hastings City Engineer (or successor) Address: 1225 Progress Drive, Hastings, MN 55033 Telephone: (651) 480-2372 E-Mail: cmathisen@hastingsmn.gov 6. Assignment; Amendments; Waiver; Contract Complete 6.1. Assignment. No party may assign or transfer any rights or obligations under this Agreement without the prior consent of the other party and a written assignment agreement, executed and approved by the same parties who executed and approved this Agreement, or their successors in office. 6.2. Amendments. Any amendment to this Agreement must be in writing and will not be effective until it has been executed and approved by the same parties who executed and approved the original Agreement, or their successors in office. 6.3. Waiver. If a party fails to enforce any provision of this Agreement, that failure does not waive the provision or the party's right to subsequently enforce it. VIII-10 MnDOT Contract No.: 1058371 -4- Detour Agreement without Local Maintenance (Cooperative Agreements) 6.4. Contract Complete. This Agreement contains all prior negotiations and agreements between the State and the City. No other understanding regarding this Agreement, whether written or oral, may be used to bind either party. 7. Liability The City and State will be responsible for their own acts and omissions, to the extent authorized by law. Minnesota Statutes § 3.736 governs the State's liability. Minnesota Statutes, Chapter 466 governs the liability of the City. 8. State Audits Under Minnesota Statutes § 16C.05, subdivision 5, the City's books, records, documents, and accounting procedures and practices relevant to this Agreement are subject to examination by the State and the State Auditor or Legislative Auditor, as appropriate, for a minimum of six years from the end of this Agreement. 9. Government Data Practices The City and State must comply with the Minnesota Government Data Practices Act, Minnesota Statutes Chapter 13, as it applies to all data provided by the State under this Agreement, and as it applies to all data created, collected, received, stored, used, maintained, or disseminated by the City under this Agreement. The civil remedies of Minnesota Statutes § 13.08 apply to the release of the data referred to in this clause by either the City or the State. 10. Governing Law; Jurisdiction; Venue Minnesota law governs the validity, interpretation, and enforcement of this Agreement. Venue for all legal proceedings arising out of this Agreement, or its breach, must be in the appropriate state or federal court with competent jurisdiction in Ramsey County, Minnesota. 11. Termination; Suspension 11.1. By Mutual Agreement. This Agreement may be terminated by mutual agreement of the parties or by the State for insufficient funding as described below. 11.2. Termination for Insufficient Funding. The State may immediately terminate this Agreement if it does not obtain funding from the Minnesota Legislature, or other funding source; or if funding cannot be continued at a level sufficient to allow for the payment of the services covered here. Termination must be by written or fax notice to the City. The State is not obligated to pay for any services that are provided after notice and effective date of termination. However, the City will be entitled to payment, determined on a pro rata basis, for services satisfactorily performed to the extent that funds are available. The State will not be assessed any penalty if this Agreement is terminated because of the decision of the Minnesota Legislature, or other funding source, not to appropriate funds. 11.3. Suspension. In the event of a total or partial government shutdown, the State may suspend this Agreement and all work, activities, performance, and payments authorized through this Agreement. Any work performed during a period of suspension will be considered unauthorized work and will be undertaken at the risk of non-payment. 12. Force Majeure No party will be responsible to the other for a failure to perform under this Agreement (or a delay in performance), if such failure or delay is due to a force majeure event. A force majeure event is an event beyond a party's reasonable control, including but not limited to, unusually severe weather, fire, floods, other acts of God, labor disputes, acts of war or terrorism, or public health emergencies. VIII-10 MnDOT Contract No.: 1058371 -5- Detour Agreement without Local Maintenance (Cooperative Agreements) STATE ENCUMBRANCE VERIFICATION Individual certifies that funds have been encumbered as required by Minnesota Statutes § 16A.15 and 16C.05. Signed: Date: SWIFT Purchase Order: CITY OF HASTINGS The undersigned certify that they have lawfully executed this contract on behalf of the Governmental Unit as required by applicable charter provisions, resolutions, or ordinances. By: Title: Date: By: Title: Date: DEPARTMENT OF TRANSPORTATION Approved: By: (District Engineer) Date: COMMISSIONER OF ADMINISTRATION By: (With Delegated Authority) Date: INCLUDE COPY OF THE RESOLUTION APPROVING THE AGREEMENT AND AUTHORIZING ITS EXECUTION. VIII-10