Loading...
HomeMy WebLinkAboutVIII-13 2024 Budget Amendment - Lead Paint Scraping and Containment City Council Memorandum To: Mayor Fasbender & City Councilmembers From: City Administrator Dan Wietecha Date: October 7, 2024 Item: 2024 Budget Amendment: Lead Paint Scraping and Containment Council Action Requested: Approve amendment to the 2024 Budget: $30,175 for lead paint scraping and containment as part of the City Hall Historic Renovation project. Background Information: This summer, contractor Renaissance Roofing found peeling, lead-based paint. The project specifications and contract did not clearly include specifications or required actions is lead-based paint were encountered during the project. Work was stopped, and several areas were tested to confirm the presence of lead-based paint. On September 17, the contractor provided a quote of $30,175, reviewed by our architects at Miller Dunwiddie, to scrape, contain, and safely dispose of peeling, lead-based paint on the project. I approved the change order so work could begin promptly while we still have warm weather. Financial Impact: $30,175 – within project contingency Committee Discussion: Not applicable Attachment: Change Order #5 VIII-13 Project:Change Order Number: Project Number: Attn: Contract Date: The Contract is proposed to be changed as follows: A) NOTE: This is not abatement work, there will still be lead paint present on those areas after work is performed. Pricing Breakdown: Containment $ 30,175.00 Additional Labor for scraping & containment of peeling lead paint 25,600.00$ Extended Lift Rentals 3,625.00$ Tools, Supply, Disposal & Additional Pedestrian Protection 950.00$ Additional Site Visits Beyond Scope of Work -$ Scaffold Rental for Containment of Lead Paint $ - *Scaffold rental for delays not under our control, past the original take down date of August 19 Note - this does not include any work on Center dome. 2231 Hawkey Drive Date Date Date Name (print )Name (print )Name (print ) 9/17/2024 By (signature)By (signature)By (signature) Jake Verhagen Address Address Address Owner Representative (Firm Name)Contractor (Firm name)Owner(Firm name) Belvidere, IL The new contract sum total, including this change order 3,389,910.00$ Renaissance Roofing, Inc. The net change by previously authorized change orders 54,940.00$ The contract sum at time of this change order 3,359,735.00$ The contract sum will be Increased by this change Order in the amount of 30,175.00$ As discussed on site, this will not provide a smooth surface, however, we will be removing all loose lead paint leaving the still adhered lead paint in place. Total amount:30,175.00$ The original contract sum, including all alternates was 3,304,795.00$ Lead Paint Containment Safely scrape, contain and properly dispose of loose peeling lead paint from main building cornice metal and peaks around parameter of the roof in preparation for primer & topcoat. Hastings, MN 55033 COH2101 Kelly Mastin | Miller Dunwiddie 12/01/23 Hastings City Hall: Historic Roofing Repair 5Revision 101 4th Street East Date:09/17/24 CHANGE ORDER FORM P.O. Box 5024, Rockford, IL 61125 2306 Lemp Avenue 2231 Hawkey Drive, Belvidere, IL 61008 St. Louis, MO 63104 815/547.1725; Fax: 815/547.1425 314/772.6222; Fax: 314/772.6224 www.HistoricExteriors.com BELVIDERE/CHICAGO OFFICE 1-800-699-5695 ST. LOUIS OFFICE VIII-13