HomeMy WebLinkAboutHPC Packet 09-17-2024HASTINGS HERITAGE PRESERVATION COMMISSION
Agenda for Meeting of September 17, 2024
Regular business at 7:00 p.m. at City Hall in the Volunteer Room
I. Call to Order and Quorum
II. Minutes:
A. August 20, 2024
III. Certificate of Approval Review
A. 221 Sibley St — New windows
IV. OHDS — Original Hastings Design Standards Review
V. Business and Information
VI. Adjourn
The next regularly scheduled meeting will be held on October 15, 2024 at Hastings City Hall
HASTINGS HERITAGE PRESERVATION COMMISSION
Minutes of the Meeting of July 16, 2024
Held at 7:00 p.m. at City Hall, Volunteer Room
I. Call to Order and Quorum Smith, McCoy, Peterson, Bremer, Simacek, and Toppin
Absent: Borchardt, Youngren, and Alitz Edell.
Staff: Fortney
II. Add items to the agenda
A. 212 2nd Street E - Painting, and brick replacement.
B. 207 2nd Street W - Century Home Plaque Request
Motion by Commissioner Peterson to add the items to the agenda, seconded by
Commissioner McCoy. Approved 6-0
III. Minutes:
A. July 16, 2024 Approved by Chair Toppin
IV. Certificate of Approval Review
A. 306 2nd St West - Landscaping Project
Fortney presented the staff report. Chair Toppin asked the applicant questions about the location
of the proposed improvements and future phases. John Stebbings, applicant explained the
improvements are limited to the NE corner of the yard and they will not be higher than the highest
ground level. He added that a greenhouse and garage would be future phases that he will bring
forward later. He said the landscaping is necessary immediately due to erosion. Fortney
cautioned the applicant to not plant any vegetation that might impact visibility near the alley
intersection. Stebbings said he would not.
Motion by Commissioner Bremer to approve the request as proposed, seconded by
Commissioner McCoy. Approved 6-0
B. 212 2nd Street E — Brick repair
Fortney presented the staff report and said the upper parapet wall has deteriorated and the work
involves replacement of at least two bricks deep into the wall. He added that only previously
painted masonry can be painted without HPC approval. The replaced bricks would technically
require this approval. Commissioner Simacek asked if the commission needed to review the
proposed roofing work. Fortney said there is no actual roofing work proposed. There is only a
note in the mason's contract stating any issues relating to roofing would require the owner to
contract with a roofing contractor for that type of work.
Motion by Commissioner Simacek to approve the reconstruction and painting as proposed,
seconded by Commissioner Peterson. Approved 6-0
C. 207 2nd Street W — Century Home Plaque Application
Fortney presented the staff report with no further discussion.
Motion by Commissioner McCoy to approve the requested century plaque sale, seconded by
Commissioner Peterson. Approved 6-0
V. OHDS — Original Hastings Design Standards Review
VI. Business and Information
A. Mailing notification discussion.
The commission provided staff with final direction on the proposed mailing that will go out to
owners of designated properties to provided notice of the approval process, appreciation for the
care of their historic properties, and financial assistance that is available.
B. Staff updated the Commission on the zoning code update
C. Upcoming State Preservation Conference opportunity.
Staff asked if any commissioners were interested in attending the conference in Red Wing, which
is mandatory for at least one commissioner or staff from each CLG (Certified Local Government).
He added that the expense is reimbursable with state grants. Commissioners Bremer and Peterson
showed interest.
VII. Adjourn
Motion by Commissioner Borchardt to adjourn at 7:51 pm, seconded by Commissioner
Youngren. Approved 6-0
Respectfully Submitted - Justin Fortney
CERTIFICATE APPLICATION 9-2024
221 Sibley Street. Levi Hafstad, Hafstad Real Estate LLC— Replace windows
Ca. 1881, East 2nd Street Historic District, National Register
Background:
The applicant received approval from the HPC in November and December 2023 for the
replacement of three third story windows with storm windows (2 on the side and 1 in the
rear), two basement egress windows, and one main floor historic window (far right, 2
over 2 divider required (not yet installed)).
Request:
The applicant is proposing to replace two rear second story windows that are not original
and three rear historic wood windows that are 2 over 2 design (but with major
modifications to two of them). The proposed replacement windows are the same as last
year, which are custom double hung wood sash windows painted bronze with matching
combination storm windows.
Ordinance, Guidelines
Design Guidelines (Page 21) 4: Windows
1. Maintain and Conserve Wherever feasible, historic windows and sash should be
repaired rather than replaced, especially on principal elevations.
3. New Sash: Glazing The size and number of panes of glass in each sash should not be
altered. New sash, if installed, should duplicate the existing or other appropriate historic
models. Artificial muntins or grids should at the least be located on the exterior of the
window and match the original window design. Crank -out units should not replace
double -hung sash.
5. Storm Windows Repair or replicate historic wood storms wherever possible. Storm
windows should not have vertical or horizontal divisions that conflict with the divisions
of the historic sash and should be flush with existing trim. If combination metal storms
must be installed, they should have a baked enamel factory finish.
Staff Findings
The second story windows are not historic and the HPC has acknowledged the
appropriateness of replacing these windows with the proposed windows and storms.
Repairing the window per the Design Guidelines is preferable. However, the center
window is in poor condition and the left and right windows have been altered
significantly. Replacement with a historically fitting replacement may be appropriate.
They should include a 2 over 2 simulated divider like was conditioned on the previous
historic replacement approved last year.
Pre 1985 photo
AIL
Approved and replaced, still needs center divider