City Council Workshop
September 3, 2024
The City Council of the City of Hastings, Minnesota met in a workshop on Tuesday, September
3, 2024, at 5:30 p.m. in the Volunteer Room at the Hastings City Hall, 101 East 4th Street,
Hastings, Minnesota.
Members Present: Mayor Fasbender, Councilmembers Fox, Lawrence, Leifeld, Pemble, and
Vihrachoff
Members Absent: Councilmember Haus
Staff Present: City Administrator Dan Wietecha
Assistant City Administrator Kelly Murtaugh
Finance Manager Chris Eitemiller
Police Chief Dave Wilske
Community Development Director John Hinzman
Mayor Fasbender called the workshop to order at 5:30 pm and welcomed councilmembers and
staff for discussion about the 2025 Budget. Eitemiller provided an overview of what will be
presented at the workshop to support the budget request.
Eitemiller reviewed the key changes in revenue and expenses. The average proposed increase in
tax levies in cities in Dakota County is 8-10%. This budget proposes a 7.5% increase in the levy
for the upcoming year, resulting in a balanced budget. The impact of this increase on the median
value home is $106 for the year. Other revenues come from the Rural Fire Association, ISD 200
and rate increase at the Civic Arena.
Staff changes include hiring the 2 additional firefighter/paramedics to round out commitment to
6 positions over three years, a second school resource officer, and contract support for
engineering. Health insurance is anticipated to increase by approximately 10%, and the proposed
cost of living adjustment is proposed at 3.5%. Inflationary increases for services and supplies and
some line item increases that the City is aware of currently are included. There is an increase to
debt service for the City Hall/Civic Arena project.
Infrastructure projects included in the budget are the City portion of traffic signal replacement on
Hwy 55 at Pleasant and Westview. The neighborhood project, water tower reconditioning, and
sewer lining program are also included for 2025. Asset management is also a focus of the 2025
budget. Deferred and preventative maintenance, pool gutters at Aquatic Center, fleet vehicle
replacements, plow/dump for PW, brush truck for Fire, arena lighting and Zamboni room roof
are recommended for inclusion in the budget.
Eitemiller reviewed the historical tax rate, levy, and tax capacity for the last 10 years. The
preliminary tax levy impact on a median value residence in the city would result in a $106
increase in taxes paid to the city. The fiscal disparities increased, reducing the tax impact by $26.
One per cent levy equates to $200,499.
There are several bonding projects in the upcoming year. Continuing the Neighborhood Street
project is recommended at about $4.2M. Construction of the first Water Treatment Plant for
PFAS and nitrate removal will start in 2025 at a cost of $20.6M.
Utility rates will increase in 2025. Sewer is expected to increase 4.5% and stormwater is
expected to increase 4%. The larger increase will be seen in water rates and this is due to the
construction of the water treatment plants. This is the first anticipated increase, with others to
follow in ensuing years. The water rate will increase by 37.3% in 2025. If the city is successful
in obtaining grants or funding from other sources, this rate could be decreased accordingly.
Utility capital projects include the water treatment plant #1, utility portions of the Neighborhood
project, sewer rehabilitation projects, the industrial park water tower reconditioning project, the
salt shed roof, dewatering at the Hydro plant, a SCADA upgrade, sewer lift station and pump
controls, and the water quality improvement project.
City staff proposed cost containment or other efficiencies that have created reductions in the
budget. An emphasis on asset management now saves funds in the long run. Some projects (Vets
Park Planning) have been delayed and alternate vendors are being utilized (outfit police squads).
The Fire Department fleet adjustment results in a savings of $70,000. Lighting rebates for
parks/arena projects and a delay downtown master plan saves about $100,000. Choosing to
participate in an early bid and waiving prevailing wages for water tower reconditioning saves
over $300,000.
Additional saving opportunities if further savings are needed: reprioritize # of vehicles
purchased/leased; reduce Community Investment Fund, delay roadside court LED lighting,
council meals, delay adding firefighters, cut or delay School Resource Officer, or reduce
neighborhood project. Council discussion on importance of continuing the neighborhood street
projects—still catching up from past delays in projects. Concerned about additional delaying
these projects for future councils to address at a higher cost.
Council discussion on comfort level setting the levy at this meeting at 7.5% and possible
reductions in expenses. Council discussion about school board decision to not directly support
the civic arena project. Discussion about continuing to build relationship with school
board/school staff.
The Communication plan includes a press release following approval of preliminary levy;
developing key messages/talking points for Council and staff to share with community, info
about water rate changes, demonstrating the connection to strategic plan, interviews, social
media, newsletter, Budget at a Glance, and the Dakota County TNT mailer/insert.
ADJOURNMENT
Workshop adjourned at 6:54 p.m.