Loading...
HomeMy WebLinkAboutX-C-03 2nd Reading - Adopt Ordinance - Amend City Code Chapter 34 - Building Department Fees City Council Memorandum To: Mayor Fasbender and City Council From: John Hinzman, Community Development Director Lonnie Johnson, Building Official Date: June 17, 2024 Item: 2nd Reading\Adopt Ordinance: Amend City Code Chapter 34.03 – Fee Schedule – Building Department Fees Council Action Requested: Consider 2nd Reading and final adoption of an amendment to Hastings City Code Chapter 34.03 – Fee Schedule to modify certain Building Department fees. The City Council considered 1st Reading at the June 3, 2024 meeting. A simple majority is necessary for action. Purpose of Changes The proposed amendment is presented to accomplish the following: • Reduce duplicative permits for a single property by combining separate permits into an all-inclusive permit for ease of tracking and monitoring. • Ensure fees adequately cover the cost of staff review. Most fees have not been increased since 2015. Summary of Fee Changes • Minimum Building Permit Fee - Increased from $50 to $100 – This is a “catch all” for any inspection that does not have a specific permit fee in the code. • Basement Finish\Remodel – Created an all-inclusive permit combining separate building, plumbing, mechanical . Permit based on valuation of work. Existing fee is approximately $325 regardless of size or extent of improvements. New fee would be approximately $500 - $700 depending on size. A single bedroom would be as low as $100 with new calculation. • Decks – Fee to be based on a square foot calculation of the project with a minimum $100 fee. Currently charge a flat fee of $100. The fee for smaller decks is not expected to change. Larger decks may increase to $166. • Schedule A – General Construction Permit Fees – New title for fees listed under “Building Permits”. Project valuations under $25,000 have been streamlined into two categories with a minimum $100 permit fee (up from $50 for projects under $2,000) • Schedule B - Building Valuation Worksheet – The amendment includes a building valuation worksheet for larger permits for various types of work based on valuations for different types of work. The valuations more closely reflect that of the real market. X-C-03 • Mechanical Single Family Residential – The all-inclusive permits will include a flat rate fee for the mechanical portion instead of separate fees for each appliance or ducts. Plumbing will be similar. • Mobile Home Installations – Combines separate gas line, water, and sewer connection permits into an all-inclusive $350 permit. Current combined fees of separate permits are $250 to $300. • Establish a Re-Inspection Fee – Staff may assess if work to be inspected requires an additional scheduled inspection. The $75 fee is an increase to the typical $50 fee. • Inspection Fees Outside of Normal Business Hours – The existing $200 minimum fee would continue. Inspections over two hours would increase to $75 per hour from $50 per hour. • Pergolas – Eliminated review fee; very uncommon. • Sewer and Water Connection Inspect Combined – The separate inspection fees have been combined into a singular inspection. No change in fees. • Fire Sprinkler and Alarm – Establishing a $50 administrative fee for processing Fire Department Permits. Advisory Commission Review: N\A Advisory Committee Review: N\A Attachments: • Ordinance Amendment • Existing Ordinance X-C-03 1 ORDINANCE NO. 2024- AN ORDINANCE FOR THE CITY OF HASTINGS, MINNESOTA AMENDING HASTINGS CITY CODE CHAPTER 34.03 – FEES SCHEDULE REGARDING BUILDING PERMITS AND BUILDING SAFETY The City Council of the City of Hastings, Minnesota does hereby ordain as follows: SECTION 1. REPEAL AND REPLACE. The Code of the City of Hastings, State of Minnesota, Chapter 34, Section 34.03, Fee Schedule – Building Permits is repealed in its entirety and replaced as follows: 34.03 FEE SCHEDULE Building Permits Schedule A “GENERAL CONSTRUCTION PERMIT FEES is to be used for all permits when no specific fee is provided. Permit fee valuation shall be a total value of work, including materials and labor. Schedule B “RESIDENTIAL BUILDING PERMIT VALUATION WORKSHEET” is to be used for residential projects. Commercial valuations provided may be adjusted according to the International Code Council (ICC) published “BUILDING VALUATION DATA”. The permit applicant may be required to show documentation of actual total cost for material and labor, which shall be approved by the Building Official. (MN Rules 1300) Schedule A – General Construction Permit Fees Valuation Fee Surcharge $1.00 to $2,997.00 $100 $1.00 $2,998 to $25,000.00 $100.00 for the first $2,997.00 plus $16.55 for each additional $1,000.00, or fraction thereof, to and including $25,000.00 x .0005 of job valuation $25,001.00 to $50,000.00 464.15 for the first $25,000.00 plus $12.00 for each additional $1,000.00, or fraction thereof, to and including $50,000.00 x .0005 of job valuation $50,001.00 to $100,000.00 $764.15 for the first $50,000.00 plus $8.45 for each additional $1,000.00, or fraction therefore, to and including $100,000.00. x .0005 of job valuation $100,001.00 to $500,000.00 $1,186.65 for the first $100,000.00 plus $6.75 for each additional $1,000.00, or fraction thereof, to and including $500,000.00. x .0005 of job valuation X-C-03 2 $500,001.00 to $1,000,000.00 $3,886.65 for the first $500,000.00 plus $5.50 for each additional $1,000.00, or fraction thereof, to and including $1,000,000.00 x .0005 of job valuation $1,000,001.00 and up $6,636.65 for the first $1,000,000.00 plus 4.50 for each additional $1,000.00, or fraction thereof See State Surcharge Computation below Schedule B – Residential Building Permit Valuation Worksheet Type Value per s.f. Basement\Below Grade - Crawl Space $15.00 - Mechanical Room $30.00 - Unfinished Space $30.00 - Finished Space (New) $50.00 - Finish Existing Basement (All-inclusive) $30.00 - Finish Existing Basement (Conversion – No Plumbing) $25.00 Single\Multiple Family Dwelling - Main Floor $100.00 - Second Floor $100.00 - Unfinished Floors Above Grade $75.00 Garage - Wood Framed $50.00 - Carport $30.00 Decks\Porches - Covered Entry $50.00 - Screen Porch $75.00 - 3 Season $85.00 - 4 Season $95.00 - Decks $25.00 State Surcharge Computation Construction Value Range Surcharge Computation $1,000,001 to $2,000,000 $500 + .0004 x (valuation - $1,000,000) $2,000,001 to $3,000,000 $900 + .0003 x (valuation - $2,000,000) $3,000,001 to $4,000,000 $1,200 + .0002 x (valuation - $3,000,000) $4,000,001 to $5,000,000 $1,400 + .0001 x (valuation - $4,000,000) $5,000,000 or more $1,500 + .00005 x (valuation - $5,000,000) Plan Review Fees Review Type Fee Full Plan Review 65% of building permit fee Similar building plan review 25% of building permit fee Brief Plan review 25% of full plan review Decks, solar systems, interior finish, etc. $50 New Single-Family Dwelling $100 X-C-03 3 Commercial $100 Plans review performed prior to permit submittal and issuance or canceled will be invoiced for the full plan review fee and must be paid prior to any other permits issued to the applicant Building Permit Applications received without a named contractor require payment of the plan review fees prior to being accepted. Exceptions: The Plan Review Fee is waived on the following for one-two Family residential: A. Minor non-structural remodel B. Flat rate permits C. Deck Fees for Additional Plan Review Review Type Fee Decks, Solar Systems, Interior Finish, etc. $50.00 New Single-Family Development $100.00 Commercial $100.00 SECTION 2. REPEAL AND REPLACE. The Code of the City of Hastings, State of Minnesota, Chapter 34, Section 34.03, Fee Schedule – Building Safety is repealed in its entirety and replaced as follows: 34.03 FEE SCHEDULE Building Safety Commercial Building Permits Permit Type Fee Surcharge Commercial Building Permits See Schedule A See Schedule A Residential Building Permit Fees Permit Type Fee Surcharge New single-family dwelling all inclusive (plumbing, mechanical, fireplace, etc.) See Schedule A See Schedule A Interior Finish all inclusive (plumbing, mechanical, fireplace, etc.) See Schedule A See Schedule A Bath all inclusive (plumbing and mechanical $100.00 $1.00 Gas Fireplace all inclusive (building and mechanical) $100.00 $1.00 Mobile Home Installation all inclusive (gas line, air conditioning, water and sewer connections) $350.00 $1.00 Decks Permit Type Fee Surcharge New Deck See Schedule A See Schedule A Decks Resurface and Railings $100.00 $1.00 X-C-03 4 Demolition Permit Type Fee Surcharge Single Family Residential $150.00 $1.00 Commercial $200.00 $1.00 Electrical 0 to 40 Amp Power Source – Commercial $50.00 each 401 to 800 Amp Power Source – Commercial $100.00 each Over 800 Amp Power Source – Commercial $150.00 each 0 to 200 Amp Circuit or Feeder $8.00 each Over 200 Amp Circuit Feeder $30.00 each Fees above shall be doubled if over 250 volts Residential Panel Changes $100.00 each New 1 & 2 family homes up to 25 circuits, 3 trips $175.00 Additional circuits over 25 per unit $8.00 each Circuits extended or modified $8.00 each Retrofitting of existing lighting fixtures $0.25 each Manufactured Home Park Lot Supply and Circuits $50.00 per Ped Separate Bonding Inspection $40.00 Inspection of concrete encased grounding electrode $40.00 Technology circuits and circuits less than 50 volts $1.00 per device Traffic signals, street, parking and outdoor lighting standards $5.00 each Transformers for light, heat, and power (0 to 10 KVA) $20.00 each Transformers for light, heat, and power (more than 10 KVA) $40.00 each Transformers for electric power supplies and outline lighting $5.50 each Additional inspection trip(s), Re-inspections, new load management devices $40.00 each Replacement load management devices $15.00 each City service fee if including items other than replacement of load management devices $10.00 Reduced city service fee (only for replacement load management devices) $4.00 State Surcharge $1.00 Fire Permit Type Fee Surcharge Administrative Fee $50.00 $0 Fire Sprinkler System $100.00 base fee or 1.25% of valuation $1.00 or see Schedule A X-C-03 5 Fire Alarm System $100.00 base fee or 1.25% of valuation $1.00 or see Schedule A Fire Suppression\Hood Installation $100.00 $1.00 Irrigation Systems Permit Type Fee Surcharge Originating from 1-inch water service or smaller $75.00 $1.00 Originating from greater than 1-inch water service $100.00 $1.00 Mechanical – Commercial Permit Type Fee Surcharge Commercial Mechanical Permit $100.00 base fee or 1.25% x valuation $1.00 See Schedule A Mechanical – Residential Permit Type Fee Surcharge Minimum Permit $75.00 $1.00 New Single-Family Dwelling – All Inclusive $300.00 $1.00 Interior Finish (if separate from all inclusive) $150.00 $1.00 New and Replacement Furnace (including gas piping) $75.00 $1.00 Mechanical Ventilation System (air to air) $75.00 $1.00 New Gas Piping with Air Test Only $75.00 $1.00 In-Floor Heat $75.00 $1.00 Garage Furnace $75.00 $1.00 On-Site Septic Systems Permit Type Fee Surcharge Single Family Residential $200.00 $1.00 Commercial (less than 750 gallons per day) $200.00 $1.00 Commercial (750 to 2,000 gallons per day) $200.00 + $40 County as-built fee $1.00 Reconstruction of Existing System (with City Council approval) $200.00 + $40 County as-built fee $1.00 Plumbing – Commercial Permit Type Fee Surcharge Commercial Plumbing Permit $100.00 base fee or 1.25% x valuation $1.00 See Schedule A X-C-03 6 Plumbing – Residential Permit Type Fee Surcharge Minimum Permit $75.00 $1.00 New Single-Family Development – All Inclusive $300.00 $1.00 Interior Finish (if separate from all inclusive) $150.00 $1.00 Replacement of Single Fixture (water heater, water softener, etc.) $75.00 $1.00 Plumbing Utilities Permit Type Fee Surcharge Sewer and Water Connection Inspection $100.00 $1.00 Relocation of Structures Permit Type Fee Surcharge Residential Dwellings $100.00 $1.00 Accessory Structures – less than 200 s.f. (Zoning Permit) $75.00 $0 Re-Roof Permit Type Fee Surcharge Residential (new tear off and repairs) $100.00 $1.00 Commercial $100.00 base fee or 1.25% x valuation 0.0005 x value Re-Side Permit Type Fee Surcharge Residential (reside repairs) $100.00 $1.00 Commercial $100.00 base fee or 1.25% x valuation 0.0005 x value Rental Housing Inspections Permit Type Fee Frequency Single Unit $50.00 per two years Duplex (non-owner occupied) $75.00 per two years Duplex (owner occupied $50.00 per two years Triplex $95.00 per two years Fourplex $115.00 per two years Over Four Units $75.00 per building + $10.00 per unit per two years Swimming Pools Permit Type Fee Surcharge Above Ground (separate mechanical permit) $100.00 $1.00 X-C-03 7 In-Ground or Partially In-Ground (separate mechanical permit $200.00 $1.00 Windows/Doors Permit Type Fee Surcharge Window\Door Replacement $100.00 $1.00 New Egress Windows $100.00 $1.00 New or Increased Opening See Schedule A See Schedule A Zoning Permits Permit Type Fee Surcharge Fences $75.00 $0 Accessory Structures (between 75 and 200 s.f.) $75.00 $0 Other Permit Fees Fee Type Fee Surcharge Solar Photovoltaic $100.00 $1.00 Change of Use\Change of Occupancy $100.00 $0 Additional Fees Fee Type Fee Surcharge Reinspection Fee $75.00 $0 Refunds for Building Permit Fee (No refunds for plan review) 75% of permit fee $1 Work Commencing Before Permit Issuance (special investigative fee) $100.00 Minimum (up to building permit fee $0 Relocation of Structures $100.00 $1.00 Clearance Letter $5.00 $0 City Contractor License $50.00 $0 State Contractor Verification Fee $5.00 $0 Large Format Printing $5.00 per page $0 Single Family Dwelling Plan Pack $75.00 $0 Special Inspections Permit Type Fee Surcharge Additional Inspections $75.00 per hour $0 Inspections Outside of Normal Business Hours (Building Official approved only) $200 minimum + $75.00 per hour after 2 hours $0 Re-Open Expired Permit 50% of base fee $0 Expired Temporary Certificate of Occupancy 50% of base fee $0 X-C-03 8 SECTION 3. SUMMARY PUBLICATION. Pursuant to Minnesota Statutes 412.191, in the case of a lengthy ordinance, a summary may be published. While a copy of the entire ordinance is available without cost at the office of the City Clerk, the following summary is approved by the City Council and shall be published in lieu of publishing the entire ordinance. The text amendment adopted by the Hastings City Council on June 17, 2024 modifies the City Fee Schedule pertaining to Building Department Fees and Building Safety Fees. SECTION 4. EFFECTIVE DATE. This ordinance shall be in full force and effect from and after its passage and publication according to law. Passed this 17th day of June, 2024 _____________________________________ Mary Fasbender, Mayor Attest: ____________________________ Kelly Murtaugh, City Clerk Summary Publication Published in the Hastings Journal on June 20, 2024 and June 27, 2024 X-C-03 Building Permits Building Permits The following valuation is to be used for all general construction when no specific fee is provided. Permit fees are reviewed and adopted by action of the council. Permit fee valuation shall be a total value of work, including materials and labor. Verification of valuations used to establish building permit fees will be held to the most current Building Valuation Data, published periodically by the International Code Council or other Building Standards Publications. Valuations may require actual total cost documentation provided by the permit applicant showing all costs for material and labor and approved by the Building Official. (MN Rules 1300) Valuation Fee Surcharge Year $1.00 to $500 $50.00 x .0005 of job 2022 $501 to $2,000 $50.00 for the first $500 plus $3.70 for each additional $100, or fraction thereof, to and including $2,000 x .0005 of job 2022 $2,001 to $25,000 $83.50 for the first $2,000 plus $16.55 for each additional $1,000, or fraction thereof, to and including $25,000 x .0005 of job 2022 $25,001 to $50,000 $464.15 for the first $25,000 plus $12.00 for each additional $1,000, or fraction thereof, to and including $50,000 x .0005 of job 2022 $50,001 to $100,000 $764.15 for the first $50,000 plus $8.45 for each additional $1,000, or fraction thereof, to and including $100,000 x .0005 of job 2022 $100,001 to $500,000 $1,186.65 for the first $100,000 plus $6.75 for each additional $1,000, or fraction thereof, to and including $500,000 x .0005 of job 2022 5/29/24, 2:56 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Permits 1/2 X-C-03 $500,001 to $1,000,000 $3,886.65 for the first $500,000 plus $5.50 for each additional $1,000, or fraction thereof, to and including $1,000,000 x .0005 of job 2022 $1,000,001 and up $6,636.65 for the first $1,000,000 plus $4.50 for each additional $1,000, or fraction thereof. See State Surcharge Computation below 2022 State Surcharge Computation Construction Value Range Surcharge Computation $1,000,001 to $2,000,000 $500 + .0004 x (valuation - $1,000,000) $2,000,001 to $3,000,000 $900 + .0003 x (valuation - $2,000,000) $3,000,001 to $4,000,000 $1,200 + .0002 x (valuation - $3,000,000) $4,000,0001 to $5,000,000 $1,400 + .0001 x (valuation - $4,000,000) $5,000,000 or more $1,500 + .00005 x (valuation - $5,000,000) Plan Review Fee 65% of the permit fee determined by valuation 25% of the permit fee for similar plans. (MN. R 1300.0160 subp. 6 B) Plans review performed prior to permit submittal and issuance which are cancelled will be invoiced for the full plan review fee and must be paid prior to any other permits issued to the applicant. Building Permit Applications received without a named contractor require payment of the plan review portion of fees prior to being accepted. Exception: The Plan Review Fee is waived on the following for one-two family residential: A) Minor non-structural remodel B) Detached accessory structure provided floor area does not exceed 200 Sq. ft. C) Above ground swimming pools 5/29/24, 2:56 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Permits 2/2 X-C-03 Building Safety Refunds for Permit Fees 75% of permit fee No refunds for plan reviews 2008 Basic Permit Fee $50.00 + $1.00 surcharge 2015 Clearance Letter $5.00 Work commencing before permit issuance Special investigation fee 2 x the building permit fee 2010 Special Inspections Additional Inspections $50.00 per hour 201 0 Inspections outside of normal business hours when approved by Building Official $200.00 minimum + $50.00/hr. after 2 hrs. 201 0 Mobile Home Installation (Park only-gas piping not included)$200.00 + $1.00 surcharge 2021 Decks $100.00 + $1.00 surcharge 2015 New Business Occupancy Permit $75.00 2014 Windows Door/Window replacement (total replacement of window. Sash replacement only exempt) $100.00 + $1.00 surcharge 2022 Commercial Building Windows $100.00 base fee or 1.25% of valuation surcharge $1.00 or .0005 x value 2015 5/29/24, 2:57 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 1/5 X-C-03 Re-Roof Residential (new tear off & repairs)$100.00 + $1.00 surcharge 2015 Commercial $100.00 base fee or 1.25% x valuation surcharge $1.00 or .0005 x value 2015 Residing Residential (reside or repairs)$100.00 + $1.00 surcharge 2015 Commercial $100.00 base fee or 1.25% x valuation surcharge $1.00 or .0005 x value 2015 Plumbing Residential and Commercial $100.00 base fee or 1.25% x valuation surcharge $1.00 or .0005 x value 202 2 Installation or Replacement of Single Fixture (water heater, water softener, etc.)$35.00 + $1.00 surcharge 201 5 Mechanical Single Family Residential: New & replacement furnace installation (including gas piping)$75.00 + $1.00 surcharge 2015 Gas fireplace or other single gas appliance $50.00 + $1.00 surcharge 2015 Central Cooling or Ductwork $75.00 +$1.00 surcharge 2015 Mechanical ventilation system (air to air)$50.00 + $1.00 surcharge 2015 New gas piping with air test only $35.00 + $1.00 surcharge 2015 In floor Heat $50.00 + $1.00 surcharge 2015 Garage Furnace $50.00 + $1.00 surcharge 2015 Commercial $100.0 base fee or 1.25% x valuation surcharge $1.00 or .0005 x value 2015 Irrigation System Installation Systems originating from a 1" water service or smaller $75.00 + $1.00 surcharge 2015 Systems originating from a water service larger than 1"$150.00 + $1.00 surcharge 2015 5/29/24, 2:57 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 2/5 X-C-03 Utilities Sewer Connection Inspection $50.00 + $1.00 surcharge 2015 Water Connection Inspection $50.00 + $1.00 surcharge 2015 Simultaneous Sewer & Water Connection Inspection $100.00 + $1.00 surcharge 2015 On-Site Septic Systems Single Family Residential or Commercial $200.00+ $1.00 surcharge 201 5 Commercial 750 GPD to 2,000 GPD or Reconstruction of Existing System (With approval from City Council) Includes the fee above + $40.00 county fee 201 0 Required Other Permits Basement Finish/Remodel $150.00 + $1.00 surcharge 2015 Relocation of structures Single Family Dwellings $100.00 no surcharge fee 2014 Accessory structures < 200 SF Zoning Permit Required 2022 Accessory structures > 200 SF $50.00 no surcharge fee 2022 Building Demolition Accessory Structure $50.00 + $1.00 surcharge 2015 Single Family Residential $150.00 + $1.00 surcharge 2015 Commercial $200.00 + $1.00 surcharge 2015 Fire Sprinkler & Fire Alarm Systems $1.00 and up 100.00 base fee or 1.25% of valuation surcharge $1.00 or .0005 x value 2022 Fire Suppression/Hood Installation $100.00 + $1.00 surcharge 2022 5/29/24, 2:57 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 3/5 X-C-03 City Contractor License $50.00 State Contractor Verification Fee $5.00 Rental Housing Inspections Single Unit $50.00 per two years 1999 Duplex $75.00 per two years 1999 Duplex-owner occupied $50.00 per two years 1999 Triplex $95.00 per two years 1999 Fourplex $115.00 per two years 1999 Over 4 units $75.00 per building + $10.00 per unit 1999 Plan Review Fee 65% of building permit fee Electrical 0 to 40 Amp Power Source - Commercial $50.00 each 202 1 401 to 800 Amp Power Source - Commercial $100.00 each 202 1 Over 800 Amp Power Source - Commercial $150.00 each 202 1 0 to 200 Amp Circuit or Feeder $8.00 each 202 1 Over 200 Amp Circuit Feeder $30.00 each 202 1 Fees above shall be doubled if over 250 volts 202 1 Residential Panel Changes $100.00 each 202 1 New 1 & 2 family homes up to 25 circuits, 3 trips $175.00 202 1 Additional circuits over 25 per unit $8.00 each 202 1 Circuits extended or modified $8.00 each 202 1 5/29/24, 2:57 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 4/5 X-C-03 Retrofitting of existing lighting fixtures $0.25 each 202 1 Manufactured Home Park Lot Supply and Circuits $50.00 per Ped 202 1 Separate Bonding Inspection $40.00 202 1 Inspection of concrete encased grounding electrode $40.00 202 1 Technology circuits and circuits less than 50 volts $1.00 per device 202 1 Traffic signals, street, parking and outdoor lighting standards $5.00 each 202 1 Transformers for light, heat, and power (0 to 10 KVA)$20.00 each 202 1 Transformers for light, heat, and power (more than 10 KVA)$40.00 each 202 1 Transformers for electric power supplies and outline lighting $5.50 each 202 1 Additional inspection trip(s), Re-inspections, new load management devices $40.00 each 202 1 Replacement load management devices $15.00 each 202 1 City service fee if including items other than replacement of load management devices $10.00 202 1 Reduced city service fee (only for replacement load management devices)$4.00 202 1 State Surcharge $1.00 202 1 HISTORY Amended by Ord. 2009-04, 3rd Series on 2/17/2009 Amended by Ord. 2009-10, 3rd Series on 9/8/2009 Amended by Ord. 2010-05, 3rd Series on 3/15/2010 Amended by Ord. 2010-16, 3rd Series on 7/19/2010 Amended by Ord. 2011-03, 3rd Series on 2/7/2011 Amended by Ord. 2011-07, 3rd Series on 5/2/2011 Amended by Ord. 2011-16, 3rd Series on 8/1/2011 Amended by Ord. 2015-10, 3rd Series on 7/20/2015 Amended by Ord. 2021-03, 3rd Series on 2/16/2021 Amended by Ord. 2022-01 on 2/7/2022 5/29/24, 2:57 PM Print Preview https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 5/5 X-C-03