HomeMy WebLinkAboutVIII-06 1st Reading - Amend City Code Chapter 34 – Building Department Fees
City Council Memorandum
To: Mayor Fasbender and City Council
From: John Hinzman, Community Development Director
Lonnie Johnson, Building Official
Date: June 3, 2024
Item: 1st Reading: Amend City Code Chapter 34.03 – Fee Schedule – Building Department
Fees
Council Action Requested:
Consider 1st Reading of an amendment to Hastings City Code Chapter 34.03 – Fee Schedule to
modify certain Building Department fees. Upon consideration of 1st reading, 2nd reading, and
final adoption would be scheduled for the June 17th City Council Meeting. A simple majority is
necessary for action.
Purpose of Changes
The proposed amendment is presented to accomplish the following:
• Reduce duplicative permits for a single property by combining separate permits into an
all-inclusive permit for ease of tracking and monitoring.
• Ensure fees adequately cover the cost of staff review. Most fees have not been increased
since 2015.
Summary of Fee Changes
• Minimum Building Permit Fee - Increased from $50 to $100 – This is a “catch all” for
any inspection that does not have a specific permit fee in the code.
• Basement Finish\Remodel – Created an all-inclusive permit combining separate
building, plumbing, mechanical . Permit based on valuation of work. Existing fee is
approximately $325 regardless of size or extent of improvements. New fee would be
approximately $500 - $700 depending on size. A single bedroom would be as low as
$100 with new calculation.
• Decks – Fee to be based on a square foot calculation of the project with a minimum $100
fee. Currently charge a flat fee of $100. The fee for smaller decks is not expected to
change. Larger decks may increase to $166.
• Schedule A – General Construction Permit Fees – New title for fees listed under
“Building Permits”. Project valuations under $25,000 have been streamlined into two
categories with a minimum $100 permit fee (up from $50 for projects under $2,000)
• Schedule B - Building Valuation Worksheet – The amendment includes a building
valuation worksheet for larger permits for various types of work based on valuations for
different types of work. The valuations more closely reflect that of the real market.
VIII-06
• Mechanical Single Family Residential – The all-inclusive permits will include a flat
rate fee for the mechanical portion instead of separate fees for each appliance or ducts.
Plumbing will be similar.
• Mobile Home Installations – Combines separate gas line, water, and sewer connection
permits into an all-inclusive $350 permit. Current combined fees of separate permits are
$250 to $300.
• Establish a Re-Inspection Fee – Staff may assess if work to be inspected requires an
additional scheduled inspection. The $75 fee is an increase to the typical $50 fee.
• Inspection Fees Outside of Normal Business Hours – The existing $200 minimum fee
would continue. Inspections over two hours would increase to $75 per hour from $50 per
hour.
• Pergolas – Eliminated review fee; very uncommon.
• Sewer and Water Connection Inspect Combined – The separate inspection fees have
been combined into a singular inspection. No change in fees.
• Fire Sprinkler and Alarm – Establishing a $50 administrative fee for processing Fire
Department Permits.
Advisory Commission Review:
N\A
Advisory Committee Review:
N\A
Attachments:
• Ordinance Amendment
• Existing Ordinance
VIII-06
1
ORDINANCE NO. 2024-
AN ORDINANCE FOR THE CITY OF HASTINGS, MINNESOTA AMENDING
HASTINGS CITY CODE CHAPTER 34.03 – FEES SCHEDULE REGARDING
BUILDING PERMITS AND BUILDING SAFETY
The City Council of the City of Hastings, Minnesota does hereby ordain as follows:
SECTION 1. REPEAL AND REPLACE. The Code of the City of Hastings, State of
Minnesota, Chapter 34, Section 34.03, Fee Schedule – Building Permits is repealed in its entirety
and replaced as follows:
34.03 FEE SCHEDULE
Building Permits
Schedule A “GENERAL CONSTRUCTION PERMIT FEES is to be used for all permits when
no specific fee is provided. Permit fee valuation shall be a total value of work, including
materials and labor.
Schedule B “RESIDENTIAL BUILDING PERMIT VALUATION WORKSHEET” is to be used
for residential projects.
Commercial valuations provided may be adjusted according to the International Code Council
(ICC) published “BUILDING VALUATION DATA”. The permit applicant may be required to
show documentation of actual total cost for material and labor, which shall be approved by the
Building Official. (MN Rules 1300)
Schedule A – General Construction Permit Fees
Valuation Fee Surcharge
$1.00 to
$2,997.00
$100 $1.00
$2,998 to
$25,000.00
$100.00 for the first $2,997.00 plus $16.55 for
each additional $1,000.00, or fraction thereof, to
and including $25,000.00
x .0005 of job
valuation
$25,001.00 to
$50,000.00
464.15 for the first $25,000.00 plus $12.00 for
each additional $1,000.00, or fraction thereof, to
and including $50,000.00
x .0005 of job
valuation
$50,001.00 to
$100,000.00
$764.15 for the first $50,000.00 plus $8.45 for
each additional $1,000.00, or fraction therefore, to
and including $100,000.00.
x .0005 of job
valuation
$100,001.00 to
$500,000.00
$1,186.65 for the first $100,000.00 plus $6.75 for
each additional $1,000.00, or fraction thereof, to
and including $500,000.00.
x .0005 of job
valuation
VIII-06
2
$500,001.00 to
$1,000,000.00
$3,886.65 for the first $500,000.00 plus $5.50 for
each additional $1,000.00, or fraction thereof, to
and including $1,000,000.00
x .0005 of job
valuation
$1,000,001.00
and up
$6,636.65 for the first $1,000,000.00 plus 4.50 for
each additional $1,000.00, or fraction thereof
See State Surcharge
Computation below
Schedule B – Residential Building Permit Valuation Worksheet
Type Value per s.f.
Basement\Below Grade
- Crawl Space $15.00
- Mechanical Room $30.00
- Unfinished Space $30.00
- Finished Space (New) $50.00
- Finish Existing Basement (All-inclusive) $30.00
- Finish Existing Basement (Conversion – No Plumbing) $25.00
Single\Multiple Family Dwelling
- Main Floor $100.00
- Second Floor $100.00
- Unfinished Floors Above Grade $75.00
Garage
- Wood Framed $50.00
- Carport $30.00
Decks\Porches
- Covered Entry $50.00
- Screen Porch $75.00
- 3 Season $85.00
- 4 Season $95.00
- Decks $25.00
State Surcharge Computation
Construction Value Range Surcharge Computation
$1,000,001 to $2,000,000 $500 + .0004 x (valuation - $1,000,000)
$2,000,001 to $3,000,000 $900 + .0003 x (valuation - $2,000,000)
$3,000,001 to $4,000,000 $1,200 + .0002 x (valuation - $3,000,000)
$4,000,001 to $5,000,000 $1,400 + .0001 x (valuation - $4,000,000)
$5,000,000 or more $1,500 + .00005 x (valuation - $5,000,000)
Plan Review Fees
Review Type Fee
Full Plan Review 65% of building permit fee
Similar building plan review 25% of building permit fee
Brief Plan review 25% of full plan review
Decks, solar systems, interior finish, etc. $50
New Single-Family Dwelling $100
VIII-06
3
Commercial $100
Plans review performed prior to permit submittal and issuance or canceled
will be invoiced for the full plan review fee and must be paid prior to any
other permits issued to the applicant
Building Permit Applications received without a named contractor require
payment of the plan review fees prior to being accepted.
Exceptions: The Plan Review Fee is waived on the following for one-two
Family residential:
A. Minor non-structural remodel
B. Flat rate permits
C. Deck
Fees for Additional Plan Review
Review Type Fee
Decks, Solar Systems, Interior Finish, etc. $50.00
New Single-Family Development $100.00
Commercial $100.00
SECTION 2. REPEAL AND REPLACE. The Code of the City of Hastings, State of
Minnesota, Chapter 34, Section 34.03, Fee Schedule – Building Safety is repealed in its entirety
and replaced as follows:
34.03 FEE SCHEDULE
Building Safety
Commercial Building Permits
Permit Type Fee Surcharge
Commercial Building Permits See Schedule A See Schedule A
Residential Building Permit Fees
Permit Type Fee Surcharge
New single-family dwelling all inclusive (plumbing,
mechanical, fireplace, etc.)
See Schedule A See Schedule A
Interior Finish all inclusive (plumbing, mechanical,
fireplace, etc.)
See Schedule A See Schedule A
Bath all inclusive (plumbing and mechanical $100.00 $1.00
Gas Fireplace all inclusive (building and mechanical) $100.00 $1.00
Mobile Home Installation all inclusive (gas line, air
conditioning, water and sewer connections)
$350.00 $1.00
Decks
Permit Type Fee Surcharge
New Deck See Schedule A See Schedule A
Decks Resurface and Railings $100.00 $1.00
VIII-06
4
Demolition
Permit Type Fee Surcharge
Single Family Residential $150.00 $1.00
Commercial $200.00 $1.00
Electrical
0 to 40 Amp Power Source – Commercial $50.00 each
401 to 800 Amp Power Source – Commercial $100.00 each
Over 800 Amp Power Source – Commercial $150.00 each
0 to 200 Amp Circuit or Feeder $8.00 each
Over 200 Amp Circuit Feeder $30.00 each
Fees above shall be doubled if over 250 volts
Residential Panel Changes $100.00 each
New 1 & 2 family homes up to 25 circuits, 3 trips $175.00
Additional circuits over 25 per unit $8.00 each
Circuits extended or modified $8.00 each
Retrofitting of existing lighting fixtures $0.25 each
Manufactured Home Park Lot Supply and Circuits $50.00 per Ped
Separate Bonding Inspection $40.00
Inspection of concrete encased grounding electrode $40.00
Technology circuits and circuits less than 50 volts $1.00 per device
Traffic signals, street, parking and outdoor lighting
standards
$5.00 each
Transformers for light, heat, and power (0 to 10 KVA) $20.00 each
Transformers for light, heat, and power (more than 10
KVA)
$40.00 each
Transformers for electric power supplies and outline
lighting
$5.50 each
Additional inspection trip(s), Re-inspections, new load
management devices
$40.00 each
Replacement load management devices $15.00 each
City service fee if including items other than replacement
of load management devices
$10.00
Reduced city service fee (only for replacement load
management devices)
$4.00
State Surcharge $1.00
Fire
Permit Type Fee Surcharge
Administrative Fee $50.00 $0
Fire Sprinkler System $100.00 base
fee or 1.25% of
valuation
$1.00 or see
Schedule A
VIII-06
5
Fire Alarm System $100.00 base
fee or 1.25% of
valuation
$1.00 or see
Schedule A
Fire Suppression\Hood Installation $100.00 $1.00
Irrigation Systems
Permit Type Fee Surcharge
Originating from 1-inch water service or smaller $75.00 $1.00
Originating from greater than 1-inch water service $100.00 $1.00
Mechanical – Commercial
Permit Type Fee Surcharge
Commercial Mechanical Permit $100.00 base
fee or 1.25% x
valuation
$1.00
See Schedule A
Mechanical – Residential
Permit Type Fee Surcharge
Minimum Permit $75.00 $1.00
New Single-Family Dwelling – All Inclusive $300.00 $1.00
Interior Finish (if separate from all inclusive) $150.00 $1.00
New and Replacement Furnace (including gas piping) $75.00 $1.00
Mechanical Ventilation System (air to air) $75.00 $1.00
New Gas Piping with Air Test Only $75.00 $1.00
In-Floor Heat $75.00 $1.00
Garage Furnace $75.00 $1.00
On-Site Septic Systems
Permit Type Fee Surcharge
Single Family Residential $200.00 $1.00
Commercial (less than 750 gallons per day) $200.00 $1.00
Commercial (750 to 2,000 gallons per day) $200.00 + $40
County as-built
fee
$1.00
Reconstruction of Existing System (with City Council
approval)
$200.00 + $40
County as-built
fee
$1.00
Plumbing – Commercial
Permit Type Fee Surcharge
Commercial Plumbing Permit $100.00 base
fee or 1.25% x
valuation
$1.00
See Schedule A
VIII-06
6
Plumbing – Residential
Permit Type Fee Surcharge
Minimum Permit $75.00 $1.00
New Single-Family Development – All Inclusive $300.00 $1.00
Interior Finish (if separate from all inclusive) $150.00 $1.00
Replacement of Single Fixture (water heater, water
softener, etc.)
$75.00 $1.00
Plumbing Utilities
Permit Type Fee Surcharge
Sewer and Water Connection Inspection $100.00 $1.00
Relocation of Structures
Permit Type Fee Surcharge
Residential Dwellings $100.00 $1.00
Accessory Structures – less than 200 s.f. (Zoning Permit) $75.00 $0
Re-Roof
Permit Type Fee Surcharge
Residential (new tear off and repairs) $100.00 $1.00
Commercial $100.00 base
fee or 1.25% x
valuation
0.0005 x value
Re-Side
Permit Type Fee Surcharge
Residential (reside repairs) $100.00 $1.00
Commercial $100.00 base
fee or 1.25% x
valuation
0.0005 x value
Rental Housing Inspections
Permit Type Fee Frequency
Single Unit $50.00 per two years
Duplex (non-owner occupied) $75.00 per two years
Duplex (owner occupied $50.00 per two years
Triplex $95.00 per two years
Fourplex $115.00 per two years
Over Four Units $75.00 per building + $10.00 per unit per two years
Swimming Pools
Permit Type Fee Surcharge
Above Ground (separate mechanical permit) $100.00 $1.00
VIII-06
7
In-Ground or Partially In-Ground (separate mechanical
permit
$200.00 $1.00
Windows/Doors
Permit Type Fee Surcharge
Window\Door Replacement $100.00 $1.00
New Egress Windows $100.00 $1.00
New or Increased Opening See Schedule A See Schedule A
Zoning Permits
Permit Type Fee Surcharge
Fences $75.00 $0
Accessory Structures (between 75 and 200 s.f.) $75.00 $0
Other Permit Fees
Fee Type Fee Surcharge
Solar Photovoltaic $100.00 $1.00
Change of Use\Change of Occupancy $100.00 $0
Additional Fees
Fee Type Fee Surcharge
Reinspection Fee $75.00 $0
Refunds for Building Permit Fee (No refunds for plan
review)
75% of permit
fee
$1
Work Commencing Before Permit Issuance (special
investigative fee)
$100.00
Minimum (up
to building
permit fee
$0
Relocation of Structures $100.00 $1.00
Clearance Letter $5.00 $0
City Contractor License $50.00 $0
State Contractor Verification Fee $5.00 $0
Large Format Printing $5.00 per page $0
Single Family Dwelling Plan Pack $75.00 $0
Special Inspections
Permit Type Fee Surcharge
Additional Inspections $75.00 per hour $0
Inspections Outside of Normal Business Hours (Building
Official approved only)
$200 minimum
+ $75.00 per
hour after 2
hours
$0
Re-Open Expired Permit 50% of base fee $0
Expired Temporary Certificate of Occupancy 50% of base fee $0
VIII-06
8
SECTION 3. SUMMARY PUBLICATION. Pursuant to Minnesota Statutes 412.191,
in the case of a lengthy ordinance, a summary may be published. While a copy of the entire
ordinance is available without cost at the office of the City Clerk, the following summary is
approved by the City Council and shall be published in lieu of publishing the entire ordinance.
The text amendment adopted by the Hastings City Council on June 17, 2024 modifies the
City Fee Schedule pertaining to Building Department Fees and Building Safety Fees.
SECTION 4. EFFECTIVE DATE. This ordinance shall be in full force and effect from
and after its passage and publication according to law.
Passed this 17th day of June, 2024
_____________________________________
Mary Fasbender, Mayor
Attest:
____________________________
Kelly Murtaugh, City Clerk
Summary Publication Published in the Hastings Journal on June 20, 2024 and June 27, 2024
VIII-06
Building Permits
Building Permits
The following valuation is to be used for all general construction when no specific fee is provided.
Permit fees are reviewed and adopted by action of the council. Permit fee valuation shall be a total
value of work, including materials and labor. Verification of valuations used to establish building permit
fees will be held to the most current Building Valuation Data, published periodically by the International
Code Council or other Building Standards Publications. Valuations may require actual total cost
documentation provided by the permit applicant showing all costs for material and labor and approved
by the Building Official. (MN Rules 1300)
Valuation Fee Surcharge Year
$1.00 to $500 $50.00 x .0005 of job 2022
$501 to $2,000
$50.00 for the first $500
plus
$3.70 for each
additional $100, or
fraction thereof, to and
including $2,000
x .0005 of job 2022
$2,001 to $25,000
$83.50 for the first
$2,000 plus
$16.55 for each
additional $1,000, or
fraction thereof, to and
including $25,000
x .0005 of job 2022
$25,001 to $50,000
$464.15 for the first
$25,000 plus
$12.00 for each
additional $1,000, or
fraction thereof, to and
including $50,000
x .0005 of job 2022
$50,001 to $100,000
$764.15 for the first
$50,000 plus
$8.45 for each
additional $1,000, or
fraction thereof, to and
including $100,000
x .0005 of job 2022
$100,001 to $500,000
$1,186.65 for the first
$100,000 plus
$6.75 for each
additional $1,000, or
fraction thereof, to and
including $500,000
x .0005 of job 2022
5/29/24, 2:56 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Permits 1/2
VIII-06
$500,001 to $1,000,000
$3,886.65 for the first
$500,000 plus
$5.50 for each
additional $1,000, or
fraction thereof, to and
including $1,000,000
x .0005 of job 2022
$1,000,001 and up
$6,636.65 for the first
$1,000,000 plus
$4.50 for each
additional $1,000, or
fraction thereof.
See State Surcharge
Computation below 2022
State Surcharge Computation
Construction Value Range Surcharge Computation
$1,000,001 to $2,000,000 $500 + .0004 x (valuation - $1,000,000)
$2,000,001 to $3,000,000 $900 + .0003 x (valuation - $2,000,000)
$3,000,001 to $4,000,000 $1,200 + .0002 x (valuation - $3,000,000)
$4,000,0001 to $5,000,000 $1,400 + .0001 x (valuation - $4,000,000)
$5,000,000 or more $1,500 + .00005 x (valuation - $5,000,000)
Plan Review Fee
65% of the permit fee determined by valuation
25% of the permit fee for similar plans. (MN. R 1300.0160 subp. 6 B)
Plans review performed prior to permit submittal and issuance which are cancelled will be invoiced for
the full plan review fee and must be paid prior to any other permits issued to the applicant. Building
Permit Applications received without a named contractor require payment of the plan review portion of
fees prior to being accepted.
Exception: The Plan Review Fee is waived on the following for one-two family residential:
A) Minor non-structural remodel
B) Detached accessory structure provided floor area does not exceed 200 Sq. ft.
C) Above ground swimming pools
5/29/24, 2:56 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Permits 2/2
VIII-06
Building Safety
Refunds for Permit Fees 75% of permit fee No refunds for plan reviews 2008
Basic Permit Fee $50.00 + $1.00 surcharge 2015
Clearance Letter $5.00
Work commencing before permit issuance
Special investigation fee 2 x the building permit fee 2010
Special Inspections
Additional Inspections $50.00 per
hour
201
0
Inspections outside of normal business hours when
approved by Building Official
$200.00 minimum +
$50.00/hr. after 2 hrs.
201
0
Mobile Home Installation (Park only-gas piping not included)$200.00 + $1.00 surcharge 2021
Decks $100.00 + $1.00 surcharge 2015
New Business Occupancy Permit $75.00 2014
Windows
Door/Window replacement (total
replacement of window. Sash
replacement only exempt)
$100.00 + $1.00 surcharge 2022
Commercial Building Windows $100.00 base fee or 1.25% of valuation surcharge
$1.00 or .0005 x value 2015
5/29/24, 2:57 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 1/5
VIII-06
Re-Roof
Residential (new tear off &
repairs)$100.00 + $1.00 surcharge 2015
Commercial $100.00 base fee or 1.25% x valuation surcharge $1.00 or
.0005 x value 2015
Residing
Residential (reside or repairs)$100.00 + $1.00 surcharge 2015
Commercial $100.00 base fee or 1.25% x valuation surcharge $1.00 or
.0005 x value 2015
Plumbing
Residential and Commercial $100.00 base fee or 1.25% x valuation
surcharge $1.00 or .0005 x value
202
2
Installation or Replacement of Single Fixture
(water heater, water softener, etc.)$35.00 + $1.00 surcharge 201
5
Mechanical
Single Family Residential:
New & replacement furnace installation
(including gas piping)$75.00 + $1.00 surcharge 2015
Gas fireplace or other single gas appliance $50.00 + $1.00 surcharge 2015
Central Cooling or Ductwork $75.00 +$1.00 surcharge 2015
Mechanical ventilation system (air to air)$50.00 + $1.00 surcharge 2015
New gas piping with air test only $35.00 + $1.00 surcharge 2015
In floor Heat $50.00 + $1.00 surcharge 2015
Garage Furnace $50.00 + $1.00 surcharge 2015
Commercial $100.0 base fee or 1.25% x valuation surcharge
$1.00 or .0005 x value 2015
Irrigation System Installation
Systems originating from a 1" water service or smaller $75.00 + $1.00 surcharge 2015
Systems originating from a water service larger than 1"$150.00 + $1.00 surcharge 2015
5/29/24, 2:57 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 2/5
VIII-06
Utilities
Sewer Connection Inspection $50.00 + $1.00 surcharge 2015
Water Connection Inspection $50.00 + $1.00 surcharge 2015
Simultaneous Sewer & Water Connection Inspection $100.00 + $1.00 surcharge 2015
On-Site Septic Systems
Single Family Residential or Commercial $200.00+ $1.00 surcharge 201
5
Commercial 750 GPD to 2,000 GPD or Reconstruction of Existing
System (With approval from City Council)
Includes the fee above +
$40.00 county fee
201
0
Required Other Permits
Basement Finish/Remodel $150.00 + $1.00 surcharge 2015
Relocation of structures
Single Family Dwellings $100.00 no surcharge fee 2014
Accessory structures < 200 SF Zoning Permit Required 2022
Accessory structures > 200 SF $50.00 no surcharge fee 2022
Building Demolition
Accessory Structure $50.00 + $1.00 surcharge 2015
Single Family Residential $150.00 + $1.00 surcharge 2015
Commercial $200.00 + $1.00 surcharge 2015
Fire Sprinkler & Fire Alarm Systems
$1.00 and up 100.00 base fee or 1.25% of valuation surcharge $1.00 or
.0005 x value 2022
Fire Suppression/Hood Installation $100.00 + $1.00 surcharge 2022
5/29/24, 2:57 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 3/5
VIII-06
City Contractor License $50.00
State Contractor Verification Fee $5.00
Rental Housing Inspections
Single Unit $50.00 per two years 1999
Duplex $75.00 per two years 1999
Duplex-owner occupied $50.00 per two years 1999
Triplex $95.00 per two years 1999
Fourplex $115.00 per two years 1999
Over 4 units $75.00 per building + $10.00 per unit 1999
Plan Review Fee 65% of building permit fee
Electrical
0 to 40 Amp Power Source - Commercial $50.00 each 202
1
401 to 800 Amp Power Source - Commercial $100.00 each 202
1
Over 800 Amp Power Source - Commercial $150.00 each 202
1
0 to 200 Amp Circuit or Feeder $8.00 each 202
1
Over 200 Amp Circuit Feeder $30.00 each 202
1
Fees above shall be doubled if over 250 volts 202
1
Residential Panel Changes $100.00 each 202
1
New 1 & 2 family homes up to 25 circuits, 3 trips $175.00 202
1
Additional circuits over 25 per unit $8.00 each 202
1
Circuits extended or modified $8.00 each 202
1
5/29/24, 2:57 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 4/5
VIII-06
Retrofitting of existing lighting fixtures $0.25 each 202
1
Manufactured Home Park Lot Supply and Circuits $50.00 per Ped 202
1
Separate Bonding Inspection $40.00 202
1
Inspection of concrete encased grounding electrode $40.00 202
1
Technology circuits and circuits less than 50 volts $1.00 per device 202
1
Traffic signals, street, parking and outdoor lighting standards $5.00 each 202
1
Transformers for light, heat, and power (0 to 10 KVA)$20.00 each 202
1
Transformers for light, heat, and power (more than 10 KVA)$40.00 each 202
1
Transformers for electric power supplies and outline lighting $5.50 each 202
1
Additional inspection trip(s), Re-inspections, new load management
devices $40.00 each 202
1
Replacement load management devices $15.00 each 202
1
City service fee if including items other than replacement of load
management devices $10.00 202
1
Reduced city service fee (only for replacement load management
devices)$4.00 202
1
State Surcharge $1.00 202
1
HISTORY
Amended by Ord. 2009-04, 3rd Series on 2/17/2009
Amended by Ord. 2009-10, 3rd Series on 9/8/2009
Amended by Ord. 2010-05, 3rd Series on 3/15/2010
Amended by Ord. 2010-16, 3rd Series on 7/19/2010
Amended by Ord. 2011-03, 3rd Series on 2/7/2011
Amended by Ord. 2011-07, 3rd Series on 5/2/2011
Amended by Ord. 2011-16, 3rd Series on 8/1/2011
Amended by Ord. 2015-10, 3rd Series on 7/20/2015
Amended by Ord. 2021-03, 3rd Series on 2/16/2021
Amended by Ord. 2022-01 on 2/7/2022
5/29/24, 2:57 PM Print Preview
https://hastingsmn.municipalcodeonline.com/book/print?type=ordinances&name=Building_Safety 5/5
VIII-06