HomeMy WebLinkAboutVIII-15 Approve Change Order - Arena Roof Access Hatch City Council Memorandum To: Mayor Fasbender & City Councilmembers From: Chris Jenkins, Parks & Recreation Director Date: April 1, 2024 Item: Change Order #1 Roof Hatch Council Action Requested: Approve Change Order # 1 with Apex Facility Solutions Background Information: During a preconstruction contractor meeting for the Civic Arena refrigeration and roofing project, an idea was posed to add a permanent, user friendly roof hatch and steps for access to the roof areas of the Civic Arena. Staff at Apex have been working to solicit pricing information from our roofing contractor and have supplied that to the City. A permanent hatch and steps will allow staff and contractors safe and consistent access to the roofs of the Civic Arena, this will be even more important after a solar array is added to the west rink roof. City staff agree this is an important upgrade and is most efficient to include in the roofing contract. Financial Impact: This will be a $19,170.89 addition to the overall contract. Advisory Commission Discussion: None Council Committee Discussion: None Attachments: ▪ Change Order #1 VIII-15 Change Order Client: City of Hastings Change Order No: 1 Project: Hastings Civic Arena Renovation 3/25/24 The Contract is Changed as Follows: Original Contract Value:$217,391.00 Net Prior Change Orders:$5,000,313.00 Contract Value Prior to this Change Order:$5,217,704.00 This Change Order Add (Deduct):19,170.89$ New Contract Value after Change Order:$5,236,874.89 Contract Time will be increased by zero (0) days. The Date of Substantial Completions changes as follows: NOT VALID UNTIL SIGNED BY THE CONSTRUCTION MANAGER, CONTRACTOR AND OWNER Owner By (Signature) By (Typed) Date Mark Rasmussen By (Typed) Date Provide all labor and material to install 30x54" roof hatch on mezzanine level. Work includes cutting and removing of existing roofing and insulation as needed, install of roof hatch, infill voids in insulation to match existing roof height. New hatch will be made weather tight by roofer. Install of 70 degree ships ladder and safety rail on roof. All waste to be hauled by roofer. Apex Facility Solutions, SBC Construction Manager By (Signature) 13055 Riverdale Drive NW, Suite 500-211, Coon Rapids, MN 55304 www.apex-co.us3495 Northdale Blvd, NW, Suite 230 Coon Rapids MN 55448 VIII-15