400%
200%
100%
75%
50%
25%
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
PRC Packet-2024.1.17
City of Hastings Parks & Recreation 920 W 10th Street ▪ Hastings, MN 55033 ▪ Ph: 651-480-6175 ▪ www.hastingsmn.gov Parks & Recreation Commission Agenda Wednesday, January 17, – 6:00 PM City Hall – Council Chambers I. Call to Order 6:00 p.m. a. Determination of Quorum II. Park Dedication – Sunset West 3rd Addition 6:00 p.m. a. Community Development Director – John Hinzman III. Arena Concept Plan 6:30 p.m. IV. Department Updates 7:00 p.m. Next Meeting: Wednesday, February 21 at 6:00pm All times are approximate Park and Recreation Commission Memorandum To: Park and Recreation Commission From: John Hinzman, Community Development Director Date: January 17, 2024 Item: Park Dedication – Sunset West 3rd Addition – Greg J Homes Commission Action Requested Review the method of park dedication for the potential development of Sunset West 3rd Addition, a 41 lot single family subdivision proposed by Greg J Homes. The 10.65 acre property is generally located northwest of 15th Street and O’Connell Dr. Existing Condition The property is generally flat with interspersed trees of various sizes. Adjacent Uses The following uses abut the proposed park dedication North Residential – Prairie Ridge Townhomes East Residential – Single Family – Sunset West 2nd Add South 15th Street Agricultural land West Agricultural land PARK DEDICATION REQUIREMENTS Subdivision Ordinance City Code Chapter 154.07 establishes public land dedication requirements for subdivision of land. All property subdivisions resulting in the addition of buildable lots are subject to dedication requirements. The obligation can be fulfilled in the following ways: 1) Physical land dedication 2) Payment of cash in lieu of land 3) A combination of land dedication and cash. Option - Physical Land Dedication Physical land dedication would yield as follows: Sunset West 3rd Add - Physical Land Dedication Total Park Acres 700 Total Population 22,303 Acres per person 0.031 Persons Per household 2.37 Acres per household 0.074 Number of Units 41 Total Land Dedication (acres) 3.050 SITE LOCATION 1) All or part of the land has been previously designated as open space, park land, or trailway in the Comprehensive Plan. Analysis: Land immediately west of the subdivision has been identified for a future park location in the Comprehensive Plan. 2) A need for additional parks or recreational facilities will be generated by the development. Analysis: This development is projected to add 41 single family homes. Tierney Park is approximately 0.6 miles to the east and of the south of the site and Wallin Park is approximately 0.83 miles to the southeast. Neighborhood parks should be no greater than 0.5 miles from a development. 3) The land adjoins an existing park or school open space property. Analysis: The land does not adjoin an existing park or school open space property. 4) The land could serve as a buffer between commercial\industrial property and residential. Analysis: The land does not abut a commercial\industrial property. 5) The land contains or abuts unique topographical features. Analysis: Most of the property is flat with interspersed trees. Option - Cash in Lieu of Land Payment of cash in lieu of land is based upon the number and density of residential development to be constructed. A total cash payment of $131,200 ($3,200 x 41 units) would be required under this option at the present rate. Payment would be made at the time of final plat. Attachments • Location Map • Development Plan LOCATION MAP SITE LOCATION HASTINGS CIVIC ARENA RENOVATION + ADDITION HASTINGS, MINNESOTA Hastings Civic Arena + Hastings, MN + ISG Project Number: 23-29433 + November 22, 2023 Page 1 of 6 First Floor Plan FEET 05100150250 Cô]ãÈØ©hÂØ¼óã]ã¯Â©ʞɷʍɾɶɶ](ʟ CôYÜãØÈÈÁ©¯Â©YÈÈÁ(¯Â¯ÜhÕ©ØÜ õ¯Üã¯Â©=ȹØYÈÈÁ(¯Â¯ÜhÕ©ØÜ ]ÈÈã¯Â©]ãã¯È Bç¼ã¯ÕçØÕÈÜYÈÈÁ Cô=Èö]Õ¯ã¯È I¨¨¯Ü dÁYÈÈÁ NORTH * Côd¯Ø]ã¯Â©ô¯ã]ãÈØ©Âã) + , ]ãÈØ©¯ã¯ÈÂ- . / && && ( ' % * - + , + / .0 % % $ % & ' ( CôV¼öØÂãØÂ¯ã¯È Cô=ȹØYÈÈÁÜ 0 Cô¼óãÈØdÈã¼(¯ØÜã(¼ÈÈØCôÈÂÜãØçã¯ÈÂ](ʌɻʍɽɶɶ]( $)) Hastings Civic Arena + Hastings, MN + ISG Project Number: 23-29433 + November 22, 2023 Page 2 of 6 Second Floor Plan YÁÕÂÈÂÂã¯È VÈÜܯ¼B¯¼×ç¯ÕÁÂãÈóÈÂÜܯÈÂÜ Cô¼óãÈØ CôBã¯Â©ʘóÂãYÈÈÁʞɽɶɶ](ʟ B¯¼ʘ]ãÈØ© YÜãØÈÈÁÜõÕÂV¼ã¨ÈØÁÂ*¼ÜÜw¼¼¨ÈØwØÁt¯ô¯Â©Ø Côw¯ÂÈôܯÂãÈ.ȹöY¯Â¹(¯©çØ]¹ã¯Â©Â9çÁÕ.ØÂÜÜ=Èã¯È ÈÂÜܯÈÂÜ CôwØÁt¯ô¯Â©Â]ã¯Â©Ø or Plan FEET 05100150250 N O R T H * + , - . / 0 -. / , * 1 0 , + $ % & ' dÈã¼]ÈÂ(¼ÈÈØCôÈÂÜãØçã¯ÈÂ](ʌɺʍɺɶɶ]( Côd¯Ø]ã¯Â©w¯ã]ãÈØ©Âãʞɸʍɶɶɶ](ʟ VÈÜܯ¼B¯¼YÈÈÁYȨ¯©çØã¯È Côd¯Ø]ã¯Â©ô¯ã]ãÈØ©Âã) ( 1 $) && ' ) % ( Hastings Civic Arena + Hastings, MN + ISG Project Number: 23-29433 + November 22, 2023 Page 3 of 6 FRONT ENTRANCE EXTERIOR RENDERING Hastings Civic Arena + Hastings, MN + ISG Project Number: 23-29433 + November 22, 2023 Page 4 of 6 LOBBY INTERIOR INTERIOR RENDERING Hastings Civic Arena + Hastings, MN + ISG Project Number: 23-29433 + November 22, 2023 Page 5 of 6 SECOND FLOOR INTERIOR RENDERING Hastings Civic Arena + Hastings, MN + ISG Project Number: 23-29433 + November 22, 2023 Page 6 of 6 SEATING RENOVATION INTERIOR RENDERING 24980ISG Project #: 23-294330Date: 11/10/20230/00/0000RateActual Construction CostCost / SF-$ 27.22$ 8.87$ 32.28$ 7.46$ 9.59$ 10.16$ 7.77$ 19.01$ 3.38$ 1.72$ -$ -$ -$ 3.84$ 4.00$ 6.73$ 32.71$ 19.87$ 7.62$ 6.95$ -$ -$ -$ $ - $ - -$ 10.00%-$ 20.92$ -$ 0.00%-$ -$ $ - $ 230.11 25.00%-$ 57.53$ FF&E50%Testing/Design/and soft costs50% $ - -$ -$ $ - $ 287.63 42,915.00 239,640.00 253,900.00 194,200.00 474,840.00 84,335.00 Estimated Construction Cost680,003.70$ 221,606.00 806,380.00 186,375.00 Probable Project Cost SummarySCHEMATIC DESIGN PHASEBldg SF:Time (Months):Revision Date:Hastings Civic Arena StudyHastings MinnesotaProject DescriptionProject Description (2)- - - 96,000.00 99,920.00 Division 14 - Conveying Systems1,437,007.81$ 718,503.91$ 718,503.91$ -$ $ - 522,548.29$ -$ - - - $ 5,225,482.95 SUMMARY $ 7,185,039.05 Division 1 - General RequirementsDivision 2 - Existing Conditions & DemolitionDivision 3 - ConcreteDivision 4 - MasonryDivision 5 - MetalsDivision 6 - Wood and PlasticsDivision 7 - Thermal and Moisture ProtectionDivision 8 - Doors and WindowsDivision 9 - FinishesDivision 10 - SpecialtiesDivision 11 - EquipmentDivision 12 - FurnishingsDivision 13 - Special ConstructionDivision 33 - UtilitiesPROJECT COST TOTALTotal Construction Cost $ 5,748,031.24 Other Costs Identified By OwnerDivision 21- Fire SuppressionDivision 22- PlumbingDivision 23 - HVACDivision 26 - Electrical-$ 168,000.00 817,100.00 496,368.25 190,225.00 173,675.00 Soft CostsContingenciesRegional Adjustment FactorsDivision 27 - CommunicationsDivision 28 - Electronic Safety & SecurityDivision 31 - EarthworkDivision 32 - Site ImprovmentsConstruction Cost SubtotalArchitecture + Engineering + Environmental + PlanningISGInc.com1 of 1