HomeMy WebLinkAboutX-B-01 Agreement Amendment #1 with Apex Facility Solutions, LLC
City Council Memorandum
To: Mayor Fasbender & City Councilmembers
From: Chris Jenkins, Parks & Recreation Director
Date: August 21, 2023
Item: Agreement Amendment #1 with Apex Facility Solutions, LLC
Council Action Requested:
Approve Amendment #1 for the Guaranteed Energy Savings Agreement
with Apex Facility Solutions, LLC for the Refrigeration Plant Replacement,
West Rink Roof Replacement, and Solar System Installation projects at the
Hastings Civic Arena.
Background Information:
These projects have been identified as needed facility upgrades, and
Council has provided their commitment to completing both of these projects
in 2024.
The refrigeration plant replacement requires up front design and engineering
services to be completed, and the plants motor control center also needs to
be ordered well in advance of the project due to long lead times for specialty
equipment.
The design and engineering have been completed and we are prepared to
order the motor control center, and lock in a roofing contractor for a 2024
West Rink roof replacement with this amendment.
Minnesota Statute 471.345 subd. 13 allows the City to enter into a
Guaranteed Energy Savings Agreement such as what is proposed. Using
this statute does require the City to publish our intent to enter into this
agreement, which was completed in the June 22, 2023 edition of the
Hastings Journal. This agreement must also guarantee energy savings over
the 20-year life of the agreement, which it does.
Entering this agreement with Apex allows them to act as our general
contractor, solicit quotes from pre-qualified contractors for each individual
component of the project, which city staff will review and approve as
appropriate, and allows each of the major components of the project to be
added by amendment.
X-B-01
Financial Impact:
The motor control centers are guaranteed at a cost of $258,929.00, and as
long lead items (50-70 weeks), it is time to place the order.
The West Rink roofing replacement project is guaranteed at a cost of
$1,161,746.00 for a 2024 project.
Advisory Commission Discussion:
N/A
Council Committee Discussion:
Attachments:
▪Amendment #1
▪Roofing bid tabulation
▪Refrigeration project bid tab for MCC breakout
▪Apex Facility Solutions, LLC agreement (fully executed)
X-B-01
AmendmentApex Facility Solutions, LLC
Client: City of Hastings Amendment No: 1
Project: Hastings Civic Arena Upgrades 8/16/2023
Apex Project No: 30323036
The Contract is Amended as Follows:
This Amendment 1 modifiys the existing Agreement to add more detailed scope of work and costs for the roofing and MCC line itmes on the agreement. The
following changes to the agreement are included in this Amenedment.
1. Replace the Agreement Exhibit A Scope of Work with the attached new Exhibit A.
2. Replace the Agreement Exhibit B Schedule of Payments with the attached new Exhibit B.
3. Section 10.0 Compensation and Payment: replace the Construction Work list with the following updated list.
Construction Work
Refrigeration System Motor Control Center (long lead item)$258,929.00
Refrigeration System TBD and added by Amendment
Roof Replacment West Rink $1,161,746.00
Solar on West Rink TBD and added by Amendment
Original Contract Value:$217,391.00Net Prior Amendments:$0.00Contract Value Prior to this Amendment:$217,391.00
This Amendment Add (Deduct):$1,420,675.00New Contract Value after Change Order:$1,638,066.00
NOT VALID UNTIL SIGNED BY THE CONTRACTOR AND CLIENT
Apex Facility Solutions, LLC City of Hastings
Contractor Client
By (Signature)By (Signature)
By (Printed)By (Printed)
Date Date
Attachments:
Exhibit A Summary of Work
Exhibit B Payments Schedule
3495 Northdale Blvd. NW, Suite 230, Coon Rapids, MN 55448 www.apex-co.us Page 1
X-B-01
EXHIBIT A
SUMMARY OF WORK
EXHIBIT A Page 1 of 6
Exhibit A – Summary of Work
Definitions:
CLIENT shall also be referred to as OWNER and/or HOST.
CONTRACTOR shall also be referred to as APEX and/or DEVELOPER.
Scope General:
Scope of work shall be development and construction of the following major scopes of work:
•Refrigeration Design
•Long Lead Equipment Procurement
•Replacement of Existing Refrigeration System
•Replacement of West Rink Roof
•Install Solar on the West Rink Roof
Refrigeration Design: Refrigeration design shall include design required for the replacement of the existing
refrigeration system located at Hastings Civic Arena with a new two rink industrial grade ammonia refrigeration
system and identification and specification of any long lead equipment required to support a Summer 2024
installation schedule.
Work Included:
•Ice System engineering includes one industrial grade refrigeration system and waste heat recovery
systems (subfloor heating, snow melt pit system).
•Mechanical engineering including ventilation system for new ice equipment room, eyewash shower
systems, connection to fire alarm system, and plumbing modifications as necessary.
Apex Facility Solutions
Location Cost
Guaranteed
Utility Savings
Annual O&M
Savings
One Time
O&M Savings
Potential
Incentives Net Cost
Simple
Payback
Ice Arena $258,929 $0 $0 $200,000 $0 $58,929 N/A
Ice Arena $217,391 $16,241 $7,000 $0 $0 $217,391 9.4
West Ice Sheet $1,161,746 $0 $0 $800,000 $0 $1,161,746 N/A
Ice Arena $0 $0 $0 $0 $0 $0 N/A
Ice Arena $0 $0 $0 $0 $0 $0 N/A
$1,638,066 $16,241 $7,000 $1,000,000 $0 $1,438,066 18.8Totals
Refigeration Design - Design of the ice rink
refigeration system to size the MCC
Roofing - Replace existing Roof with new
built up roof, new drains, and parapits
Other Scope Items
Ice Arena Long Lead Items
Work Description
MCC - Purchasing of new Motor Control
Center for the ice plant
Refrigeration system - Replace existing
R22 system with new refigeration system
Solar System - Install new Solar PV System
on the West Roof
X-B-01
EXHIBIT A
SUMMARY OF WORK
EXHIBIT A Page 2 of 6
•Electrical engineering including new electrical feeder to new ice equipment motor control center if
needed and to the new mechanical equipment, convenience receptacles, and lighting modifications in
the new ice equipment room.
•Architectural and structural design for enclosing the existing mechanical room for code compliant room,
condenser supports, pipe penetrations, etc.
•Demolition drawings for systems mentioned above.
MCC: As part of the development of the ice arena refrigeration plant, two MCCs were necessary to provide the
plant with power. One of the units would be located in the Ammonia refrigeration room to power the
compressors and accessories in that room. The second would be in the pump room that would power the main
rink pumps, and other aspects of the refrigeration plant. These electrical parts are critical to the function of the
plant.
X-B-01
EXHIBIT A
SUMMARY OF WORK
EXHIBIT A Page 3 of 6
Replacement of Refrigeration System: Replacement of the existing refrigeration system shall include
replacement of the existing refrigeration system with a new two rink ammonia refrigeration system. The final
cost of this work shall be added to the Agreement by Amendment after scope of work is rebid and final price is
established.
X-B-01
EXHIBIT A
SUMMARY OF WORK
EXHIBIT A Page 4 of 6
Replacement of West Rink Roof: Work under this scope item shall include replacement of the existing west rink
flat roof with a new modified built-up roof, and new metal perimeter roofing with flashing. A new ladder would
be installed from the lower roof for safe access to the higher roof.
In addition to the new flat roof, perimeter edging will be installed to eliminate the flat roof water from going
over the edge. With new sloped insulation and roof drainage, new interior roof drains will be installed to take
the water away. The water will be discharged into an existing rain water system in the parking lot.
Below is the scope of work for the roofing project:
X-B-01
EXHIBIT A
SUMMARY OF WORK
EXHIBIT A Page 5 of 6
X-B-01
EXHIBIT A
SUMMARY OF WORK
EXHIBIT A Page 6 of 6
Solar on West Rink Roof: Work under this scope item shall include installation of new Solar PV system that will
be tied into the building electrical system. The photo below represents the approximate location of the new
system. Work shall be code compliant, and the final cost of this work shall be added to the Agreement by
Amendment after scope of work is rebid and final price is established.
X-B-01
EXHIBIT B
PAYMENTS SCHEDULE
EXHIBIT B Page 1 of 1
Exhibit B – Estimated Payments Schedules
Item Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-24 Aug-24 Sep-24 Oct-24
1 Design $223,826 $111,913 $111,913
2 Long Lead Equipment (MCC) $258,929 $129,465 $129,465
3 Roofing $1,161,746 $290,437 $290,437 $290,437 $290,437
4 Refrigeration TBD Install Install Install Install Install Install Install
5 Solar PV TBD Install Install
Totals $1,644,501 $111,913 $111,913 $0 $129,465 $0 $0 $290,437 $0 $0 $0 $290,437 $419,901 $290,437 $0 $0 $0
Spring Roof Option
X-B-01
Roofing
Contractors Berwald Roofing Mc Phillips Bro Peterson Bro Palmber West
Base Bid 1,121,689$ 1,076,677$ 1,017,680$ 1,081,056$
Ladder Add 16,592$ 16,930$ 15,395$ 15,689$
Sub Total 1,138,281$ 1,093,607$ 1,033,076$ 1,096,745$
Plumbing
Contractors
Commercial
Plumbing
Signature
Mechanical
Base Bid 129,607$ 128,670$
Selected Contractors
Total Cost Peterson Bro 1,033,076$
Signature 128,670$
Total 1,161,746$
City of Hasting Roofing Project Bid Tab
Confidential 8/17/2023 Page 1
X-B-01
Refrigeration
Contractors
Rink Tec
International
Gartner
Refrigeration SCR
Base Bid 2,677,574$ 2,734,850$ No Bid
MCC - Breakout 258,929$ 264,467$
Alt - Temp Chiller 3
Months 104,628$ 152,383$
Sub Total 2,782,202$ 2,887,233$
Mechanical
Contractors NAC Kraft Mechanical SCR
Base Bid 215,235$ 188,330$ 220,526$
Electrical Contractors CAP Electric Phaser Electric
Base Bid 85,496$ 121,070$
General Construction
Guptil
Construction 4 Others no Bid
Base Bid 46,449$ -$
Concrete
Construction Fritz Concrete KPW Concrete
Base Bid 53,002$ 8,324$
Fencing Contractors Superior Fencing Dakota Unlimited
Base Bid 9,664$ 11,784$
Selected Contractors
Rink Tec
International 2,782,202$
Kraft Mechanical 188,330$
CAP Electric 85,496$
Guptil Construction 46,449$
KPW Concrete 8,324$
Superior Fencing 9,664$
City of Hasting Refrigeration Project Bid Tab
Confidential 8/17/2023 Page 1
X-B-01
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1
X
-
B
-
0
1